Information
-
Audit Title
-
Conducted on
-
Prepared by
-
Personnel
-
Date / Time of Observation
-
Contractor Observed
- TFSE
- TFSM
- Gross
- Jersen
- AAA Reinforcing
- Tetra Tech
- Postler & Jaeckle
- Gomez Electric
- Rosetti
- CME
- Ovivo
- Selby & Smith
- Burt Crane
-
Specific Location
- 8.1 SubFab
- 8.1 Fab
- 8.1 Fan Deck
- TDC
- CUB L1
- CUB L2
- Parking Lot
- Other
-
Insert Column Location or other Comments Here for Clarification
-
Observer(s)
- Scott Cashin
- Tracy Newman
- Ed Lashua
- Ceasar Gonzalez
- Mervyn Wilson
- Vince Jamnik
- Mike Morgan
- Roger Glover
- John Axten
Any Marked "At Risk" Must Include Details and a photo.
-
Face / Eye PPE
-
Foot PPE
-
Hand / Arm PPE
-
Head PPE
-
Hearing PPE
-
Respiratory PPE
-
Fall Protection
-
Mobile Lifts
-
Electrical / GFCI
-
Lockout / Tagout
-
Work Permits
-
Excavations
-
Hot Work
-
Storage Area
-
Body Position
-
Ladders
-
Scaffolds
-
Access / Egress
-
Aerial Lifts
-
Barricades / Signage
-
Slips / Trips / Falls
-
Lifting / Rigging
-
Confined Space
-
Equipment / Tools
-
Housekeeping
-
Lighting
-
Chemical
-
Material Handling
-
Other
PTP Audit
-
All Steps Identified
-
All Hazards Identified
-
All Controls Identified
-
All crew and foreman signatures in place
-
Work activities match PTP
-
Good PTP
Corrective Action
-
Detail issue
-
Detail Corrective Action and owner
-
Due date
-
Check box if completed
-
Name of Auditor and Signature