Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Plumber

  • Pipes straight, correct heights

  • Damaged wrap required

  • Check final kitchen plan

  • Relief drain from HWC ok

  • Pipes lagged where necessary

  • Pipe locations checked & correct

  • Waste pipes located inside walls

  • Solar panels on roof

House Keeping

  • Bin in place

  • Site left in a safe manner

  • G.J sign and danger sign up

  • Job left clean, rubbish in bin.

Are any rectification works required?

  • Works required

  • Date to be completed

  • Signature of person conducting the Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.