Title Page

  • Conducted on

  • Prepared by

  • Location
  • Flue termination

  • Flue holes filled (external and internal)

  • Flu in its entirety

  • Gas meter

  • Gas pipe (and re run)

  • Condense run and termination

  • Tightness test figures

  • Flue has analyser commissioning figures

  • Bench mark (in Mi’s)

  • Gas safety record

  • WPH sheet

  • S plan or y plan design (if heat only)

  • Feed/vent positioning (if heat only)

  • Is the customer satisfied with the install.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.