Information

  • Document number

  • Facade Type

  • Level

  • Elevation

  • Conducted on

  • Prepared by(Lider)

Check List

CONTROL/CHECK

  • Ensure gasket is installed before panel/glass installation

  • Is the gasket free of damage

  • Is gasket free of foreign substances and materials? i.e. oils, metal filings

  • Is the gasket installed correctly and checked as per drawings?

  • Ensure aluminium joining plates are installed correctly / Mastic between aluminium plate and gasket.

  • Is the gasket notched with the right tools and as per drawings?

  • Is the gasket continually sealed

  • Has the area been cleaned and waste including COSHH materials removed to allocated bins?

Comments

  • Add media

Inspected by

  • Lider

  • Witnessed by

  • Mace

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.