Information
-
Document number
-
Facade Type
-
Level
-
Elevation
-
Conducted on
-
Prepared by(Lider)
Check List
CONTROL/CHECK
-
Ensure gasket is installed before panel/glass installation
-
Is the gasket free of damage
-
Is gasket free of foreign substances and materials? i.e. oils, metal filings
-
Is the gasket installed correctly and checked as per drawings?
-
Ensure aluminium joining plates are installed correctly / Mastic between aluminium plate and gasket.
-
Is the gasket notched with the right tools and as per drawings?
-
Is the gasket continually sealed
-
Has the area been cleaned and waste including COSHH materials removed to allocated bins?
Comments
-
Add media
Inspected by
-
Lider
-
Witnessed by
-
Mace