Title Page
-
Customer / Site Name
-
Type and Quantity of Units
-
GE Supplied BOP:
-
GE/GSI Headcount:
-
Project and Site Managers:
-
Lead Mechanical and Lead Controls TAs
-
Prepared by
-
Conducted on
Environmental, Health & Safety (EHS)
Project Services EHS Management Plan Version 3.0 or Short Duration Audit Plan
-
Check to start this section
-
Required Tabs completed?
-
Comments
-
Required EHS Documents Posted?
-
Comments
Weekly Site Safety Inspection Report
-
Check to start this section
-
Accurately reflects site conditions
-
Comments
-
Issues quickly corrected by customer
-
Comments
-
Who conducts the inspection?
Safety Observations Submitted
-
Check to start this section
-
How Many?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 20 Plus
-
Coordinate with EHS Manager for recognition.
-
Identify which employees have submitted Safety Observations?
-
Add employee whom submitted Safety Observation by clicking Add Ee who submitted SORC button for each employee.
Ee who submitted SORC
-
Employee Name:
-
Knows link for Granite Safety Concern Cards? <br>
PPE (Safety Kit)
-
Check to start this section
-
Kit on site
-
Comments:
-
Adequate contents for site
-
Comments:
Audit II
Tool Box Topics and Attendance Roster
-
Check to start this section
-
List of topics available
-
Comments
-
Attendance rosters on file
-
Comments
-
How often are Tool Box Talks Conducted? (Expectation is one per day) <br>
Lock Out Tag Out (LOTO)
-
Check to start this section
-
Is GE/ Granite responsible for LOTO?
-
Comments:
-
Does the Site LOTO Program comply?
-
Comments:
-
Is there a pre-commissioning Lock Out program?
-
Comments:
-
Is the AERO LOTO Guide utilized?
-
Comments:
Permits (Work, Hot Work, Energization, etc.)
-
Check to start this section
-
Who controls the Work Permits?
-
Are personnel signing on?
-
Comments:
Safety Task Assignment (STA) / Job Safety Analysis (JSA) / Point of Work Risk Assessment (POWRA)
-
Check to start this section
-
Forms initiate, reviewed, updated daily?
-
Comments:
-
Completed forms filed?
-
Comments:
-
Are all activities covered?
-
Comments:
Audit III
REPORTING
Daily and Weekly Reports
-
Check to start this section
-
Reports up to date?
-
Comments:
-
Accurately reflect (site work, weather, issues, etc.)
-
Comments:
PROCEDURES
I&C Manual
-
Check to start this section
-
Up to date?
-
Comments:
-
Front Matter complete?
-
Comments:
-
Tailored (site specific)?
-
Comments:
-
Punch List process?
-
Comments:
-
PSOR process
-
Comments:
-
Signature log?
-
Comments:
Red Line Drawings?
-
Check to start this section
-
Master Drawing set maintained
-
Comments:
-
Complete Set per package
-
Comments:
-
Red Line process understood <br>
-
Comments:
Tech Tool
-
Check to start this section
-
Up to date
-
Comments:
-
Tailored to site
-
Comments:
-
SB’s, PB’s completed
-
Comments:
-
Storage and Preservations
-
Comments:
Audit IV
ServiceNow (PAC)
-
Check to start this section
-
All required “For Information Only” submitted
-
Comments:
-
Any critical cases not resolved
-
Comments:
AE Sample Analysis Tool
-
Check to start this section
-
Understands and uses sample analysis tool <br>
-
Comments:
-
Able to log into sample analysis tool
-
Comments:
-
knows to utilize for alignment verifications
-
Comments:
Cost of Quality (COQ)
-
Check to start this section
-
CoQ training completed
-
Comments:
-
CoQ process understood
-
Comments:
-
COQ issues submitted correctly
-
Comments:
Time and Material/Extra-work
-
Check to start this section
-
CoQ training completed
-
Comments:
-
CoQ process understood
-
Comments:
-
COQ issues submitted correctly
-
Comments:
-
What are the site procedures?
-
Are all requests/approvals logged?
-
Comments:
Audit V
OSD&D
-
Check to start this section
-
Process understood?
-
Comments:
-
OSD&D claims populated to CoQ
-
Comments:
iProcurement
-
Check to start this section
-
I-procurement training completed?
