Information
-
Document No.
-
Maintenance 1
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
What would the impact of a spill on the environment should it not be cleaned up effectively?<br>(Ask employee, eg, adverse publicity, contamination of the wet lands or fines)
-
Comment
-
Are spill response kits located in the Maintenance area and are personnel aware of the location?
-
Comment
EP304-100 - Aspect No A3 / Yum Compliance 5.1
-
Have Maintenance employees completed LMS training on Environmental Awareness in the last 12 months.<br>(Review LMS training records).
-
Comment
304-100 - Aspect No A3 & E1 / Yum Compliance 3.4.
-
Are Maintenance personnel aware of the Storm Water Shut off Valve and it's function?<br>(Ask employee location of storm water shut off valve)
-
Comment
-
Is the spill response kit located in or near the Maintenance workshop adequately stocked?
-
Comment
WHS Regulations 2012 - Regulation 344
-
Are SDS's for chemicals in the Maintenance area readily available at point of use?
-
Comment
-
Are SDS's up to date (5 Years) as required by legislation?<br>(Do a random check of SDS's)
-
Comment
-
Report the housekeeping standard to the Maintenance Manager.
Sign Off
-
AREAS OF CONCERN:
-
POSITIVE OBSERVATIONS:
-
SUMMARY OF AUDIT:
This audit was part of the 2014 Internal Audit Timetable, scheduled for the Gepps Cross EMS. The aim of this audit was to establish compliance with EPA licences, internal environmental procedures and supplier compliance regarding environmental impacts, training and WHS regulations.
This audit was conducted on the Maintenance area by interviewing the Maintenance Employees regarding the impacts of spills on the environment, location of spill kits, environmental training and the location and function of the storm water shut off valve. -
CORRECTIVE ACTIONS:
-
SIGNATURE OF AUDITOR 1
-
SIGNATURE OF AUDITOR 2
-
SENIOR MANAGEMENT REVIEW:
- Simon Warnock
- Paul Covington
- Jamie Beaton
-
Add signature