Information
-
Site conducted
-
Site Address
-
Conducted on
-
Contract Number
-
Piling Rig
- B15000
- Drop Hammer
- Grundomat
- Klemm 708-02
- Klemm 708-3G
- SF55
- SR25
- SR30 Evo
- SR35
- T15000
- T5
- TD750
-
Personnel/Site Operatives
-
Prepared By
A) Welfare, Access and Site Set Up
-
1. Are suitable Welfare facilities provided?
-
2. Is water available on site?
-
3. Is there safe electric to use?
-
4. Is a safe means of access/egress provided?
-
5. Is the working area firm, level & suitable?
-
6. Are working areas free of obstruction?
-
7. Is the working area tidy (Housekeeping)?
-
8. Are vehicles & pedestrians segregated?
B) Job Specific Checks
-
1. Does the Foreman have copies of up-to-date and relevant drawings?
-
2. Has the Foreman arranged for the necessary materials to complete the project?
-
3. Is the piling area clear of any overhead cables/obstructions?
-
4. Has the NFS Permit To Dig (PTD) been signed?
-
4a. Are any other permits required?
- No additional Permits required
- Hot Works Permit
- Permit to Work
- Excvation Permit
- Permit to Dig
- Piling Platform Certificate
-
5. Is the piling mat level correct and agreed?
-
6. Have levels been agreed and identified on site? Do our Operatives know?
-
7. Does Steel need to be left at a certain height?
-
8. Do piles need to be built up?
-
9. What is the Setting Out status?
-
10. Is integrity testing required?
-
11. Building Inspector status
- Inspection not required
- Inspection complete
- Inspection booked
- Inspection required but not booked
-
12. Are we completing spoil away?
-
13. Have pallets been returned?
C) Storage and Movement of Materials
-
1. Are compress gases stored/secured correctly?
-
2. Drip Trays/Protection/Spill Kits?
-
3. Is hard standing available for pile reinforcement storage?
D) Health & Safety
-
1. Are all operative wearing as a minimum hard hat, hi viz and safety boots?
-
2. Are there any site specific PPE requirement? Are NFS operatives being compliant?
-
3. Accident book - any unrecorded items?
-
4. First aid kit available, and does it include an eye wash station?
-
5. Fire Extinguisher available and in working order?
-
6. Foreman's Health & Safety Pack in order?
E) Paperwork
-
1. Daily / Weekly Plant Inspection Checklist completed?
-
2. Piling mat certificate completed and available?
-
3. Toolbox Talks completed and signed?
-
4. Have Sub-Contractor tickets been checked?
-
5. Delivery Tickets returned to office?
-
6. Have the pile logs been signed and returned?
-
7. Have Method Statements been signed by NFS/Steel fixer?
-
8. Any new RAMS required?
F) Equipment
-
1. Does the foreman have all the necessary rig ancillary equipment : Pins, Dip tape, Torch, wheel barrow, hammer, shovel, tying wire, steel cutters, line spray, boat level, bucket.
-
2. Safety harness, lanyards, links and karabiners available and in order?
-
3. Do we have any hired plant on site?
- Plant in use
- No plant on site
- Plant not in use but still needed
- Plant can be off hired - notify Jacqui
-
4. Is plant clean and maintained?
-
5. Do we have enough fuel for the items of plant on site?
-
6. Is the plant in good working order?
-
7. Has any plant been damaged?
- N/A
- Plant damaged - office aware
- Plant damaged - office not aware
- No damage to plant
-
8. Any maintenance related issues?
G) Anything Else
-
Comments:
-
Any comments as a result of the audit by either the Foreman or Contracts Manager?
-
site visit photos
-
Auditor:
-
Select date