Title Page
-
Amazon Construction Manager
-
Project Code
-
Location
-
Contractor Project Manager
-
Person(s) Conducting Inspection
-
Date
-
GC/PC Company
-
H&S Consultant Company
1. Planning for H&S
-
The GC has prepared a project specific H&S plan which is being implemented on the project
- 5
- 4
- 3
- 2
- 1
- 0
-
The GC is aware of and is compliant with the Amazon Developer, Contractor and Vendor Health and Safety Performance Standards
- 5
- 4
- 3
- 2
- 1
- 0
-
The General Contractor holds formal H&S meetings between the contractors present on site?
- 5
- 4
- 3
- 2
- 1
- 0
-
The H&S plan has been updated, is current and being implemented?
- 5
- 4
- 3
- 2
- 1
- 0
-
The H&S plan indicates responsibilites for implementation.
- 5
- 4
- 3
- 2
- 1
- 0
2. Contractor/Sub Contractor Requirements
-
Contractors are working to the requirements detailed in the GC H&S plan
- 5
- 4
- 3
- 2
- 1
- 0
-
The GC has defined the minimum H&S competencies required by contractor/ sub contractors supervision
- 5
- 4
- 3
- 2
- 1
- 0
-
Specific arrangements are in place for those who do not speak the country language of the project
- 5
- 4
- 3
- 2
- 1
- 0
-
Contractors carry out regular H&S training, briefings, tool box talks etc
- 5
- 4
- 3
- 2
- 1
- 0
-
Contractors have been made aware of Amazon Developer, Contractor and Vendor Health and Safety Performance Standards
- 5
- 4
- 3
- 2
- 1
- 0
3. Access Control and Security
-
The project perimeter is secure and access by unauthorised persons is prevented
- 5
- 4
- 3
- 2
- 1
- 0
-
Access is controlled for the workforce and visitors and linked to the Induction process
- 5
- 4
- 3
- 2
- 1
- 0
-
Pedestrian and vehicle access is separated , safe and functioning.
- 5
- 4
- 3
- 2
- 1
- 0
-
Understandable H&S information is given to delivery drivers
- 5
- 4
- 3
- 2
- 1
- 0
-
Multiple access gates operate to the same access control standards.
- 5
- 4
- 3
- 2
- 1
- 0
4. H&S Induction and Training
-
The GC has prepared a project specific H&S Induction which is being delivered on the project
- 5
- 4
- 3
- 2
- 1
- 0
-
The H&S Induction specifically addresses Fatal Risks, Site Controls and focus and individual inputs required.
- 5
- 4
- 3
- 2
- 1
- 0
-
The H&S Induction is required to gain access on to the project.
- 5
- 4
- 3
- 2
- 1
- 0
-
There are arrangements in place to ensure all contractors, third parties and visitors receive a H&S Induction
- 5
- 4
- 3
- 2
- 1
- 0
-
It is possible to identify anyone who has been H&S Inducted out on the project.
- 5
- 4
- 3
- 2
- 1
- 0
5. Fatal Risk Controls
-
Project fatal risks have been identified and specific focus arrangements have been identified , documented and site control measures collectively reflect this.
- 5
- 4
- 3
- 2
- 1
- 0
-
Contractors whose activities include defined fatal risks are known and preparation , supervision and oversight is targetted accordingly.
- 5
- 4
- 3
- 2
- 1
- 0
-
Fatal Risk activities are being managed through specific controls, supervision, monitoring, safe working and review.
- 5
- 4
- 3
- 2
- 1
- 0
-
Unsafe conditions, behaviours or working involving fatal risks is subject to consistent appication of an escalation process by the GC
- 5
- 4
- 3
- 2
- 1
- 0
-
Collective fatal risk controls are prioritised
- 5
- 4
- 3
- 2
- 1
- 0
6. Risk Assessment and Method Statements
-
Arrangements are in place to obtain RAMS in advance of works , authorise and retain records
- 5
- 4
- 3
- 2
- 1
- 0
-
Proof of briefing records are available for any vetted and authorised RAMS
- 5
- 4
- 3
- 2
- 1
- 0
-
Contractors supervisors have been involved with, have knowledge of and are supervising works as defined within vetted RAMS
- 5
- 4
- 3
- 2
- 1
- 0
-
Sub contracted elements of activities are subject to the same controls listed above
- 5
- 4
- 3
- 2
- 1
- 0
-
There are arrangements for managing H&S if the methodology is required to change
- 5
- 4
- 3
- 2
- 1
- 0
7. Supervision, Competency
-
The GC has defined minimum H&S responsibilities for all supervisors on the project.
