Title Page

Office Administration

  • All Certifications are up to date (Crane/Hoist/Winch, CO monitoring)

  • Crane / Hoist / Winch

  • Completed on

  • CO monitoring

  • Completed on

  • Plant has all checklists up to date (forklift, fire extinguishers, ladder inspection, audits, first aid)

  • Forklift

  • Completed on

  • Fire extinguishers

  • Completed on

  • Ladder inspection

  • Completed on

  • Monthly Plant/Yard audit

  • Completed on

  • First aid tracking

  • Completed on

  • All training completed (LOTO, Annual, Forklift, Safety)

  • LOTO

  • Completed on

  • Annual

  • Completed on

  • Forklift

  • Completed on

  • Safety

  • Completed on

  • Safety Meeting notes documented (Safety committee, Tool box talks)

  • Safety Committee

  • Completed on

  • Tool box talks

  • Completed on

  • Misc. safety items communicated/posted (Site map, Evac. plan, GHS/HAZ, Meeting place)

  • Site map is complete and adequate

  • Completed on

  • Evacuation plan posted and adequate

  • Completed on

  • GHS/HAZ com chemicals communicated

  • Completed on

  • Meeting place for emergencies is understood

  • Completed on

Administrative - Plant and Yard

  • Kits (First aid, Blood borne, Sharps container, eye wash)

  • First aid kits are available and adequate

  • Completed on

  • Blood borne kits are available and adequate

  • Completed on

  • Sharps container available and convenient

  • Completed on

  • Eye wash station installed and current

  • Completed on

  • First aid logs/forms (first aid, sharps, accident)

  • First aid tracking complete

  • Completed on

  • Sharps log present

  • Completed on

  • Accident investigation forms available

  • Completed on

  • First aid communications (SDS, Emergency numbers)

  • SDS book available and adequate

  • Completed on

  • 911 numbers posted (Hospital, Fire and Police)

  • Completed on

  • Poison control numbers posted

  • Completed on

  • General Communications (Plant location, OSHA, Accident, Yard signs)

  • Plant location and address posted

  • Completed on

  • OSHA posters posted and current

  • Completed on

  • Accident procedure posted

  • Completed on

  • Signage clearly posted for customers

  • Completed on

  • Fuel tanks have adequate signage

  • Completed on

PPE - Plant and Yard

  • Safety knives used when possible

  • Completed on

  • Hands (Gloves)

  • Heat resistant gloves available and worn

  • Completed on

  • Cut resistant gloves available and worn

  • Completed on

  • Cold weather gloves available

  • Completed on

  • Insulated rubber gloves for fueling provided

  • Completed on

  • Head (Ear plugs, glasses, shields, hoods)

  • Ear plugs/muff available and worn

  • Completed on

  • Safety glasses available and worn

  • Completed on

  • Face shields available and worn

  • Completed on

  • Welding hoods available and worn

  • Completed on

  • Body/Feet (clothing, footwear, rain gear, safety vests)

  • Proper clothing worn/enforced

  • Completed on

  • Proper footwear (observed)

  • Completed on

  • Rain gear available

  • Completed on

  • Safety vests or Hi-Vis shirts being worn

  • Completed on

  • Purging PPE (jackets, hoods)

  • Purging jackets available and worn

  • Completed on

  • Purging hoods available and worn

  • Completed on

Housekeeping/Fire Safety/Exits - Plant and Yard

  • GHS (Floors/Walkways, doors functional, emergency lighting, purgings, dust)

  • Floors clean, dry, organized

  • Completed on

  • All doors are functional

  • Completed on

  • Designated walkways are clear of debris

  • Completed on

  • Emergency lighting is in working order and adequately placed

  • Completed on

  • Overhead doors are free of debris

  • Completed on

  • Proper dust control measures are in place

  • Completed on

  • Twine is reasonably picked up and disposed

  • Completed on

  • Dock areas are clean and free of debris

  • Completed on

  • Resin spills are contained (no open drains)

  • Completed on

  • Purgings have been picked up and stored properly

  • Completed on

  • Equipment/Inventory organization (Equipment stored, twine stacked, center cores, pipe stacked)

  • Unused equipment is being stored properly

  • Completed on

  • Pallets are stacked straight

  • Completed on

  • Twine and sock are stacked properly

  • Completed on

  • Fittings area is reasonably organized

  • Completed on

  • Center cores are stacked neatly and not scattered through out

  • Completed on

  • Pipe is reasonably and safely stacked

  • Completed on

  • Exits (Clear, routes, signs)

  • Exits are clear of debris

  • Completed on

  • Exit routes are clear of debris

  • Completed on

  • Exterior exit routes are clear of debris

  • Completed on

  • Exit signs are adequately placed

  • Completed on

  • Exit signs are in working order

  • Completed on

  • Fire Safety (Flammables, propane, heaters, Oxy, acetylene tanks)

