Title Page
-
Client Name
-
PIA NOI Number
-
Siebel Reference Number
-
GES Reference Number
-
Build Area (i.e., Colne, Ilkley)
-
PN & Asset Affected (i.e PN06 ASN12)
-
Location
-
Completed By
-
Contact Number
-
Date/Time Recorded
Repair Details
-
Do you have to dig in Public Highway or Private Location
-
Permit Number
-
Site set up and SLG
-
Is blockage Duct or Pole Bend
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot at base of pole (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing pole bend duct.
-
Photo of open excavation with damage and associated open link chamber and context of surrounding area
-
Photo of repaired pole bend duct close up. NOTE: 1) ALL existing pole cables must be inside the repair, 2) cable ties/straps must be secured every 10cm, 3) If a duct 54 pole bend (2") meets duct 56 (4") before a chamber, a split reducing collar MUST be used.
-
Photo of repaired pole bend and context of surrounding area
-
Photo of reinstatement close up.
-
Photo of reinstatement and context of surrounding area. NOTE: MUST include Connector Bend in photo (Elephants foot) If damaged or lost you MUST REPLACE it.
-
Works completed and site clear photo of street
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing duct.
-
Photo of excavation showing damaged/missing duct and context of the surrounding area.
-
Photo of duct repaired close up. NOTE: The photo must show visible split collars on BOTH SIDES of the repair and cable ties/straps tied every 10cm.
-
Photo of duct repaired and context of surrounding area.
-
Photo of completed reinstatement close up.
-
Photo of completed reinstatement and context of surrounding area.
-
Works completed and site clear photo of street
-
Are there anymore blockages to repair?
-
Do you have to dig in Public Highway or Private Location
-
Permit Number
-
Site set up and SLG
-
Is blockage Duct or Pole Bend
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot at base of pole (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing pole bend duct.
-
Photo of open excavation with damage and associated open link chamber and context of surrounding area
-
Photo of repaired pole bend duct close up. NOTE: 1) ALL existing pole cables must be inside the repair, 2) cable ties/straps must be secured every 10cm, 3) If a duct 54 pole bend (2") meets duct 56 (4") before a chamber, a split reducing collar MUST be used.
-
Photo of repaired pole bend and context of surrounding area
-
Photo of reinstatement close up.
-
Photo of reinstatement and context of surrounding area. NOTE: MUST include Connector Bend in photo (Elephants foot) If damaged or lost you MUST REPLACE it.
-
Works completed and site clear photo of street
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing duct.
-
Photo of excavation showing damaged/missing duct and context of the surrounding area.
-
Photo of duct repaired close up. NOTE: The photo must show visible split collars on BOTH SIDES of the repair and cable ties/straps tied every 10cm.
-
Photo of duct repaired and context of surrounding area.
-
Photo of completed reinstatement close up.
-
Photo of completed reinstatement and context of surrounding area.
-
Works completed and site clear photo of street
-
Are there anymore blockages to repair
-
Do you have to dig in Public Highway or Private Location
-
Permit Number
-
Site set up and SLG
-
Is blockage Duct or Pole Bend
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot at base of pole (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing pole bend duct.
-
Photo of open excavation with damage and associated open link chamber and context of surrounding area
-
Photo of repaired pole bend duct close up. NOTE: 1) ALL existing pole cables must be inside the repair, 2) cable ties/straps must be secured every 10cm, 3) If a duct 54 pole bend (2") meets duct 56 (4") before a chamber, a split reducing collar MUST be used.
-
Photo of repaired pole bend and context of surrounding area
-
Photo of reinstatement close up.
-
Photo of reinstatement and context of surrounding area. NOTE: MUST include Connector Bend in photo (Elephants foot) If damaged or lost you MUST REPLACE it.
-
Works completed and site clear photo of street
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing duct.
-
Photo of excavation showing damaged/missing duct and context of the surrounding area.
-
Photo of duct repaired close up. NOTE: The photo must show visible split collars on BOTH SIDES of the repair and cable ties/straps tied every 10cm.
-
Photo of duct repaired and context of surrounding area.
-
Photo of completed reinstatement close up.
-
Photo of completed reinstatement and context of surrounding area.