-
Comments:
-
Process understood?
-
Comments:
FME
-
Check to start this section
-
Site Specific Control Plans
-
Comments:
-
Required Signage Posted?
-
Comments:
-
Files up to date?
-
Comments:
-
Completed Control Plans submitted with Weekly Report?
-
Comments:
O&M Manuals
-
Check to start this section
-
Hard copy available
-
Comments:
-
able to utilize hard copy?
-
Comments:
Audit VI
I&C Site Specific Schedule
-
Check to start this section
-
Who tracks the site schedule?
-
Are we attending scheduling meetings? <br>
-
Comments:
Package Signage/Placards/Data Plates
-
Check to start this section
-
All required signage in place <br>
-
Comments:
Material Storage, Lay down, Inventory
-
Check to start this section
-
All equipment inventoried?
-
Comments:
-
Correctly stored?
-
Comments:
-
Ship Short items identified and ordered?
-
Comments:
Tooling: Commissioning, TA’s Tools
-
Check to start this section
-
Required tooling on site
-
Comments:
-
Calibrations up to date (through I&C Period)
-
Comments:
Tooling Turnover to customer procedure
-
Check to start this section
-
All tooling identified
-
Comments:
-
Customer receipt signature
-
Comments:
Audit VII
CUSTOMERS ELECTRICAL SYSTEMS INTERFACE
Electrical Systems Interface
-
Check to start this section
-
PP #78 (Full Load Rejection Test)
-
Comments: (* For Information only)
-
Drawing xxx964 (Generator Protective Relay Settings)
-
Comments: (* Submitted to GE for review and comment)
-
Display Meter, Digital Multifunction (DMMF) Settings
-
Comments: ( * Is the customer connected directly to the DMMF?)
-
Integrated Generator Protection System (IGPS) Settings
-
Comments: (*Who is setting and Testing the IGPS?)
-
Power System Stabilizer (PSS) Settings
-
Comments: (*Is the Customer utilizing the PSS Function?)
-
PE & IE Ground
-
Comments: (*PE and IE Ground Systems installed correctly?)
-
Customer DCS
-
Comments: (*Are there interface issues?)
Jumper Log
-
Check to start this section
-
Is a Control System "Jumper" Log in use?
-
Comments:
CUSTOMERS MECHANICAL SYSTEMS INTERFACE
-
Check to start this section
-
Is a Mechanical System "Blinds " Log in use?
-
Comments:
Audit VIII
System Flushes
-
Check to start this section
-
Oil Flushes Complete?
-
Comments:
-
Fuel Flushes Complete
-
Comments:
-
Cooling System Flush Complete
-
Comments:
-
Demin Water System Flush Complete
-
Comments:
-
Instrument Air System Blows Complete
-
Comments:
-
Lab Samples Submitted:
-
Comments:
-
Results on file
-
Comments:
-
Which Lab was used?
SITE MEETINGS
Participation in Customer’s Site Meetings
-
Check to start this section
-
Who attends meetings?
-
Site Safety
-
Comments:
-
Customer
-
Comments:
-
Contractors/Sub-contractors
-
Comments:
-
LOTO/Permit Manager
-
Comments:
Site Specific Contract Requirements
-
Check to start this section
-
Lift Plans
-
Comments:
-
Adequate office space, supplies, internet, restrooms
-
Comments:
Audit IX
COMPETENCY MODEL TRAINING, USAGE, AND UPDATES
Utilizing the Competency Model
-
Check to start this section
-
Comments:
Media
-
Check to start this section
-
Take a photo, or upload one from your device. Once you are done, tap on the image, tap "View", and tap "Annotate" to start editing. (Multiple photos can be added)
EHS Comments:
-
Check to start this section
-
Comments:
Reporting Comments:
-
Check to start this section
-
Comments:
Procedure Comments:
-
Check to start this section
-
Comments:
CUSTOMERS ELECTRICAL AND MECHANICAL INTERFACE COMMENTS:
-
Check to start this section
-
Comments:
SITE MEETING COMMENTS
-
Check to start this section
-
Comments:
Competency Model Comments
-
Check to start this section
-
Comments:
Audit Sign Off
-
Check to start this section
-
Typed Name and Signature of Auditor