Information

  • Document No.

  • 1. Communities

  • 2. Contractor

  • 3. Project Manager / Supervisor

  • 4. Date

  • 5. Area of inspection

  • Assessor

  • Location
  • Personnel

GMR 1 PREVENTION / GMR 2 PERIMETER PROTECTION

  • 1.1 Physical barriers

  • 1.2 Harness if required for secondary restraint & competency assessed

  • 1.3 SWMS in place with adequate controls

  • 1.4 Rescue procedures in place

  • 2.1 Physical barriers of sufficient height and strength erected where persons

GMR 3 FORMWORK / GMR 4 FORMWORK

  • 3.1 Fabricated at ground level where possible

  • 3.2 Fall risks managed

  • 3.3 Installed to design

  • 4.1 Covers secured (screwed or bolted but not nailed) with warning signage

  • 4.2 When covers removed for work purposes secondary measures installed to reduce fall risk

GMR 5 SCAFFOLDS, TEMPORARY WORKS

  • 5.1 No mixing of components

  • 5.2 Inspection & tagging regime in place

  • 5.3 Calculations & drawings

  • 5.4 Erected, altered & dismantled by competent persons

  • 5.5 Free from defects

  • 5.6 Ladders extending 1M above egress

  • 5.7 Fall risks managed

  • 5.8 Boarded/planked out/<br>

  • 5.9 High risk temporary structures eg billboards/hoarding – design & certification paperwork maintained<br>

GMR 6 WORK PLATFORMS

  • 6.1 SWMSs in place with adequate controls

  • 6.2 Harnesses in use in boom type EWPs

  • 6.3 Anchor points must be engineered

  • 6.4 Competency records held

  • 6.5 Documented inspections completed

GMR 7 LADDERS

  • 7.1 Use minimised & safer methods selected where possible

  • 7.2 Step ladders only used for 15 mins or less

  • 7.3 Industrially rated (stickered) & minimum 120kg rating

  • 7.4 In good condition

  • 7.5 Secured to prevent movement

  • 7.6 Non-conductive ladders for electrical works

  • 7.7 Extending at least 1M above egress point

GMR 8 FALL OF MATERIALS / GMR 9 SITE ACCESS CONTROL / GMR 10 FENCING

  • 8.1 Tethers, catch nets, exclusion zones in place

  • 8.2 Housekeeping to minimise materials which could fall

  • 9.1 Unauthorised persons prevented from entering & entry/exit records maintained<br> <br> <br> <br>

  • 10.1 In place for all high risk activities & complete (no gaps where public could enter

  • 10.2 Erected to manufacturers requirements

  • 10.3 Documented inspections taking place

GMR 11 PUBLIC PROTECTION / GMR 12 PEDESTRIAN AND VEHICLE SAFETY

  • 11.1 Protection of public from construction activities including works inside fenced perimeters & also traffic movements

  • 11.2 Road & access ways clean & free from material & waste

  • 11.3 Loads secured prior to exiting site

  • 12.1 Separate entrances for pedestrians & vehicles

  • 12.2 Parking separation LV/HV with reverse parking

  • 12.3 Delivery procedures in place

  • 12.4 Vehicles choked/braked before unloading or leaving

  • 12.5 TMP’s in place

  • 12.6 Licensed drivers/operators

  • 12.7 No use of phones & safety devices (seatbelts, beacons etc in use)

GMR 13 TOOLS & EQUIPMENT

  • 13.1 Inspection, testing & preventative maintenance regimes in place

  • 13.2 In good condition

GMR 14 HOUSEKEEPING

  • 14.1 Clean & tidy

  • 14.2 Clear access maintained

  • 14.3 Materials stored/stacked correctly

  • 14.4 Hazardous substances stored in accordance with SDS & segregation requirements

