Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Property Type

  • Detached House

  • Semi detached house

  • End of terrace

  • Ground floor flat

  • 1st floor Flat

  • 2nd floor flat

  • 3rd floor flat

  • Bungalow

  • Mobile home

  • Other - SPECIFY BELOW

Existing Heating System Type

  • Combi / Sealed

  • System boiler / Sealed

  • Heat Only Boiler / Open Vented

  • Heat Only Boiler / Sealed

  • Other - SPECIFY BELOW

Existing Hot Water System Type

  • Mains pressure / Combi

  • Mains pressure / unvented cylinder

  • Gravity / cylinder

  • Is the existing hot water system fully pumped?

  • Are there any power showers which may be effected by the pressurisation of the hot water?<br>If YES specify below

Existing Boiler Details

  • MAKE / MODEL / OUPUT information required below

  • Picture of existing Boiler required

Existing Flue Details

  • Balanced / Fan flue / Horizontal

  • Balanced / Fan flue / Verticle

  • Balanced / Natural Draught / Horizontal

  • Balanced / Natural Draught / Vertical

  • Open Flue / Vertical

  • Open Flue / Horizontal

  • Other - SPECIFY BELOW

  • Picture of Flue terminal required

Existing Boiler Electrical Connections

  • Permanent live supply ?

  • Switch live supply?

  • Pump over run supply?

Existing Gas Supply To Boiler

  • 15mm

  • 22mm

  • 28mm

Existing Controls

  • Integral programmer and room stat

  • External programmer and room stat

  • Programmer only

  • Programmable room stat

  • Are the existing controls in a good and usable condition?

  • Picture of heating controls

  • Does the system have TRV's

  • Do the existing controls platform comply with Part L budding regulations?

New Boiler Details

  • Specify proposed new Boiler Details below E.G TYPE / OUPUT

New Boiler Location

  • Specify the new Boiler location taking into account minimum clearance and cupboards or other site restrictions in close proximity

  • Will the Boiler be located in a cupboard?

  • If YES Specify cupboard dimensions below (Height x Width x Depth)

New Boiler Electrical Requirements

  • Does the proposed new Boiler require a permanent live supply?

  • Does the proposed new Boiler require a permanent pump over run supply?

  • Will a suitably qualified electrician required to carry out Electrical amendments to the system?<br>If YES give details on scope of work required below

New Boiler Flue Details

  • Vertical termination

  • Horizontal termination

  • Number of extensions required?

  • Number of 90 degree elbows required?

  • Number of 45 degree bends required?

  • Number of Flue support brackets required?

  • Is a lead slate required?

Proposed New Controls Package

  • What new controls are required?

  • How many TRV's are required?

  • Size of required TRV

New gas supply requirements

  • Is the existing gas supply acceptable? <br>If NO give details of upgrade below

  • Is a new 28mm gas meter union required?

Condense pipe and termination point

  • Is there an existing condense pipe?<br>If NO give details of proposed termination point

  • Is a soak away required?

  • Is a condense pump required?

New Hot Water Cylinder

  • Is a replacement hot water cylinder required?

  • What type of hot water cylinder is required?

  • Will the new hot water cylinder be installed to the existing location?<br>If NO give proposed location details below

  • Picture of hot water cylinder being replaced

  • New hot water cylinder size?

  • Is the cylinder direct or indirect?

  • How many immersions does the new cylinder require?

Replacement Radiators

  • How many replacement radiators including towel rails are required?

  • Details of all replacement radiators required below (SIZE / TYPE / ROOM / POSITION IN ROOM)
    E.G 600 x 1000 K2 / Master Bed / Existing Location under window

  • How many new TRV's are required?

  • How many Lock-shields with drain off point are required?

  • How many standard lock-shields are required?

  • What size TRV's and lock shields are required?

Making Good

  • Will there be any making good of the external wall?<br>If YES give details below

  • Picture of external brick/wall face required

Core Material List

  • In this section you are required to add a 'core material list' including quantity of tube, condense pipe, pumps and valves

  • How many metres of 15mm tube is required?

  • How many metres of 22mm tube is required?

  • How many metres of 28mm tube is required?

  • How many metres of overflow pipe is required?

  • How many metres of 32mm plastic pipe is required?

  • How many metres of 40mm plastic pipe is required?

  • How many metres of 15mm tube is required?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.