Information
-
Site
-
Postcode:
-
Job Number Reference
-
Point of Work RA by:
-
Date:
Risk Assessment
-
Works job pack information (inc; specifications) on-site & process understood.?
-
CPHSP & RAMS applicable to works / briefed to the operative-engineers (inc; SC's) & sign to confirm understood.?
-
Site supervisor /team leader in place & operative-engineers aware of lines of communication.?
-
Site operative-engineers hold relevant qualifications to undertake the tasks on site (Hard or soft copy).?
-
Relevant plant /tools /equipment suitable to the task /in a good state of repair & fit-for-use.?
-
Site operative-engineers hold relevant qualifications to utilise plant /tools /equipment on-site.?
-
Permits-to-Work in-place & signed off.?
-
Suitable signage in-situ (inc; notice board where required) to ensure all public are aware no unauthorised site-access.?
-
Suitable guarding barriers in place & interlocked (inc; material compounds) to ensure no unauthorised site-access.?
-
General site-specific PPE being worn & in good condition.?
-
Relevant work-at-height access equipment suitable to the task & inspected fit-for-use.?
-
All work-at-height safety PPE available, suitable to the task & inspected fit-for-use.?
-
Environmental hazards identified, suitably controlled & protected (inc; waste disposal, dust or noise, watercourses, wildlife).?
-
Emergency arrangements in-place (inc; 1st aiders/1st aid kit /fire-alarm-fighting equipment) & including CityFibre reporting procedure.?
-
Suitable & sufficient welfare provisions in-place.?
-
Daily 'Point-of-Works or Dynamic Risk Assessment' in-place.?
Photographs of Area / Equipment in place
-
Photographs of area pre setup
-
Photographs of area set up
Sign Off
Sign Off
-
Additional Notes / Information
-
Contractor Name
-
Operative (SCCI Alphatrack or on behalf)
-
Supervisor (City Fibre)
-
Completed Sign Off