  • 14.5 Combustibles away from flammable products

  • 14.6 Products labelled & spill kits available

  • 14.7 Sharp edges (nails/star pickets etc) managed (eg denailed/capped

  • 14.8 Signage (PC, PPE, No Smoking, traffic) in place

  • 14.9 Waste bins (including recycling) available & emptied when required

GMR 15 EXCAVATIONS / GMR 16 WORK AROUND WATER

  • 15.1 Excavation permit in place

  • 15.2 Services located & marked up before works commence

  • 15.3 Inspections (documented) by a competent person

  • 15.4 Excavations benched, battered or shored

  • 15.5 Adjacent structures supported

  • 15.6 Materials/traffic routes away from zone of influence

  • 15.7 Barriers and signage installed

  • 15.8 Safe access via ramps, ladders, stairs

  • 15.9 Well ventilated & water ingress controlled

  • 15.10 Spoil out of zone of influence & stored safely

  • 16.1 Life jackets being worn, rescue equipment available<br> <br> <br> <br>

GMR 17 SAFE USE OF PLANT

  • 17.1 Ticketed operators

  • 17.2 In good condition & pre-start completed

  • 17.3 Risk assessment & SWMSs available

  • 17.4 ROPs, seatbelts, flashing beacon, audible devices

  • 17.5 Fall risks (hand rails) managed

  • 17.6 Exclusion zone in place

  • 17.7 Maintained with records available

GMR 18 CRANES AND LIFTING EQUIPMENT

  • 18.1 Safety devices (eg load indicators/overload alarms

  • 18.2 Lifting gear inspected, in good condition & used for its intended use & contained in a register

  • 18.3 Competency records held

  • 18.4 Communication protocol established

  • 18.5 Safety hooks/tag lines in use

GMR 19 GMR 19 ELECTRICAL SAFETY

  • 19.1 RCD’s/ELCB fitted

  • 19.2 Cables do not create tripping hazard nor are subject to physical damage

  • 19.3 Tested & tagged with register maintained

  • 19.4 No live work except under certain conditions

  • 19.5 LOTO in place & carried out by competent person

  • 19.6 Adequate lighting with emergency back-up (where required

GMR 20 HAZARDOUS SUBSTANCES

  • 20.1 SDS available & in register – accessible to workers

  • 20.2 Stored, used & disposed in accordance with SDS

  • 20.3 PPE as per SDS

GMR 21 PPE / GMR 22 CONFINED SPACES

  • 21.1 Hard hat, glasses, gloves, high vis & boots & sun protection (brims, longs, sunscreen)

  • 21.2 Additional PPE dependent on task

  • 21.3 Signage at site entrances & where additional risks exist

  • 21.4 Stock available for workers & visitors

  • 22.1 Signed & protected to prevent access

  • 22.2 Permit/SWMSs & competent persons

  • 22.3 Rescue procedures & equipment

  • 22.4 Watch installed 100% of time persons in CS

GMR 23 MANUAL HANDLING/ GMR 24 LONE WORKING / GMR 25 WELFARE

  • 23.1 Tasks assessed & safe lifting techniques identified

  • 23.2 Lifting aids in place

  • 24.1 Avoided where possible & systems in place to manage risk if unavoidable<br> <br> <br> <br>

  • 25.1 Toilets, wash facilities, drinking water<br> <br> <br> <br>

GMR 26 FIRE SAFETY & EMERGENCIES

  • 26.1 Minimise accumulation of combustibles

  • 26.2 Flashback arrestors on oxy acet

  • 26.3 Smoking only in designated areas

  • 26.4 Hot work under permit

  • 26.5 Emergency equipment available, tested/tagged & unobstructed with inspection regime in place

  • 26.6 Trained responders (fire, first aid, confined space etc)

  • 26.7 Muster points/routes identified

GMR 27 STORMWATER, SEDIMENT & EROSION CONTROL / GMR 28 AIR AND NOISE EMISSIONS

  • 27.1 Uncontrolled discharges prevented

  • 27.2 Controls installed as designed

  • 28.1 Dust suppression<br>

  • 28.2 Air and noise impacts assessed and controlled

  • 29.1 Contamination sources identified & segregated with controls identified to allow works to proceed<br> <br> <br> <br>

GMR 30 BIODIVERSITY, HERITAGE & ARTEFACTS / GMR 31 WASTE MANAGEMENT

  • 30.1 Designated zones identified, signed & segregated with controls identified for works

  • 30.2 Work ceased where items discovered to allow for determination

  • 31.1 Waste segregated for recycling & stored to prevent unauthorised access/uncontrolled release

  • 31.2 Excavated material reused on site where possible

  • 31.3 Service of plant & equipment offsite where possible

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.