Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Flight Number of Audited Flights
Airport
-
Check-in
-
Arrivals
-
Departure Gates
-
Ramp
Section A - Check In
-
Do desks open and close on time and are there enough?
-
Are company logos and branding correct?
-
Are security questions displayed and drawn to passengers attention?
-
Are excess baggage collection procedures followed?
-
If DCS used, which system is it?
-
Is cabin baggage viewed, weighed and tagged?
Section A - Security/Boarding
-
Do agents check tickets and ΙD/passports?
-
Are there enough boarding gates available?
-
Are there sufficient immigration control channels open?
-
Are there separate Schengen channels/Areas?
-
Are the departure lounge FIDS and gate screens correct?
-
Are there enough baggage X-ray machines?
-
Do boarding staff arrive at gate on time?
-
Are PRM's identified and pre-boarded?
-
Is there communication with a/c, re boarding time ETD?
-
Correct/Clear boarding announcements?
-
Are there sufficient buses for remote departures?
-
Are passports/ID,s checked against boarding cards?
Section A - Dangerous Goods
-
Are Dangerous Goods notices provided by handling agent or airport authority displayed at: Check-in, Gates, Flight Desks?
-
Do agents ask/draw attention of customers to DG signs at check-in?
Section B - Ramp Safety ARRIVAL
-
Has the ramp agent briefed the team?
-
Was a pre-arrival FOD check performed?
-
Are vehicles (in use or otherwise) parked in designated areas?
-
Do personnel remain clear until anti-collision lights are off?
-
Is aircraft suitably chocked?
-
Is aircraft inspected for any ground damage prior to equipment being positioned on aircraft? If any damage noted, was the correct reporting procedure followed?
-
Are vehicles positioned only after chocks in place?
-
Prior to offloading commencing: were nets / ULD's correctly secured?
-
Was every hold opened and checked?
-
Do staff avoid walking on moving baggage belts?
Section B - General Turnaround
-
Are vehicles driven in a safe manner around the aircraft?
Section B - Departure
-
Do reversing vehicles use a banksman?
-
Were upper load limits adhered to?
-
Are nets kept in holds at all times and secured for departure?
-
Was all flight paperwork presented to crew in good time?
-
Is any FOD generated by the turnaround removed before departure?
-
If hand signals are used, are they clean and understood by all?
-
Is a pre-departure walk around performed?
Section B - Personal Protective Equipment
-
Is hearing protection worn?
-
Are hi-viz vests worn?
-
Are gloves and protective footwear worn?
Section B - Aircraft Cleaning
-
Do cleaners arrive in good time?
-
Are number of cleaners adequate, or as per SLA?
-
Are correct specifications followed?
Section C - Servicing Equipment
-
Is the equipment serviceable and fit for purpose?
-
Do motorised vehicles have an operating fire extinguisher?
-
Are all vehicles removed and correctly parked?
-
Are GSE clean
-
Are vehicles switched off (or chocked) when not in use?
-
Actions required
Section D - Weight & Balance
-
Is the W&B paperwork produced manually?
-
Is the W&B paperwork produced through handling agents DCS?
-
Are correct passenger weights used?
-
Is loading planned in accordance with airline guidelines?
-
Is a hard copy LIR completed and supplied to the ramp agent?
-
Are any changes fed back to load planning?
-
Is the LIR signed, annotated with actual baggage numbers and presented to the dispatcher?
Section D - Operations
-
Are PNL reports received -24?
-
Are required messages being received from up route station (MVT/LDM/CPM/PSM/PTM etc)?
Section D - Flight File
-
Loadsheet signed by captain and ramp agent?
-
LIRF: annotated, signed and matches info on loadsheet?
-
PNL, pax info lists etc?
-
Inbound/outbound SITA messages (MVT/LDM/CPM/PSM/PTM)?
-
NOTOC (if applicable)
-
Copy of AWB?
-
Storage period: minimum of months
Section E - Lost & Found / Mishandled Baggage
-
Does agent have direct World Tracer access?
Section F - Security
-
How is BRS achieved?
-
Is the security check form held on station for min 48 hours?
Section F - Ramp Incident Reporting
-
Are agents aware of requirement to notify relevant department of incidents & accidents, including aircraft damage?
Section F - Emergency Response Plan
-
Is the stations ERP complete, up to date and understood?
Airport Station Checklist Complete
-
Add signature