Information

  • Site Address

  • Conducted on

  • Contract + No.

  • Piling rig

  • Personnel/Site Operatives

  • Location
  • Prepared by

A: Welfare, Access and Site Set Up

  • 2. Are suitable rest areas provoded.

  • 3. Are food eating/heated areas provided.

  • 4. Is there facilities for drying/changing clothes.

  • 5. Is a safe means of access/egress provided.

  • 6. Is work area firm, level & suitable.

  • 7. Working areas free of obstruction.

  • 8. Is the required working area clear and available.

  • 9. Is the working area tidy (Housekeeping.

  • 10. Are all access and egress areas clear.

  • 4. Are all traffic routes signed.

  • 11. Are vehicles & pedestrians segregated.

Job specific Checks

  • 1. Any overhead cables in piling area.

  • 2. Have any service been identified and or marked

  • 3. Has the NFS permit to dig (PTD) been signed

  • 5. Are any other permits required

  • Additional permits include

  • 6. Have levels been agreed and identified on site.

  • 7. Are NFS completing the setting out

  • What is the setting out status

  • 8. Has the setting out be completed, checked and agreed.

  • 9. Is integrity testing required

  • testing status

  • 10. Is the building inspector required - have they visited or been called.

  • Building inspector status

  • 11. Do we have any hired plant on site

  • Is the plant still required

  • 12. Do we have enough fuel for the items of plant on site.

  • 13. Has the Forman arranged for the necessary materials to complete the project

  • 14. Are we completing spoil away

  • spoil is being removed by

F: STORAGE & MOVEMENT OF MATERIAL

  • 1. Are compress gases stored/secured correctly.

  • 2. Are warning signs displayed.

  • 3. Are the required fire extinguishers available.

  • 4. Is hard standing available for pile reinforcement storage.

G: PPE - PERSONAL PROTECTIVE EQUIPMENT (Is correct PPE in use)

  • 1, Are all operative wearing as a minimum hard hat , hi viz and safety boots?

  • 2. Are there any site specific PPE requirement, are NFS operative being complaint

H: Piling Rig & Mat

  • 1. Daily / Weekly Plant Inspection Checklist completed.

  • 2. Accident book - any unrecorded items.

  • 3. Foreman's Health & Safety Pack in order.

  • 5. Is the piling mat level correct and agreed

  • 6. Piling mat certificate completed & available.

  • 7. Permit to dig signed/completed

  • 9. Toolbox Talks completed.

J: RIG EQUIPMENT

  • 1. Does the foreman have the following rig ancillary equipment :<br>Pins <br>Dip tape, Torch, wheel barrow, hammer, shovel, tying wire, steel cutters, line spray, boat level, bucket. <br><br><br><br>

  • 2. Safety harness, lanyards, links and karabiners available & in order.

  • 6. First Aid kit available and in order. does it include an eye wash station

  • 7. Fire Extinguisher available and in order.

  • 8. Spill Kit(s) available on site & full.

  • 13. Diesel Tank/IBC Tested & Lifting Sling in-date (No Damage)

K: Job Pack

  • Does the Forman have the necessary contact numbers

  • 1. Risk assessment - job specific.

  • 2. Method Statement - job specific.

  • 3.Does the Forman have copies of up-to-date and relevant drawings

L: PILING RIG AND EQUIPMENT MAINTENANCE

  • Any maintenance related issues.

  • The issue

  • Add media

  • Comments:

  • Any comments as a result of the audit by either the foreman or contracts manager

  • site visit photos

  • Foreman:

  • Auditor:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.