-
Works completed and site clear photo of street
-
Are there anymore blockages to repair
-
Do you have to dig in Public Highway or Private Location
-
Permit Number
-
Site set up and SLG
-
Is blockage Duct or Pole Bend
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot at base of pole (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing pole bend duct.
-
Photo of open excavation with damage and associated open link chamber and context of surrounding area
-
Photo of repaired pole bend duct close up. NOTE: 1) ALL existing pole cables must be inside the repair, 2) cable ties/straps must be secured every 10cm, 3) If a duct 54 pole bend (2") meets duct 56 (4") before a chamber, a split reducing collar MUST be used.
-
Photo of repaired pole bend and context of surrounding area
-
Photo of reinstatement close up.
-
Photo of reinstatement and context of surrounding area. NOTE: MUST include Connector Bend in photo (Elephants foot) If damaged or lost you MUST REPLACE it.
-
Works completed and site clear photo of street
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing duct.
-
Photo of excavation showing damaged/missing duct and context of the surrounding area.
-
Photo of duct repaired close up. NOTE: The photo must show visible split collars on BOTH SIDES of the repair and cable ties/straps tied every 10cm.
-
Photo of duct repaired and context of surrounding area.
-
Photo of completed reinstatement close up.
-
Photo of completed reinstatement and context of surrounding area.
-
Works completed and site clear photo of street
-
Are there anymore blockages to repair
-
Do you have to dig in Public Highway or Private Location
-
Permit Number
-
Site set up and SLG
-
Is blockage Duct or Pole Bend
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot at base of pole (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing pole bend duct.
-
Photo of open excavation with damage and associated open link chamber and context of surrounding area
-
Photo of repaired pole bend duct close up. NOTE: 1) ALL existing pole cables must be inside the repair, 2) cable ties/straps must be secured every 10cm, 3) If a duct 54 pole bend (2") meets duct 56 (4") before a chamber, a split reducing collar MUST be used.
-
Photo of repaired pole bend and context of surrounding area
-
Photo of reinstatement close up.
-
Photo of reinstatement and context of surrounding area. NOTE: MUST include Connector Bend in photo (Elephants foot) If damaged or lost you MUST REPLACE it.
-
Works completed and site clear photo of street
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing duct.
-
Photo of excavation showing damaged/missing duct and context of the surrounding area.
-
Photo of duct repaired close up. NOTE: The photo must show visible split collars on BOTH SIDES of the repair and cable ties/straps tied every 10cm.
-
Photo of duct repaired and context of surrounding area.
-
Photo of completed reinstatement close up.
-
Photo of completed reinstatement and context of surrounding area.
-
Works completed and site clear photo of street
-
Are there anymore blockages to repair
-
Do you have to dig in Public Highway or Private Location
-
Permit Number
-
Site set up and SLG
-
Is blockage Duct or Pole Bend
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot at base of pole (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing pole bend duct.
-
Photo of open excavation with damage and associated open link chamber and context of surrounding area
-
Photo of repaired pole bend duct close up. NOTE: 1) ALL existing pole cables must be inside the repair, 2) cable ties/straps must be secured every 10cm, 3) If a duct 54 pole bend (2") meets duct 56 (4") before a chamber, a split reducing collar MUST be used.
-
Photo of repaired pole bend and context of surrounding area
-
Photo of reinstatement close up.
-
Photo of reinstatement and context of surrounding area. NOTE: MUST include Connector Bend in photo (Elephants foot) If damaged or lost you MUST REPLACE it.
-
Works completed and site clear photo of street
-
Blockage Eastings
-
Blockage Northings
-
Take photo of the Pre-dig blockage area where 'X' marks the spot (from A55) and context of the surrounding area.
-
Photo of open excavation showing extent of damaged/missing duct.
-
Photo of excavation showing damaged/missing duct and context of the surrounding area.
-
Photo of duct repaired close up. NOTE: The photo must show visible split collars on BOTH SIDES of the repair and cable ties/straps tied every 10cm.
-
Photo of duct repaired and context of surrounding area.
-
Photo of completed reinstatement close up.
-
Photo of completed reinstatement and context of surrounding area.
-
Works completed and site clear photo of street
-
Are there anymore blockages to repair