Title Page

  • Document No.

  • Clients Name & Lot Number

  • Conducted on

  • Prepared by

  • Location
  • Checked All The Braces & Screw Pattens On The Board Comply With The Winstone Gib Manual.

  • Checked That aqua Line Is Used In All Wet Areas

  • Checked All Braces Are Placed To Reduce Areas Seen In Open Spaces, ie: Increase Size To Go From A Door To A Corner Not Just 1.5Mtrs When The Door To Corner Is 2.4Mtrs

  • Have You Got The PS3 From The Gib Installer.

  • Please Insert A Photo Of Every Brace, One Photo Can Include More Than One Brace.

  • Read Notes In Council Inspections For Anything Asked For At The Time Of Pre Line Inspection.

  • Please Check Everyone has Been Inducted And Has Signed In.

  • Site Conditions

  • Are The Correct Hazards Marked On The Signs

Complete This Form While Onsite.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.