1.0 - Previous inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there no outstanding actions?
2.0 - Fire Prevention
-
2.01 - Are Break glass points sufficiently signed.
-
2.02 - Appropriate Fire Evacuation Plans displayed?
-
2.03 - Evacuation procedures discussed regularly? (3 to 4 times a year)
-
2.04 - Extinguishers in place and clearly marked for type of fire?
-
2.05 - Extinguishers kept clear of obstructions?
-
2.06 - Exit routes clear of obstructions?
-
2.07 - Adequate direction notices for fire exits?
-
2.08 - Exit doors easily opened from inside?
-
2.09 - Fire Doors close adequately
-
2.10 - Intumescent strips in good repair and fit for purpose?
-
2.11 - Fire alarm regularly tested, and tests logged in log book?
-
2.12 - Extinguishers recently serviced? (State last test date)
3.0 - General Lighting
-
3.01 - Good natural lighting?
-
3.02 - Sunlight causing glare or reflections?
-
Blinds in place and fit for purpose?
-
3.03 - Artificial Lighting sufficient and in good condition? (list any defects)
-
3.04 - Emergency exit lighting operable? (State last test/inspection)
4.0 - Safe working environment
-
4.01 - Floor surfaces even and uncluttered?
-
4.02 - Entry and walkways kept clear?
-
4.03 - Walkways adequately and clearly marked?
-
4.04 - Stair and risers in good condition and kept clear?
-
4.05 - Are liquid spills removed quickly?
-
4.06 - Are handrails, and banisters in good condition and fit for purpose?
-
4.07 - Are fall preventive measures in place where required and fall arrest systems tested annually?
-
4.08 - Are external footpaths in good condition?
-
4.09 - Is there adequate ventilation throughout the work environment?
-
4.10- Is there adequate heating throughout the work environment?
5.0 - Stores / Postroom
-
5.08 - Is Materials Handling equipment supplied?
-
5.10 - If applicable are pre use checks undertaken?
-
5.11 - if applicable - are staff adequately trained in the use of pallet trucks / stackers etc
-
5.09 - Is Materials handling equipment fit for purpose and regularly tested?
-
5.01 - Is stock stored appropriately on racks?
-
5.02 - Are racks secured appropriately?
-
5.03 - Are exit routes and walkways kept clear of obstructions?
-
5.04 - Are good housekeeping rules applied and combustibles kept to a minimum?
-
5.05 - Is P.P.E worn in this area?
-
5.06 - If P.P.E is supplied, is it stored appropriately and fit for purpose?
-
5.07 - Are staff aware of report/replace procedure?
6.0 - Kitchens and Cleaners cupboards
-
6.04 - Are Chemicals subject to C.O.S.H.H regulations?
-
6.05 - Hazardous Substance Register complete and available?
-
6.06 - Material Safety Data Sheets available for all chemicals?
-
6.07 - Risk assessments completed for hazardous substances?
-
6.08 - All containers labelled correctly?
-
6.09 - Unused substances disposed of?
-
6.10 - Do special storage conditions apply?
-
6.11 - If applicable are special storage conditions followed?
-
6.12 - Workers trained in the use of hazardous substances?
-
6.13 - If required is PPE available?
-
6.14 - Is adequate ventilation provided?
-
6.15 - Are eye washes stations readily available?
-
6.01 - Are contractors own Health and Safety procedures in place?
-
6.02 - Are good housekeeping rules observed?
-
6.03 - Are materials stored appropriately?
7.0 - Distribution Cupboards / Plant Rooms
-
7.01 - Are distribution cupboards and plant rooms kept clear of combustible materials?
-
7.02 - Are Distribution Cupboards and plant rooms kept locked to prevent unauthorised access?
-
7.03 - Plant Rooms - Are emergency procedures clearly displayed in plant rooms? (Fire / First aid)
-
7.04 - Plant Rooms - Are eye wash stations available and adequately stocked?
8.0 - Electrical Safety
-
8.01 - Is there any evidence of daisy chains (adapters plugged into adapters) ?
-
8.02 - Portable appliances tagged and tested? (PAT)
-
Date of last P.A.T Test
-
8.03 - Any evidence of broken, scorched plugs, sockets or switches?
-
8.04 - Any evidence of frayed, scorched or damaged leads?
-
8.05 - Any evidence of strained leads?
-
8.06 - P.I.R Testing schedule up to date?
-
Date of last inspection
-
8.07 - Where required are emergency shut-down procedures in place?
8.0 - Work stations
-
8.01 - Generally are workstations in good condition and fit for purpose?
-
8.02 - Generally are workstations kept clear of rubbish? (in particular Hotdesks)
-
8.03 - Is leg room unobstructed and work areas free from slips trips and falls?
-
8.04 - Are monitors and/or keyboards free from glare and reflection (i.e solar glare, or glare from overhead lighting)?
-
8.05 - Work height correct for the type of work and the employee?
-
8.06 - Are desk free from sharp edges?
-
8.07 - Are chairs generally in good condition and fit for purpose?
9.0 - Rubbish Removal
-
9.01 - Are bins located at suitable points around site?
-
9.02 - Are bins emptied regularly?
-
9.03 - Is combustible refuse in covered metal containers?
10.0 Ladders
-
10.01 - Are ladders on a regular inspection schedule?
-
Date of last
-
10.02 - Are ladders stored appropriately?
-
10.03 - If used for electrical work are they non conductive? (Wood or fibre glass.)
11.0 - First Aid Facilities
-
11.01 - Are First Aid cabinets and contents clean and orderly?
-
11.02 - Are contents regularly checked for appropriate stock level and expiry dates?
-
11.03 - Cabinets clearly labelled?
-
11.04 - Is there easy access to cabinets?
-
11.05 - Employees aware of location of first aid cabinet/room?
-
11.06 - Are there an adequate number of trained first aiders?
-
11.07 - Are staff aware of trained first aiders and emergency numbers displayed?
-
Any other issues?
Room checklist
-
Ground Floor - Reception
-
Ground Floor - Electric Cupboard
-
Ground Floor - Directors offices
-
Ground Floor - Accounts print room
-
Ground Floor - Finance / Membership
-
Ground Floor - Central Atrium & Education
-
First Floor - Toilets
-
Ground Floor - Barton Room
-
Ground Floor - Dining Room
-
Ground Floor - First Aid Room
-
Ground Floor - ICT
-
Ground Floor - Electric Cupboard
-
Ground Floor - Vending Room
-
Ground Floor - Restaurant
-
Ground Floor - Kitchens
-
Ground Floor - Covered Walkway
-
Ground Floor - Extension North
-
Ground Floor - Extension South
-
Ground Floor - Grounds
-
Ground Floor - Toilets
-
First floor - North Wing (Publishing)
-
First Floor - Extension (Publishing / SIG)
-
First Floor - South Wing (Sales/Marketing/Design etc.)
-
First Floor - North Plant room / Roof Voids
-
First Floor - South Plant Room / Roof Voids
-
First Floor - HR
-
First floor - Copier Rooms
-
Ground Floor - Postroom
-
Ground Floor - Stores
-
Ground Floor - Cleaners cupboard
-
Ground Floor - Training Room
-
Ground Floor - G6
-
Ground Floor - G8
-
Ground Floor - Locker Rooms
Sign Off
-