Work Preparation & Customer Care
-
Gas Safe card and ACS elements correct for work to be carried out.
-
Reference material / Technical bulletins available.
-
Visual / written risk assessment completed and recorded.
-
Hot work permit obtained.
-
Fire extinguisher available.
-
Customer Liaison
-
Customer care / work area preparation completed
Installation of gas pipework & valves
-
Existing gas installation inspected for suitability.
-
ECV correctly positioned labelled and operable
-
Point of entry Main equipotential bonding installed
-
Gas pipework correctly identified, Gas line diagram available were required
-
Gas pipework size support & route is correct
-
Gas pipework is constructed of approved materials.
-
Gas pipework sleeved & sleeves sealed
-
AECV / s correctly positioned labeled & operable
-
Ducts and voids ventilated correctly
-
Initial tightness test completed correctly
Appliance / Ancillary Plant / Systems Installation.
-
Appliance Installed to manufacturers instructions
-
Pressure relief pipework / termination correct
-
Condensate pipework / termination correct.
-
Flue / Ductwork installed correctly
-
Ventilation is suitable for requirements.
-
Ancillary Plant installed correctly.
-
Systems configured correctly.
-
Workmanship / visual appearance suitable
Electrical Tests
-
Electrical tests identified & completed correctly
-
Electrical isolation check completed correctly
-
Fuse rating checked and appropriate
Commissioning
-
Final tightness test completed correctly
-
Purging completed correctly
-
Commissioned to manufacturers instructions
-
Flue size construction route termination and support visually examined and correct
-
Flue flow continuity check completed correctly
-
Spillage / Case seal tests completed correctly
-
Ventilation size and route checked and correct
-
Operating pressure and / or gas rate checked
-
Safety devices operation checked
-
Combustion analysis completed
-
All disturbed joints tested
-
Appliance / associated controls operating correctly
Safe Working Practices
-
Safe working practices employed
-
Electrical equipment safety and calibration checks carried out.
Completion
-
Customer instructed in use and instructions left / controls reset
-
Documentation completed correctly
-
Underpinning Knowledge
Question
-
Question
-
Response
Signatures
-