No Power Troubleshooting

  • What is the installation type?

  • Is there power at customer POE/ External CSP

  • Have you shined the red light from POE/ External CSP

  • Can you see the red light in the FDH

  • Are you sure you are troubleshooting in the correct FDH

  • Please take a walk around the building and locate the FDH (Add Media)

  • Please take a pic of the FDH With lables as this could be a main fault in the line

  • Please find the correct FDH in order to continue with this form

  • Have you locate your customers fibre port

  • Take a picture of the current power reading

  • Patch your customer to the live fibre port

  • Take a picture of the FDH properly closed and supported

  • Can you see the red light

  • Take a walk round the building and upload pictures

  • You may have the wrong FDH location

  • If you have done all the above the main customer line could be damaged.

  • Why

  • Is there power at the CSP

  • Shine the red light from CSP to FDP

  • Take a picture of the red light in the FDP

  • Is there power in the splitter out FDP

  • Splice your customer to the live fibre

  • Neatly wrap and secure the spliced fibre

  • Take a picture of the joint complete ready for closure (Must include FDP name/number)

  • Take a picture of the FDP closed and properly secured in the chamber( name and number must be visable)

  • Is there power at all in the FDP

  • This is a network build issue (Pls provide pictures of main cable coming in has been tested to show no power)

  • Is there power in the CSP

  • Shine the red light from CSP to ASN

  • Take a picture of the ASN showing no power

  • Take a picture of the ASN showing red light passing through (from the back of the ASN)

  • Does the main cable comming to ASN have power (Please add pictures)

  • Trace the ASN main cable to locate where power should be coming from

  • Open the FDP and locate red light

  • Find a spare live fibre in the FDP

  • Splice the fibre to ensure ASN becomes live

  • Wrap and secure the FDP after fibre splicing

  • Take a picture of the FDP securely closed and supported in the chamber (FDP number/name must be visable)

  • Splice the splitter to the main coming in

  • ASN should now be live

  • You should not be using this form, please use pre and post install

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.