- 5
- 4
- 3
- 2
- 1
- 0
-
Records are available confirming supervisors competency checks
- 5
- 4
- 3
- 2
- 1
- 0
-
Supervisors can be easily identified out on the project
- 5
- 4
- 3
- 2
- 1
- 0
-
The role of supervisors when unsafe working, acts or conditions are identified is always considered
- 5
- 4
- 3
- 2
- 1
- 0
-
Supervisors are participating in all H&S related coordination and cooperation arrangements
- 5
- 4
- 3
- 2
- 1
- 0
8. H&S Support and Advice
-
The GC is supported by adequate H&S expertise.
- 5
- 4
- 3
- 2
- 1
- 0
-
All H&S appointees coordinate and work together with agreed forms of communic ation, protocols and prioritisation
- 5
- 4
- 3
- 2
- 1
- 0
-
The H&S teams are empowered to stop unsafe working if required.
- 5
- 4
- 3
- 2
- 1
- 0
-
Positive H&S performance, practices and behaviours are identified and recorded.
- 5
- 4
- 3
- 2
- 1
- 0
-
H&s performance data is produced, reviewed and visible to the project workforce.
- 5
- 4
- 3
- 2
- 1
- 0
9. Non conformance and Escalation Process
-
The GC has a formally defined process for dealing with non conformances including an escalation protocol.
- 5
- 4
- 3
- 2
- 1
- 0
-
Unsafe working involving fatal risks is prioritised
- 5
- 4
- 3
- 2
- 1
- 0
-
The escalation process is used when required with evidence available
- 5
- 4
- 3
- 2
- 1
- 0
-
Unsafe working is stopped by the GC/ Contractor supervision when required
- 5
- 4
- 3
- 2
- 1
- 0
-
Near miss events are reported and acted upon
- 5
- 4
- 3
- 2
- 1
- 0
10. Monitoring and Inspection
-
Effective arrangements are in place for the oversight and monitoring of H&S on the project involving the GC team, Contractors and H&S.
- 5
- 4
- 3
- 2
- 1
- 0
-
Plant and Equipment maintenance records are available and regular inspections and checks are being done
- 5
- 4
- 3
- 2
- 1
- 0
-
Monitoring and checks for occupational health issues are being carried out
- 5
- 4
- 3
- 2
- 1
- 0
-
Supervisors are involved in monitoring and inspection checks.
- 5
- 4
- 3
- 2
- 1
- 0
-
H&S meetings include review of H&S inspections, audits and checks?
- 5
- 4
- 3
- 2
- 1
- 0
11. Personal Protective Equipment
-
Minimum PPE requirements have been established and are being complied with on the project
- 5
- 4
- 3
- 2
- 1
- 0
-
PPE Site rules are confirmed in H&S Induction and by signage on the project.
- 5
- 4
- 3
- 2
- 1
- 0
-
Additional PPE is being worn when required as detailed in RAMS or as required by project conditions
- 5
- 4
- 3
- 2
- 1
- 0
-
PPE compliance and use is consistent across all areas of the project
- 5
- 4
- 3
- 2
- 1
- 0
-
PPE is adequate and suitable, well maintained and being worn correctly
- 5
- 4
- 3
- 2
- 1
- 0
12. Emergency Arrangements
-
The GC has defined arrangements for Fire, Evacuation and Medical emergencies which are implemented on the project
- 5
- 4
- 3
- 2
- 1
- 0
-
Contractors have trained first aiders within their workforce
- 5
- 4
- 3
- 2
- 1
- 0
-
Fire prevention , detection and means of sounding alarm is in place and is effective
- 5
- 4
- 3
- 2
- 1
- 0
-
Control gate staff are aware of actions to be taken in the event that external emergency services are called
- 5
- 4
- 3
- 2
- 1
- 0
-
Operatives out on the project can confirm emergency arrangements when asked.
- 5
- 4
- 3
- 2
- 1
- 0
13. Housekeeping and Waste Materials, Lighting
-
Access to and throughout the project is safe as a result of good housekeeping, rubbish removal and lighting.
- 5
- 4
- 3
- 2
- 1
- 0
-
Discarded materials are removed as soon as practicable.
- 5
- 4
- 3
- 2
- 1
- 0
-
Access lighting is provided within the building(s), access to same and within compound and gate areas .
- 5
- 4
- 3
- 2
- 1
- 0
-
Building materials are stored in designated areas, are stable and secured against movement.