  • All flammables are kept in cabinets

  • Completed on

  • Flammable rags kept in proper conatiner

  • Completed on

  • Flammable cabinets installed and used

  • Completed on

  • Heaters are free of flammable items nearby

  • Completed on

  • Extra Acetylene and Oxygen tanks stored 25' apart

  • Completed on

  • Acetylene and Oxygen tanks are stored properly

  • Completed on

  • Liquid propane tanks are stored properly

  • Completed on

  • Fire extinguishers (location, inspection, Class "C")

  • Fire extinguishers are adequately placed

  • Completed on

  • Fire extinguishers have been inspected annually

  • Completed on

  • Fire extinguishers have been inspected monthly

  • Completed on

  • Class C fire extinguisher present in MCC room

  • Completed on

Electrical - Plant and Yard

  • Electrical boxes/cabinets/transformers (Doors, safe clearance, debris, securely fastened, knockouts)

  • Electrical doors are closed

  • Completed on

  • Electrical cabinets are clear of debris

  • Completed on

  • There is safe electrical clearance

  • Completed on

  • All breakers have been labeled properly and none are missing

  • Completed on

  • Transformers and electrical boxes have been securely fastened

  • Completed on

  • There are no missing knockout plugs in electrical boxes

  • Completed on

  • Wires (Insulation, loose, condition, 12 gauge, wire nuts, temporary, cord drops)

  • There are no exposed or bare wires present

  • Completed on

  • All electrical connections are tight

  • Completed on

  • All electrical cords/leads are in good condition

  • Completed on

  • Only 12 gauge or larger extension cords are being used

  • Completed on

  • Extension cords are being use only for temporary use

  • Completed on

  • There are no heater studs exposed or wire nuts being used

  • Completed on

  • Drop cords are installed where needed

  • Completed on

  • LOTO (Procedures, tracking, materials)

  • LOTO procedures are posted on or near all equipment

  • Completed on

  • LOTO procedures are adequate and accurate

  • Completed on

  • LOTO is being followed per the tracking log

  • Completed on

  • LOTO Materials are available and adequate

  • Completed on

  • Interlocks (installed, functioning)

  • Perforator interlocks have been installed

  • Completed on

  • Perforator interlocks are functioning properly

  • Completed on

  • Misc. electrical (strain reliefs, ceramic covers, outlets, conduit, SAF starts, dock lighting)

  • All strain reliefs have been adequately installed

  • Completed on

  • Ceramic covers are being used on heater bands

  • Completed on

  • Outlets are in good condition

  • Completed on

  • Conduit is straight and not damaged

  • Completed on

  • SAF starts are installed where needed

  • Completed on

  • Dock lighting is adequate and functional

  • Completed on

Guarding - Plant and Yard

  • Extruder (extruder, screen changer, melt pump, striper hose)

  • Extruder gear box guarding is adequate

  • Completed on

  • Extruder drive motor guarding is adequate

  • Completed on

  • Screen changer guarding is adequate

  • Completed on

  • Melt pump guarding is adequate

  • Completed on

  • Striper hose is in good working order with no leaks

  • Completed on

  • Purging (chains, guards, used)

  • Purging guard is in place and adequate

  • Completed on

  • Purging guard is being used

  • Completed on

  • Purging chains and signs have been installed and used

  • Completed on

  • Corrugator (gearbox, track, handrails)

  • Corrugator gearbox guarding is adequate

  • Completed on

  • Corrugator track guarding is adequate

  • Completed on

  • Corrugator handrails adequate if applicable

  • Completed on

  • Corrugator upstream guarding is adequate

  • Completed on

  • Corrugator downstream guarding is adequate

  • Completed on

  • Downstream equipment (waterbath, wheels, perforator, coiler, auxiliary)

  • Waterbath guarding is adequate

  • Completed on

  • Haul-off/Pulling wheels guarding is adequate

  • Completed on

  • Perforator guarding is adequate

  • Completed on

  • Coiler guarding is adequate

  • Completed on

  • Guarding on auxiliary equipment is adequate

  • Completed on

  • Misc. equipment (drill press, bandsaw, grinder)

  • Drill press has adequate chuck guards

  • Completed on

  • Drill press is securely fastened

  • Completed on

  • Bandsaw guarding is adequate

  • Completed on

  • Bandsaw guards are adjusted correctly per part

  • Completed on

  • Bench grinder is securely fastened

  • Completed on

  • Bench grinder wheel has been ring tested, or replaced yearly

  • Completed on

  • Bench grinder tongue and tool rest guards have been adjusted properly

  • Completed on

  • Fuel tanks (berming, protection)

  • Fuel tank berming is adequate

  • Completed on

  • Fuel tanks are protected against damage

  • Completed on

Oil leaks and Bulk oil - Plant and Yard

  • Oil leaks (extruders, corrugators, perforators, vacuum pumps)

