Title Page
-
Document No.
-
Survey title
-
Client
-
Job number
-
Conducted on
-
Prepared by
-
Location
Property details
-
Property type:
- House
- Bungalow
- Flat
- Other
-
Enter storey/level
- 1
- 2
- 3
- 4
- 5
- 6
- Other
-
Number of bedrooms
- 1
- 2
- 3
- 4
- 5
Existing boiler details
-
Boiler type
-
Is it a condensing boiler?
-
Location
-
Manufacturer
-
Model
-
Flue type
-
Fuel type
-
Boiler output (KW)
-
Photo of existing appliance
-
Photo of flue termination
New boiler details
-
Recommended new boiler details
- Vaillant EcoTec Plus 824 (Combi)
- Vaillant EcoTec Plus 831 (Combi)
- Vaillant EcoTec Plus 612 (System)
- Vaillant EcoTec Plus 615 (System)
- Vaillant EcoTec Plus 618 (System)
- Vaillant EcoTec Plus 624 (System)
- Vaillant EcoTec Plus 630 (System)
- Vaillant EcoTec Plus 415 (Heat Only)
- Vaillant EcoTec Plus 418 (Heat Only)
- Vaillant EcoTec Plus 428 (Heat Only)
- Vaillant EcoTec Plus 438 (Heat Only)
- Other
-
Details
-
Photo of new boiler position
-
Enter details of new boiler including height off work tops etc
-
Flue type
-
Details of flue system route
-
Photo of new flue terminal position
-
Details of flue termination
-
Photo of condense pipe route
-
Enter details for condense pipe route
Existing system details
-
Does existing system comply with Part L?
-
Details
-
Type of system fitted
- Fully pumped Y plan
- Fully pumped S plan
- Gravity hot water/pumped heating
- One pipe system
- Gas fire only
- Combi
- Other
-
Size of hot water cylinder
-
Hot water cylinder to be replaced
-
Details of new cylinder
-
Photo of existing hot water cylnder
-
Recommended controls required
- Honeywell Y Plan Pack (Wired)
- Honeywell S Plan Pack (Wired)
- Honeywell single channel time clock with room-stat (Wireless)
- Honeywell twin channel time clock with room&cylinder stat (Wireless)
- Other
-
Details of controls required
-
Thermostatic radiator valves fitted to existing system
-
Is the system sealed/pressurised?
-
Is system to be sealed and tank removed?
-
Details
Radiators
-
If combination boiler is being fitted and cylinder removed, is a radiator required in the airing cupboard?
-
Details of new radiator
-
Kitchen radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size and location for new kitchen radiator
-
Hall radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size and location for new hall radiator
-
W.C radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size, type and location of new W.C radiator
-
Lounge radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size and location of new lounge radiator
-
Dining room radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size and location of new dining room radiator
-
Bedroom 1 radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size and location of new bedroom 1 radiator
-
Bedroom 2 radiator size and type
-
New radiator to be same size, type and location of existing?
-
Details of new size, type and location of new bedroom 2 radiator
-
Bedroom 3 radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size, type and location of new bedroom 3 radiatorq
-
Bedroom 4 radiator size and type
-
New radiator to be same size, type and location as existing?Yes
-
Details of new size, type and location of new bedroom 4 radiator
-
Bathroom radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size, type and location of new bathroom radiator
-
Landing radiator size and type
-
New radiator to be same size, type and location as existing?
-
Details of new size, type and location of new landing radiator
-
Details of any additional radiators
Electrical
-
17th Edition fuse board fitted
-
Cross bonding required
-
Existing hard wired CO fitted in room to contain new boiler
-
Is it in date?
-
New hard wired CO alarm required
-
Details/location
Gas pipework
-
Details of gas pipework alterations required: Route, size, length etc
-
Photo of gas meter/gas bottle installation
-
Notes
Scaffolding
-
Is scaffolding required?
- Yes
- No
-
Details: Number of lifts, platforms required etc
-
Photos indicating location for tower and work area
-
Notes
Description of works to be carried out
-
Trades required to complete works
- Gas Engineer (N.G)
- Gas Engineer (L.P.G)
- Oil Engineer
- Electrician
- Builder/multi trader
- Other
-
Details of other trades required
-
Description of works to be carried out
-
Estimated time required to complete works
- 1 Day
- 2 Days
- 3 Days
- Other
Any other information
-
Details
Surveyors signature
-
Signature