Information

  • Vessel serial number

  • Customer

  • Conducted on

  • Prepared by

  • Vessel Size

  • Traffic

  • Vessel ZZ number

  • What are the details of the Vapouriser Installation? (Model number)

  • Does the vessel compound meet the requirements of AS1894-1997 including separation distances?

  • Is there adequate access for the tanker delivery?

  • Does the installation follow either of the standard drawings:

  • Have the Vessel and Vapouriser been bolted down?

  • Has the correct orifice plate been installed for the correct gas and flow requirements?

  • Have the following signs/placards been erected?

  • Has all commissioning and handover documentation been completed?

  • Has the customer handover procedure been followed and recorded?

  • Has fixed installation pricing been used as detailed in SRM?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.