Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Location
-
Checked By
- Vaughan Pearce
- Dane Robinson
- Trevor Purcell
- Cam Townsend
- Nicola Marii
- Paul Cronin
- Raymond Oosterbeek
- Trevor Grant
- Minesh Lal
-
Add signature
You Are To Do The Inspection Onsite With The Drain Layer While He Is Laying The Pipes.
-
Weather Conditions
-
Site Conditions
-
LBP Licence Checked / Number
-
Work Carried Out As Per Plan And Building Act
-
Checked Pipes Are Full Of Water
-
Checked Pipes Are Glued
-
Checked Metal Surrounds All Pipes
-
Checked As-Builts Have Been Done, And Received As-Built Drawing
-
Check We Have PS From Plumber
-
Plumbers LBP Number
-
Please Insert Five Or More Photos
-
Checked That All Excess Material Is Removed From Site And Signs Are In Place with Hazards Updated