Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Location
-
Checked By
- Vaughan Pearce
- Dane Robinson
- Trevor Purcell
- Cam Townsend
- Nicola Marii
- Paul Cronin
- Raymond Oosterbeek
- Trevor Grant
- Minesh Lal
Drainage Inspection
-
Weather Conditions
-
Site Conditions
Work Carried Out As Per Plan Specifications And Building Act
-
Has The Drainage Work Met The Plan Specifications And Building Act
Drain Layers Information
-
Drain Layers Name
-
Drain Layers Registration Verified
-
Drain Layers Registration Number
Document Confirmation
-
Progressive As-Built Available
-
Drains Laid As Per Plan
-
As-Built Plans Received
Physical And Visual Layout
-
PCV 1Mtr 100mm PVC Approved Pipe/Iplex/Marley
-
Drain Depth (300mm Minimum)
-
Inspection Fittings (Correct Positioning)
-
ORG or Gully Trap (Correct Positioning)
-
Drain Vent (Correct Positioning)
-
Gradient 16mm over 1 Metre
-
Granular Bedding ( Is The Pipe supported ?)
-
Drain Tested, Air or Water
-
Connection To Council Drain
-
Septic Tank and Effluent Field
-
Drain Depth. (300mm Minimum)
-
Inspection Fittings
-
Reflux Valves
-
Manhole, Chamber Construction
-
Retention Or Detention Tanks
-
Orifice Size
-
Gradient %
-
Please Insert Five Or More Photos
Build Quality Assurance Sign Off
-
Add signature