Information

  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

Previous Audit Report

  • Has the previous audit report been closed out?

  • Have all previous issues been cleared?

Access and Egress

  • Is there safe access and egress to all working areas of the site?

  • Are walkways free from obstructions and stored materials?

  • Are access routes adequately lit?

  • Access and Egress compliant?

Confined Spaces

  • Confined Spaces include manholes, shafts, pits/tanks, pipes/culverts, certain excavations, silo's and other confined/enclosed spaces.

  • All work in confined spaces should be subject to a specific risk assessment and be carried out in accordance with Permit to Work/Enter and a safe system of work.

  • Only appropriately trained and qualified persons who have undergone an accredited confined spaces entry course shall be permitted to enter a confined space, and only then if the correct checks have been made and the correct safety equipment (breathing apparatus, gas detection equipment, emergency escape equipment etc) are used.

  • Is there a risk assessment for the confined spaces work?

  • Ensure all confined space permits have been checked, are valid and being strictly enforced.

  • Controls should include atmospheric monitoring, emergency escape arrangements, adequate supervision (i.e.: a top man outside of the confined space), method of raising the alarm and safe access/egress etc.

  • Check permits are closed and cancelled upon completion of the works.

  • Confined Spaces compliant?

Consultation

  • Ensure that daily safe to starts are being undertaken and recorded

  • Ensure appropriate Tool Box Talks are given to all employees and that the TBT is recorded

  • RAMS in place, and sign off sheet completed

  • Any paperwork required for site

  • Consultation compliant?

Control of Substances Hazardous to Health (COSHH)

  • Does the supervisor have a copy of the COSHH manual

  • COSHH store available

  • COSHH signage in place

  • Ensure all dangerous/hazardous materials/substances are clearly marked/identified and stored in a secure location appropriate to the substance.

  • Have the appropriate control systems and PPE been provided and is the PPE being used.

  • COSHH Compliant?

Electrical Equipment

  • Ensure that existing services e.g.: electricity cables, gas mains etc have been identified and effective steps have been taken to prevent danger from them.

  • Check that only 110v CTE hand tool etc are in use.

  • Ensure that cables and trailing leads are not trip hazards.

  • Ensure that suitable and sufficient task lighting is provided to enable operatives to safely carry out their work.

  • Electrical Equipment compliant?

Excavations/Earthworks

  • Ensure that checks are made to determine the presence of any buried services before and during all excavation works.

  • All excavations should be carried out in accordance with a detailed method statement s and permit to dig. Is there a permit to dig?

  • Check that there is adequate support and propping for the excavation, or whether it has been sloped or battered back to a safe angle.

  • Check that there is safe access into the excavation (i.e.: a sufficiently long and secured ladder).

  • Check that barriers or other protection to stop people/vehicles falling in are in place.

  • Ensure that materials, spoil and plant is stored away from the edge of the excavation to reduce the chance of collapse.

  • Ensure that the excavation is regularly inspected by a competent person and that a record of such inspections is maintained.

  • Excavations/Earthwork compliant?

First Aid

  • An appropriate number of trained and qualified first aiders should be available on the site.

  • All first aiders should be clearly identified on site through the use of an appropriate helmet sticker.

  • Ensure the first aid kit contains only first aid materials.

  • First Aid requirements compliant?

Housekeeping

  • Ensure all debris and waste is removed from the work area upon completion of the work or at the end of each shift.

  • Ensure Debris is not be allowed to collect around the site.

  • Ensure materials are stored in an appropriate manner so as not to cause damage to or a weakening of the material.

  • Are All pipes and tubes etc securely wedged or choked to prevent accidental movement?

  • Housekeeping compliant?

Health & Safety Management Plan

  • Is the site safety plan up to date.

  • Health and Safety Management Plan compliant?

Lifting Operations/Equipment

  • Have all lifting operation got a valid lifting plan?

  • Ensure that all lifting equipment has been tested and installed by a competent person and is regularly maintained and inspected.

  • Check that the operators are trained and competent.

  • Ensure that cranes and other lifting equipment has sufficient space to operate safely.

  • All lifting equipment should have a thorough examination every 6 months.

  • Ensure lifting operations do not take place near overhead power lines and excavations.

  • Lifting Operations/Equipment compliant?

Manual Handling

  • Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.

  • Check the suitability of using wheelbarrows, hoists, telehandlers and other plant or machinery so that manual handling of heavy objects is kept to a minimum.

  • Ensure all staff have received manual training.

  • Manual Handling compliant?

Mobile Scaffold Towers

  • Check that proprietary tower scaffolds have been erected and are being used in accordance with the suppliers instructions.

  • Check that the wheels of any tower scaffold have been locked when in use and check that the platform is empty when being moved.

  • Are they tagged safe for use?

  • Mobile Towers compliant?

Occupational Health, HAV'S, Noise and Associated Health Risks

  • Check that workers have had information and training so that they know what the risks are from HAV.

  • Ensure reduced-vibration tools are used wherever possible.

  • Limit the exposure of persons to HAV by ensuring that no person uses vibrating tools for longer than the manufactures guided times.

