Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Administrative
-
OSHA 300 log posted and up to date?
-
MSDS sheets up to date and available to employees?
-
OSHA and DOL posters up to date and posted?
-
Emergency phone numbers, evacuation plan and muster points posted?
-
SWPPP inspections up to date?
-
Tool box safety talks log up to date?
-
First aid kits available in the office?
-
First responders available?
-
Site safety signage is in place (speed, stop, slow, muster points, visitor sign in, safety rules, etc)?
STA Completion
-
Pre-task planning forms in use and properly filled out (STA, JHA, etc)
-
Hazards properly identified on STA?
-
Tasks being performed are on the STA?
-
Emergency notification section filled out completely on STA?<br> -phone number<br> -nearest plant phone<br> -emergency contact <br> -eye wash station/ first-aid location
-
Supervisor's briefing crews on task for that day?
-
Crew members signing in on STA?
-
Crew members signing out on STA?
Site Condition
-
Ground around work areas?
-
Wet
-
Muddy
-
Slick
-
Standing water
-
Dry
-
Dusty
-
Trash containers available, in proper location and not overflowing?
-
Spill containers available and in proper location?
-
Proper amount of sanitary facilities available and well maintained/cleaned?
-
Hand wash stations available and well maintained/cleaned?
-
Drinking water available and properly maintained?
-
Eye wash stations available and ready for use?
-
Eye wash stations unobstructed?
-
Cords, leads, hose, rope etc picked up so they do not pose a tripping hazard?
-
Walkways clear of debris and excess material?
-
Barricades installed and properly maintained?
-
Wooden barricades
-
Orange snow fence
-
Red danger tape
-
Yellow caution tape
-
Wire rope
-
Nails removed or bent over?
-
Rebar caps installed to prevent impalement?
-
Proper storage of flammable material?
-
Fuel and other liquids properly stored in berm, diked, or double wall containers?
-
Fuel storage area properly barricaded?
-
Smoking areas posted and adhered to?
-
Fire extinguishers available, full, inspected and in proper locations?
-
Combustibles removed from hot work areas?
-
Sufficient lighting to perform task?
-
All tools, ladders, cords, leads etc are the proper quarterly color code?
-
White
-
Green
-
Red
-
Orange
PPE
-
Hard hats worn properly and in good repair?
-
Proper safety glass worn for proper lighting?<br> -indoors clear/smoke<br> -outdoors dark/clear/smoke
-
Goggles or face shields used when required?
-
Employees wearing proper attire?
-
Respiratory protection used properly when needed?
-
Hearing protection used where required?
-
High visibility vest worn when required?
-
Fire retardant clothing worn where required?
-
Steel toed boots or foot protection used?
-
Gloves being worn when handling material or tools?
Fall Protection
-
Fall arrest equipment inspected prior to each use?
-
Harness
-
Lanyards
-
SRL
-
Fall arrest equipment used properly?
-
Maintaining 100% tie off?
-
Tools secured from falling?
-
Unused fall protection properly stored when not in use?
-
Employees below protected from falling objects?
-
Holes are covered and labeled?
-
Excess material, trip hazards, removed from work area?
-
Step ladders opened and not used as straight ladders?
-
Extension ladders extend 3 ft beyond landing?
-
Extension ladders secured from displacement? Tied off?
-
Ladders used properly?
-
Ladders and fall protection quarterly inspections current?
-
White
-
Green
-
Red
-
Orange
Equipment Usage
-
Employees operating equipment have proper training for specific equipment?
-
Pre-use inspection forms being used on all equipment?
-
Aerial lifts used properly, employees are tied off with both feet in basket?
-
Scissor lifts used properly, employees are tied off with both feet in basket?
-
Warning devices in place on vehicles (back up alarms, strobes, signage etc)?
-
Seat belts worn at all times?
-
Operators checking surroundings at all times?
-
Operators using spotters when backing or in tight spots?
Tools
-
Proper tools used for the job?
-
Proper use of tools by employees ?
-
Tools in good repair?
-
GFCI's used on all 110V power tools?
-
Guards properly used and functional?
-
Handles and guards are installed on all tools?
-
Cords in acceptable condition for use and have ground?
-
Unused tools returned to gang box?
Welding
-
Hot work permits filled out properly and used?
-
Fire watch utilized?
-
Fire extinguisher within 25' of any hot work and accessible?
-
Compressed gasses properly secured and separated when stored?
-
Proper separating distances between fuels and oxygen?
-
Welding shields and fire blankets used?
-
Ventilation adequate during welding?
-
Sparks, slag and flames controlled?
-
Leads and hoses protected and not causing a hazard?
Scaffolding
-
Scaffolding properly labeled?
-
Green
-
Yellow
-
Red
-
Scaffold inspections up to date?
-
Scaffold properly anchored?
-
Access ladders appropriate and affixed?
-
Railings, mid rails and toe-boards in place?
-
Workers are working from platform to complete work? No standing on mid rails/ top rails.
-
Working surfaces fully planked?
-
Working surfaces clean of debris?
-
Employees below protected from falling objects?
Cranes and Rigging
-
Crane annual inspection up to date?
-
Certified crane operators operating cranes?
-
Daily crane inspection and pre-operational checks complete?
-
Lift plan in place and approved for all lifts?
-
Rigging inspected prior to each use?
-
Rigging in good repair?
-
Safety latches in place?
-
Softeners being used?
-
Rigging has proper quarterly inspections complete and proper color code?
-
White
-
Green
-
Red
-
Orange
-
Lift area barricaded or spotter in place during all lifts?
-
One person directing operator at all times?
-
Riggers keeping employees clear of overhead loads?
-
Operators and riggers using horns/whistles during lifts?
-
Tag lines being used on all loads?
-
Riggers maintaining eye contact with crane operator?
Pressure Testing
-
Test perimeter sufficiently barricaded and controlled?
-
LOTO in place as required?
-
Safety in place to ensure system is not over pressurized?
-
Testing plan in place and approved?
-
System and equipment tested in accordance with plan?
-
Energy within system properly controlled?
-
Pressurizing equipment shut down during breaks unless testing personnel is not breaking?
Energy Control (LOTO)
-
Personnel working on equipment requiring LOTO are properly trained?
-
LOTO form completed?
-
LOTO equipment in good repair, organized and available?
-
Locks installed properly and all locks tagged?
-
Energy within system properly controlled?
-
Employees removed locks upon end of shift?
-
LOTO logging system and records in place and organized?
Excavations
-
Dig permits used properly prior to excavations?
-
DigSafe or OneCall complete prior to excavations? Note: not all utilities can be located<br>In this manner. Private utilities located using drawings or proper locating service.
-
Holes deeper then 4' are benched or sloped in accordance with dig permit?
-
All holes, trenches and pits properly barricaded?
-
Access/Egress within 25' of each employee. Minimum 2 exits from excavation.
-
Spoil piles more then a minimum of 2' from excavation?
-
Employees working in trench can see operator at all times?
Confined Space
-
Employees working in confined space are trained?
-
Hole watch and standby entry person are confined space trained?
-
Confined space paperwork is complete, work is authorized and paperwork is present at the work location?
-
Emergency equipment in place for standby person?
-
Confined space are identified and signs posted?
-
Attendant is trained in gas monitor operation?
-
Gas monitor is calibrated and certified?
-
Entry person wearing harnesses?
-
Safety Manager
-
Superintendent
-
Project Manager