- 5
- 4
- 3
- 2
- 1
- 0
-
Portable Halogen lighting is not in use
- 5
- 4
- 3
- 2
- 1
- 0
14. Reporting of Unsafe, Acts, Conditions, Near Miss Events and Incidents
-
The GC has arrangements in place for reporting unsafe acts, behaviours, conditions or incidents.
- 5
- 4
- 3
- 2
- 1
- 0
-
Records are available and used for contractor performance data
- 5
- 4
- 3
- 2
- 1
- 0
-
Corrective actions are recorded and effectiveness checked to prevent reoccurences
- 5
- 4
- 3
- 2
- 1
- 0
-
Positive and negative feedback is given to the workforce following any of the above occurences
- 5
- 4
- 3
- 2
- 1
- 0
-
Training and rebriefings are carried out
- 5
- 4
- 3
- 2
- 1
- 0
15. Information, Signage
-
There is adequate information, signage and warning notices in place on the project.
- 5
- 4
- 3
- 2
- 1
- 0
-
Information is regulary updated giving details of current high risk activities, performance, lessons learned and themes related to hazard awareness or health risks.
- 5
- 4
- 3
- 2
- 1
- 0
-
Information and signage is provided in a format taking into account a multi lingual workforce.
- 5
- 4
- 3
- 2
- 1
- 0
-
Warning signage is in place in high risk zones.
- 5
- 4
- 3
- 2
- 1
- 0
-
Emergency action signage is in place and visible to workforce
- 5
- 4
- 3
- 2
- 1
- 0
16. Plant, Equipment, Tools
-
Working arrangements are evident to ensure plant , equipment and tools are maintained and are used by trained and competent individuals.
- 5
- 4
- 3
- 2
- 1
- 0
-
On site checks are carried out for operator competence,plant certification and equipment maintenance.
- 5
- 4
- 3
- 2
- 1
- 0
-
Plant and equipment is secured against unauthorised use
- 5
- 4
- 3
- 2
- 1
- 0
-
Electrical supplies for use or charging are safe , maintained and protected
- 5
- 4
- 3
- 2
- 1
- 0
-
When working at height effective measures are in place to prevent tools falling or persons below being struck by works above.
- 5
- 4
- 3
- 2
- 1
- 0
17. Amazon Contractors
-
Amazon contractors are fully engaged with the GC in maintaining H&S standards and for coordinating and controling activities to achieve the same.
- 5
- 4
- 3
- 2
- 1
- 0
18. Corrective Actions, Improvements and Best Practice
-
Corrective actions are effective, H&S standards are improving and best practice is adopted whenever possible.
- 5
- 4
- 3
- 2
- 1
- 0
-
H&S performance data is available showing KPIs , trends and overall project H&S standards
- 5
- 4
- 3
- 2
- 1
- 0
-
Best practice and suggestions for improvements are implemented with feedback given to the workforce.
- 5
- 4
- 3
- 2
- 1
- 0
-
Best pratice is shared with other projects
- 5
- 4
- 3
- 2
- 1
- 0
-
Self policing actions by contractors and or individuals is recognised .
- 5
- 4
- 3
- 2
- 1
- 0
19. Welfare
-
Sufficient Toilets, washing and welfare facilities are provided which are operational, maintained and safe to access.
- 5
- 4
- 3
- 2
- 1
- 0
-
Toilet facilities are provided on safe locations out on the project
- 5
- 4
- 3
- 2
- 1
- 0
-
Compliant and sufficient first aid arrangements are in place
- 5
- 4
- 3
- 2
- 1
- 0
-
Canteen facility is provided
- 5
- 4
- 3
- 2
- 1
- 0
-
Designated smoking areas are provided
- 5
- 4
- 3
- 2
- 1
- 0
20. Storage, Containers, Fuels and Gases
-
Designated storage areas are in place for all materials, waste, equipment , fuels and gas supplies
- 5
- 4
- 3
- 2
- 1
- 0
-
Fuel storage arrangements and dispensing are compliant and safe.
- 5
- 4
- 3
- 2
- 1
- 0
-
Storage facilities and laydown areas are safe to access at all times.
- 5
- 4
- 3
- 2
- 1
- 0
-
Information on hazardous substances is available and being used
- 5
- 4
- 3
- 2
- 1
- 0
-
Daily arrangements for managing the safe use of fuels and gases is robust and adequate
- 5
- 4
- 3
- 2
- 1
- 0
Completion
-
Sign Off