  • Noise - As a general rule, if you: - have to shout to be heard at a distance of 2m, the noise level is approx 85dB and you should consider wearing hearing protection.

  • - have to shout to be heard at a distance of 1m, the noise level is approx 90dB and you should definitely wear hearing protection.

  • Is adequate signage in place?

  • Is segregation in place to ensure that people not involved in the work are kept away from the source of the noise.

  • Occupation health, HAV'S, Noise and associated risks compliant?

Permits to Work

  • Hot Works - Hot Works include welding, oxy-acetylene cutting, use of angle grinders/skill saws etc.

  • Hot works permits in place

  • Cutting zones set up

  • Cutting zones signage in place

  • Dig - digging includes, excavations, knocking in pins, breaking ground etc.

  • Ensure permits to dig have been prepared and issued where the excavations are complex, hazardous or impact on the work or operations of another.

  • All permits to dig should be checked and reviewed prior to issue to ensure the appropriate controls have been included.

  • Ensure all contractors are working in accordance with permits to dig.

  • Ensure the permit is valid.

  • Permits compliant?

Personal Protective Equipment (PPE)

  • PPE General Requirements - Ensure PPE compatibility issues have been considered and that one piece of PPE not restrict the effectiveness of another piece of PPE.

  • All staff wearing Hi-Viz vests or jackets?

  • Eye Protection

  • Ensure that it is of a suitable grade for the type of work being undertaken. I.e. light protection or full goggle etc.

  • Check that it is kept in good condition.

  • Hand Protection - Ensure that where damaged to the hands may occur through activities such as handling, or when using hazardous substances/chemicals that all persons affected wear the appropriate class of safety glove.

  • Ensure gloves are correct for their application and the activity being undertaken.

  • Hearing Protection

  • Ensure the correct type of protection is in use for the task.

  • Ensure that hearing protection is used as instructed.

  • Ensure Areas which are mandatory hearing protection zones are signed as such using the appropriate signs.

  • Respiratory Protection (RPE) - Avoid the use of nuisance dust masks.

  • Ensure that the correct type of respiratory equipment is used for the works being undertaken.

  • Ensure that persons are trained for the use of the RPE and where applicable have a face fit test to ensure the effectiveness of the RPE.

  • Safety Helmets

  • Ensure all staff and visitors are wearing safety helmets.

  • PPE requirements compliant?

Plant & Equipment

  • Ensure that the right tools and equipment are being used for the right job.

  • Were all hand tools found to be in good condition with no defects?

  • Tool box on site in working condition

  • Power Tools

  • Ensure operatives have been trained to use the tools/equipment they are using.

  • Plant

  • Ensure all Plant and Machinery is inspected on a weekly basis by a competent person and recorded in a Plant Inspection Register.

  • Are all plant operators trained and hold a valid plant operators card for the categories being operated?

  • Thorough test certificates available?

  • Bucket change area in place

  • Bucket change signage in place

  • Plant currently in visually acceptable condition

  • Plant and Equipment compliant?

Registers and Records

  • Check the site Inspection Registers for items such as scaffolding, excavations, trench boxes, plant and other equipment have been completed in a timely fashion.

  • Registers and Records compliant?

Risk Assessments and Method Statements

  • All operatives signed up to the current RAMS?

  • Are the RAMS within the review date?

  • Risk Assessments and Method Statements compliant?

Scaffolding/Working platforms

  • Check that double guard rails and toe boards or other suitable protection at every edge.

  • Check that there are additional brick guards provided to prevent materials falling from scaffold where they are used as a working platform.

  • Check that working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping - i.e.: no overlapping boards.

  • Do all ladder accesses have self closing gates fitted?

  • Ensure that a competent person inspects the scaffold regularly, at least once a week; and always after it has been altered, damaged and following extreme weather.

  • Are scaffold tags being utilised?

  • Are all scaffolds and working platforms sutable?

Storage of Substances, Chemicals and Oils.

  • Are substances, chemicals and oils stored in the correct manner?

  • Are all bowsers locked?

  • Is there double bundled storage with at least 110%?

  • Drip trays in use for petrol saws on site

  • Are oil storage tanks at least 30m from any water course?

  • Is static plant fitted with drip trays?

  • Is plant and equipment in good order and free from leaks etc?

  • Storage of Substances, Chemicals And Oils compliant?

Working at Height

  • Check that access equipment is erected by competent persons and checked before use.

  • Ensure safe access and egress have been provided to areas.

  • Ensure that edge protection is provided to stop people or materials falling.

  • Ladders - Ladders should be used at an angle of 1:4 (75 degrees).

  • Ensure that ladders are in good condition, are not split, warped or have damaged rungs etc.

  • Check whether ladders are suitable for the purpose - only for short term work or for gaining access to another area.

  • Check that ladders are secured to prevent them slipping sideways or backwards.

  • Check that ladders rise a sufficient height above their landing place (approx. 1m or 5 rungs).

  • Safe landing platforms to be provided where a ladder rises to a height of 9m or more.

  • Are work at height operation in accordance with the W@H Regulations?

Other

  • Any issues raised by the site team

Summary

  • undefined

Audit Risk Level

  • Risk rating for this Audit.

Closure

  • All actions on this report have been completed on:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.