Title Page
-
Client / Site
-
Conducted on (Date and Time)
-
Inspected by
-
Location
GENERAL INFORMATION
-
Nature of work
-
Take a photo of the workspace.
-
Use these score criteria for your inspection:
3 - There is an ability to maintain it.
2 - This is being complied with more systematically.
1 - It is done but not systematically.
0 - Not at all.
N/A - Not Applicable
SORT OUT - SEIRI
-
Is the floor area free of unwanted items?
-
REFERENCE: The floor area is free from unwanted items.
[This is an example of how you can use iAuditor to include best practice reference images in your templates to assist with inspections] -
Are tops and insides of all cupboards, shelves, tables, etc. free of unwanted items?
-
Are items stored according to frequency of use?
-
Are walls free of old posters, calendars, pictures , notices etc.?
-
Is there a general clutter free appearance?
-
Capture photo(s) of red tagged items.
SET IN ORDER - SEITON
-
Are direction indications available to all facilities from the entrance onwards?
-
Do all items of equipment have identification labels?
-
Are all rooms, cubicles and similar areas clearly numbered or named?
-
Are specific areas demarcated for garbage/rejects/waste, etc.?
-
Are switches, fan regulators, controls, etc. labeled?
-
Are all cables, wires, pipes etc. neat and straight?
-
Is colour coding used effectively for easy identification?
-
Is there a general appearance of orderliness?
-
Is it easy to find any item/document without delay?
-
Identify and allocate a place for all the materials needed for your work.
SHINE - SEISO
-
Are cleaning schedules available and displayed?
-
Are floors, walls, windows doors etc. maintained at a high level of cleanliness?
-
Is use of adequate cleaning tools evident?
-
Are machines, equipment, tools, furniture maintained at a high level of cleanliness and their maintenance schedules displayed?
-
Is there a general appearance of cleanliness all round?
STANDARDIZE - SEIKETSU
-
Is a daily checklist used to standardize 5s procedures?
-
Are standard check lists used to regularly inspect 5S?
-
Are labels, notices etc. standardized?
-
Do isles/pathways have a standard size and colour?
-
Are pipes, cables etc. color coded?
SUSTAIN - SHITSUKE
-
Is there a system for how and when the 5S activities will be implemented?
-
Does management provide support to 5S programme by recognition, resources and leadership?
-
Have first 3S become a part of the daily work?
-
Do employees show positive interest in 5S activities?
-
Are 5S posters and 5S points of work reminders displayed?
-
Are trainings and other programs implemented to sustain workplace organization?
COMPLETION
-
Recommendation
-
Overall Rating
-
Full Name and Signature of the Inspector