Title Page

  • Site conducted

  • Principal Contractor

  • Conducted on

  • Prepared by

  • Location
  • G&H Project manager

  • G&H Manager/Supervisor

Principal Contractor

  • PC responsibilities witnessed at previous audits - F10 notification - Insurance, Traffic management, CDM site rules, Rules for deliveries, Fire safety plan, construction phase plan, HSE law poster, Site induction, Site security,

  • Plant and equipment left secured and isolated

  • Footpaths and access ways clear of debris

  • Safe access & egress to site

Documentation

  • Health and Safety Policy

  • Risk assessments

  • Method Statement

  • Equipment registers/PAT

  • Training Certification

  • Accident forms - Any accident since the last audit.

  • Has accident investigation been completed.

  • Permit to work - Evidence of permits carried out since the last audit.

  • Site inductions

  • Tool box talks carried out - since the last audit.

Welfare

  • Hot & Cold Running Water

  • Soap & Towel

  • Wholesome supply of drinking water

  • Canteen & Tidy Facilities

  • First aid kit available

  • Is it adequately stocked for injuries that likely to occur.

  • Is there an adequate amount of first aid stations available?

  • Are the contents of the first aid kit in date

  • Eye wash Stations available

  • Are the contents in date?

Work equipment

  • Guards in place

  • Maintenance Records on site

  • Trained operatives

COSHH/Health Hazards

  • COSHH and safety data sheets present

  • Relevant operations identified

  • Suitable PPE Available

  • Persons suitably trained since the last audit.

Environment

  • Regular empty/return of skips

  • Waste segregation systems in use? (Is recycling encourage)

  • Special Waste Identified?

  • Transfer Note Available

  • Contamination precautions

  • Dust/Fume Precautions

  • Noise issues

  • Is the waste management plan available

  • Environmental Tool box talks carried out.

  • Has the mileage form been completed by all site operatives

  • Have operatives completed the method of transport form

Asbestos

  • Was the building constructed prior to 2000

  • Asbestos Survey in place

  • Are controls in place to protect workers from Asbestos

  • Have operatives been adequately trained to identify the potential of Asbestos?

General

  • Safe storage for tools and materials

  • Good house keeping

  • PPE/RPE available

  • Correct use of PPE and RPE

Health

  • Dust - dust suppresion in place

  • Dust - Masks

  • Correct selection of masks

  • Face fit testing carried out

  • Vibration control

  • Anti vibration devices installed on work equipment

  • Trigger times identified

  • Vibration monitoring in place

  • Noise Control

  • Are operatives exposed to Noise

  • Has hearing protection been provided?

  • Is hearing protecting being worn within designated areas or when high level of noise is being produced.

Fire Safety

  • Suitable Extinguishers in place

  • Inspected & in good order

  • Emergency Fire orders posted

  • Assembly points in place

  • Trained personnel

  • Fire safety plan complete

Electricity

  • 110v used on site

  • Plugs and leads in good order

  • Trailing cables not causing hazards

Parts/Whole of the site has been made live

  • Has the G&H electrical policy procedures been put in place ?

  • Has signage been put in place to highlight that the electrical system is now live

  • Are live areas locked off and controlled correctly?

Confined Space

  • Are there areas that could be identified as a confined space?

  • Specific risk assessment in place?

  • Rescue Plan in place?

  • Mitigating measures in place?

  • Trained Operatives for working in a Confined space

Working at height

  • Scaffolding

  • Scaffolding - Suitable handed over & Inspected

  • Scaffolding - Erected by competent persons only

  • Scaffolding - Guards/rails/toe boards/brick guards in place

  • Use of MEWPS

  • Is the machine in LOLER?

  • Does the machine have an operators manual

  • Does the operator and passenger have correct training?

  • Is there a rescue plan in place?

  • Are the users wearing a harness and the correct lanyard?

  • General safe working at height.

Any other items

  • Any Other items

  • Safety of the site and operations.

  • Audit Completed By

  • Client Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.