Information
-
Site
-
Postcode:
-
PN I.D:
-
GRID:
-
Test Rod and Rope by:
-
Date:
Test Rod and Rope
Site Information
-
Surface Type and Lengths:
-
Start and End Point of Required Work
-
Photo of Lead-in Chamber (closed)
-
Photo of Lead-in Chamber (open)
-
Photo of MDU Lead-in
-
Lead-in Infrastructure blocked?
-
Have 25mm rods been used?
-
If 25mm rods have not been used BT Openreach will reject and possible fines incurred
-
Photo of 25mm rod in use in Lead-in chamber
-
Comments (Please outline any findings / information)
-
Photo of 25mm Rod in use at Upturn
-
Photo of 25mm rod in use in MDU Lead-in
-
Comments (Please outline any findings / information)
-
Distance of the blockage from lead-in chamber (metres)
-
Comments (Please outline any findings / information)
-
Photo of Blockage Location Spray Painted
-
Comments (Please outline any findings / information)
-
Photo of Installed Rope / BFT in Lead-in chamber
-
Photo of Installed Rope / BFT in MDU Lead-in
Sign Off
Sign Off
-
Additional Notes / Information
-
Name
-
Completed Sign Off