Information
-
Site Address
-
Conducted on
-
Contract + No.
-
Piling rig
- S60
- SF50
- SR30
- SR20
- Klemm 708
- T15000
- TD 308
- Drop Hammer
-
Personnel/Site Operatives
-
Location
-
Prepared by
A: Welfare, Access and Site Set Up
-
2. Are suitable rest areas provoded.
-
3. Are food eating/heated areas provided.
-
4. Is there facilities for drying/changing clothes.
-
5. Is a safe means of access/egress provided.
-
6. Is work area firm, level & suitable.
-
7. Working areas free of obstruction.
-
8. Is the required working area clear and available.
-
9. Is the working area tidy (Housekeeping.
-
10. Are all access and egress areas clear.
-
4. Are all traffic routes signed.
-
11. Are vehicles & pedestrians segregated.
Job specific Checks
-
1. Any overhead cables in piling area.
-
2. Have any service been identified and or marked
-
3. Has the NFS permit to dig (PTD) been signed
-
5. Are any other permits required
-
Additional permits include
- Hot Works Permit
- Permit to Work
- Excvation Permit
- Permit to Dig
-
6. Have levels been agreed and identified on site.
-
7. Are NFS completing the setting out
-
What is the setting out status
- complete by NFS
- complete by others
- not yet complete
-
8. Has the setting out be completed, checked and agreed.
-
9. Is integrity testing required
-
testing status
- testing complete
- awaiting testing
- testing booked
-
10. Is the building inspector required - have they visited or been called.
-
Building inspector status
- Inspection compete
- Inspection booked
- Inspection not yet booked
-
11. Do we have any hired plant on site
-
Is the plant still required
- Plant in use
- Plant not in use but still needed
- plant can be off hired - tell the buyer
-
12. Do we have enough fuel for the items of plant on site.
-
13. Has the Forman arranged for the necessary materials to complete the project
-
14. Are we completing spoil away
-
spoil is being removed by
- Skip
- Grab Lorry
- Others
F: STORAGE & MOVEMENT OF MATERIAL
-
1. Are compress gases stored/secured correctly.
-
2. Are warning signs displayed.
-
3. Are the required fire extinguishers available.
-
4. Is hard standing available for pile reinforcement storage.
G: PPE - PERSONAL PROTECTIVE EQUIPMENT (Is correct PPE in use)
-
1, Are all operative wearing as a minimum hard hat , hi viz and safety boots?
-
2. Are there any site specific PPE requirement, are NFS operative being complaint
H: Piling Rig & Mat
-
1. Daily / Weekly Plant Inspection Checklist completed.
-
2. Accident book - any unrecorded items.
-
3. Foreman's Health & Safety Pack in order.
-
5. Is the piling mat level correct and agreed
-
6. Piling mat certificate completed & available.
-
7. Permit to dig signed/completed
-
9. Toolbox Talks completed.
J: RIG EQUIPMENT
-
1. Does the foreman have the following rig ancillary equipment :<br>Pins <br>Dip tape, Torch, wheel barrow, hammer, shovel, tying wire, steel cutters, line spray, boat level, bucket. <br><br><br><br>
-
2. Safety harness, lanyards, links and karabiners available & in order.
-
6. First Aid kit available and in order. does it include an eye wash station
-
7. Fire Extinguisher available and in order.
-
8. Spill Kit(s) available on site & full.
-
13. Diesel Tank/IBC Tested & Lifting Sling in-date (No Damage)
K: Job Pack
-
Does the Forman have the necessary contact numbers
-
1. Risk assessment - job specific.
-
2. Method Statement - job specific.
-
3.Does the Forman have copies of up-to-date and relevant drawings
L: PILING RIG AND EQUIPMENT MAINTENANCE
-
Any maintenance related issues.
-
The issue
- Can be fixed by foreman
- Requirees a Fitter
- Requires a rig exchange
-
Add media
-
Comments:
-
Any comments as a result of the audit by either the foreman or contracts manager
-
site visit photos
-
Foreman:
-
Auditor:
-
Select date