Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Front panel operation.
-
Check operation of main isolating switch
-
Check operation of all lamps.
-
Check operation of start and stop buttons
-
Check operation of the emergency stop button.
-
Check the display is functional.
-
Check the keypad on the display is functional
External Inspection
-
Wash down the outside of the unit.
-
Inspect door locks.
-
Inspect unit for chipped or cracked paint.
Internal Inspection
-
Inspection of Perspex cover shields are in place
-
Inspection of internal components for damage. Clean all control boards surfaces.
-
Inspect AC modules and transformer for temperature reading
-
Inspect and clean filters
-
Inspection of door seals, front, back and sides.
GPU Lead Plugtop and Protection
-
Inspection of the lead for wear.
-
Inspection of the plug top for wear.
-
Inspection of the Spiral guard for damage
-
Perform pin pressure tests on plug top for correct pressures
Megawatt and hour readings
-
MWH
-
HRS
Corrective Actions
Sign off.
-
Add signature