Title Page
-
Customer Name:
-
Gasmatic Serial Number:
-
Date:
-
Model:
-
1. Gasmatic is clean and tidy (ALL old stickers removed)
-
2. Check vacuum disc
-
3. Correct schematic attached
-
4. Correct HAZCHEM attached
-
5. Correct valve labels attached
-
6. Correct delivery and service phone number stickers attached
-
7. Correct delivery and service stickers attached
-
8. Safety valves in test and tagged (with no less than 12 months left)
-
9. Check function setting and Surefill regulator
-
Setting:
-
10. Check function and setting of pressure raise regulator
-
Setting:
-
11. Ensure there is no corrosion on vessel body
-
12. Ensure there is no corrosion on any valves or pipework
-
13. Check function and setting of customer supply regulator
-
14. Check liquid valve function
-
15. Check vent valve function
-
16. Check pressure raise isolation valve function
-
17. Check fillbox for leaks (if attached)
-
18. Remote fillbox box supplied - tested
-
19. Equipment installation request attached
-
20. No charge docket attached
-
21. Ensure ALL SV are 1/4" and piped away
-
22. Purge with service gas - check boil off rate over 24 hrs (weigh tank before and after)
PRIMARY SV#1
-
Model # (existing SV)
-
Test date (existing SV)
-
Model # (new SV)
-
Test Date (new SV)
SECONDARY SV#1
-
Model # (existing SV)
-
Test date (existing SV)
-
Model # (new SV)
-
Test Date (new SV)
BOIL OFF
-
Boil off - before weight
-
Date and time
-
Boil off - after weight
-
Date and time
Gas test
-
Contents pressure 2000 kPa
-
1400 kPa with Nitrogen
-
Test for leaks
Sign off
-
Refurb completed by:
-
Signature
-
Date