  • Extruders are free of oil leaks

  • Completed on

  • Corrugators are free of oil leaks

  • Completed on

  • Perforators are free of oil leaks

  • Completed on

  • Vacuum pumps are free of oil leaks

  • Completed on

  • Bulk oil (storage, containment)

  • Oil stored in an adequate area

  • Completed on

  • Spill containment is used and adequate for bulk oil

  • Completed on

Mezzanine/Stairs/Handrails/Racking - Plant and Yard

  • Mezzanine (labels, handrails, items stored)

  • Mezzanine storage labeled with 3"x5" limits

  • Completed on

  • Mezzanine storage has adequate handrails

  • Completed on

  • Items stored on mezzanine are secure

  • Completed on

  • Stairs/Tie down Ladders (Stairways, mobile stairs)

  • Stairways meet OSHA standards

  • Completed on

  • Stairways are clear and unobstructed

  • Completed on

  • Mobile stairs are in good condition/straight

  • Completed on

  • Mobile stairs have not been modified

  • Completed on

  • Tie down ladders available for rack trailers

  • Completed on

  • Handrails

  • All other areas that need handrails have adequate handrails

  • Completed on

  • Handrails on stairways are secure (200#)

  • Completed on

  • Pallet racking (anchored, load limits, items stored)

  • Pallet racking is anchored properly

  • Completed on

  • Pallet racking has posted weight limits on each shelf

  • Completed on

  • Items on pallet racking are stored safely

  • Completed on

  • Steel racks (anchored, load limits, sufficient)

  • Steel racks are properly anchored

  • Completed on

  • Steel racks are labeled with 3"x5" load rating on each shelf

  • Completed on

  • Steel racks are sufficient to hold current load

  • Completed on

Forklifts - Plant and Yard

  • Safety Features (horn, seat/seatbelt, glass, lights)

  • Seat belt is installed and functional

  • Completed on

  • Seat is in factory condition

  • Completed on

  • Lights, break lights and flashers are functional

  • Completed on

  • Horn is functional

  • Completed on

  • Windows are free of cracks/breaks

  • Completed on

  • Windows are clean and clear

  • Completed on

  • Attachments (condition)

  • Forklift attachments are adequate

  • Completed on

  • Forklift attachments are not bent

  • Completed on

  • Forklift attachments are free of cracks/defects

  • Completed on

  • Misc. forklift items (propane tanks, parked, mast, speed)

  • Liquid propane tank (if LP) is secured properly

  • Completed on

  • Liquid propane tank (if LP) is aligned on the alignment pin

  • Completed on

  • Forklift is parked properly (brake engaged and forks are down)

  • Completed on

  • Mast is free of defects, cracks or damage

  • Completed on

  • Forklifts are operating at adequate speeds

  • Completed on

Trucks/Trailers/Other yard vehicles

  • Safety features (windshield and lights)

  • Truck windshields are free of cracks

  • Completed on

  • Pickup windshields are free of cracks

  • Completed on

  • Truck lights appear to be in good condition

  • Completed on

  • Pickup lights appear to be in good condition

  • Completed on

  • Trailer lights appear to be in good condition

  • Completed on

  • Straps/Tie downs (function, good working order)

  • Ratchet straps function properly

  • Completed on

  • Straps are undamaged - Good working order

  • Completed on

  • Misc. trucks/trailers/other yard vehicles (safety chains, tires, chocks, jacks)

  • Safety chains present on slant undercarriage

  • Completed on

  • Truck tires appear to be in good condition

  • Completed on

  • Trailer tires appear to be in good condition

  • Completed on

  • Wheel chocks available and used

  • Completed on

  • Trailer jacks available and being used for docked vans

  • Completed on

Miscellaneous safety items - Plant and yard

  • Traffic (lanes, speed limits)

  • Lanes are adequate width for loading

  • Completed on

  • Lanes are adequate width for traffic flow

  • Completed on

  • Speed limits are posted and followed

  • Completed on

  • Misc. equipment (bag/trash/cardboard compactors)

  • Bag compactor functioning properly

  • Completed on

  • Trash compactor functioning properly

  • Completed on

  • Cardboard compactor functioning properly

  • Completed on

  • Environment/ergonomics (water, restrooms, shade, lifting)

  • Adequate and fresh water is provided

  • Completed on

  • Restrooms are adequate and nearby

  • Completed on

  • Adequate shaded area available for breaks

  • Completed on

  • Proper lifting techniques observed

  • Completed on

  • Lifting chains/Straps (condition, Inspection tag)

  • Lifting chains/straps have inspected tag attached to them

  • Completed on

  • Lifting chains and straps are in good condition with no frays

  • Completed on

  • Other safety items (air wands, handles, drainage, other safety items)

  • Air wands/hoses are approved

  • Completed on

  • Brooms/Shovels have factory handles

  • Completed on

  • Drainage is controlled adequately

  • Completed on

  • Other safety items

  • Completed on

  • Due date to complete "At risk" items

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.