Title Page

  • Customer / Site Name

  • Type and Quantity of Units

  • GE Supplied BOP:

  • GE/GSI Headcount:

  • Project and Site Managers:

  • Lead Mechanical and Lead Controls TAs

  • Prepared by

  • Conducted on

Environmental, Health & Safety (EHS)

Project Services EHS Management Plan Version 3.0 or Short Duration Audit Plan

  • Check to start this section

  • OUTAGE PLAN FORM LIST.png
  • Required Tabs completed?

  • Comments

  • federal.jpg
  • Required EHS Documents Posted?

  • Comments

Weekly Site Safety Inspection Report

  • Check to start this section

  • Accurately reflects site conditions

  • Comments

  • Issues quickly corrected by customer

  • Comments

  • Who conducts the inspection?

Safety Observations Submitted

  • Check to start this section

  • How Many?

  • Coordinate with EHS Manager for recognition.

  • Identify which employees have submitted Safety Observations?

  • Add employee whom submitted Safety Observation by clicking Add Ee who submitted SORC button for each employee.

  • Ee who submitted SORC
  • Employee Name:

  • # of SORCs submitted

  • SORC.jpg
  • Knows link for Granite Safety Concern Cards? <br>

PPE (Safety Kit)

  • Check to start this section

  • Kit on site

  • Comments:

  • Adequate contents for site

  • Comments:

Audit II

Tool Box Topics and Attendance Roster

  • no label
  • Check to start this section

  • List of topics available

  • Comments

  • Attendance rosters on file

  • Comments

  • How often are Tool Box Talks Conducted? (Expectation is one per day) <br>

Lock Out Tag Out (LOTO)

  • Check to start this section

  • Is GE/ Granite responsible for LOTO?

  • Comments:

  • Does the Site LOTO Program comply?

  • Comments:

  • Is there a pre-commissioning Lock Out program?

  • Comments:

  • Is the AERO LOTO Guide utilized?

  • Comments:

Permits (Work, Hot Work, Energization, etc.)

  • Check to start this section

  • Who controls the Work Permits?

  • Are personnel signing on?

  • Comments:

Safety Task Assignment (STA) / Job Safety Analysis (JSA) / Point of Work Risk Assessment (POWRA)

  • Check to start this section

  • Forms initiate, reviewed, updated daily?

  • Comments:

  • Completed forms filed?

  • Comments:

  • Are all activities covered?

  • Comments:

Audit III

REPORTING

Daily and Weekly Reports

  • Check to start this section

  • Reports up to date?

  • Comments:

  • Accurately reflect (site work, weather, issues, etc.)

  • Comments:

PROCEDURES

I&C Manual

  • Check to start this section

  • Up to date?

  • Comments:

  • Front Matter complete?

  • Comments:

  • Tailored (site specific)?

  • Comments:

  • Punch List process?

  • Comments:

  • PSOR process

  • Comments:

  • Signature log?

  • Comments:

Red Line Drawings?

  • Check to start this section

  • Master Drawing set maintained

  • Comments:

  • Complete Set per package

  • Comments:

  • Red Line process understood <br>

  • Comments:

Tech Tool

  • Check to start this section

  • Up to date

  • Comments:

  • Tailored to site

  • Comments:

  • SB’s, PB’s completed

  • Comments:

  • Storage and Preservations

  • Comments:

Audit IV

ServiceNow (PAC)

  • Check to start this section

  • All required “For Information Only” submitted

  • Comments:

  • Any critical cases not resolved

  • Comments:

AE Sample Analysis Tool

  • Check to start this section

  • Understands and uses sample analysis tool <br>

  • Comments:

  • Able to log into sample analysis tool

  • Comments:

  • knows to utilize for alignment verifications

  • Comments:

Cost of Quality (COQ)

  • Check to start this section

  • CoQ training completed

  • Comments:

  • CoQ process understood

  • Comments:

  • COQ issues submitted correctly

  • Comments:

Time and Material/Extra-work

  • Check to start this section

  • CoQ training completed

  • Comments:

  • CoQ process understood

  • Comments:

  • COQ issues submitted correctly

  • Comments:

  • What are the site procedures?

  • Are all requests/approvals logged?

  • Comments:

Audit V

OSD&D

  • Check to start this section

  • Process understood?

  • Comments:

  • OSD&D claims populated to CoQ

  • Comments:

iProcurement

  • Check to start this section

  • I-procurement training completed?

  • Comments:

  • Process understood?

  • Comments:

FME

  • Check to start this section

  • Site Specific Control Plans

  • Comments:

  • Required Signage Posted?

  • Comments:

  • Files up to date?

  • Comments:

  • Completed Control Plans submitted with Weekly Report?

  • Comments:

O&M Manuals

  • Check to start this section

  • Hard copy available

  • Comments:

  • able to utilize hard copy?

  • Comments:

Audit VI

I&C Site Specific Schedule

  • Check to start this section

  • Who tracks the site schedule?

  • Are we attending scheduling meetings? <br>

  • Comments:

Package Signage/Placards/Data Plates

  • Check to start this section

  • All required signage in place <br>

  • Comments:

Material Storage, Lay down, Inventory

  • Check to start this section

  • All equipment inventoried?

  • Comments:

  • Correctly stored?

  • Comments:

  • Ship Short items identified and ordered?

  • Comments:

Tooling: Commissioning, TA’s Tools

  • Check to start this section

  • Required tooling on site

  • Comments:

  • Calibrations up to date (through I&C Period)

  • Comments:

Tooling Turnover to customer procedure

  • Check to start this section

  • All tooling identified

  • Comments:

  • Customer receipt signature

  • Comments:

Audit VII

CUSTOMERS ELECTRICAL SYSTEMS INTERFACE

Electrical Systems Interface

  • Check to start this section

  • PP #78 (Full Load Rejection Test)

  • Comments: (* For Information only)

  • Drawing xxx964 (Generator Protective Relay Settings)

  • Comments: (* Submitted to GE for review and comment)

  • Display Meter, Digital Multifunction (DMMF) Settings

  • Comments: ( * Is the customer connected directly to the DMMF?)

  • Integrated Generator Protection System (IGPS) Settings

  • Comments: (*Who is setting and Testing the IGPS?)

  • Power System Stabilizer (PSS) Settings

  • Comments: (*Is the Customer utilizing the PSS Function?)

  • PE & IE Ground

  • Comments: (*PE and IE Ground Systems installed correctly?)

  • Customer DCS

  • Comments: (*Are there interface issues?)

Jumper Log

  • Check to start this section

  • Is a Control System "Jumper" Log in use?

  • Comments:

CUSTOMERS MECHANICAL SYSTEMS INTERFACE

  • Check to start this section

  • Is a Mechanical System "Blinds " Log in use?

  • Comments:

Audit VIII

System Flushes

  • Check to start this section

  • Oil Flushes Complete?

  • Comments:

  • Fuel Flushes Complete

  • Comments:

  • Cooling System Flush Complete

  • Comments:

  • Demin Water System Flush Complete

  • Comments:

  • Instrument Air System Blows Complete

  • Comments:

  • Lab Samples Submitted:

  • Comments:

  • Results on file

  • Comments:

  • Which Lab was used?

SITE MEETINGS

Participation in Customer’s Site Meetings

  • Check to start this section

  • Who attends meetings?

  • Site Safety

  • Comments:

  • Customer

  • Comments:

  • Contractors/Sub-contractors

  • Comments:

  • LOTO/Permit Manager

  • Comments:

Site Specific Contract Requirements

  • Check to start this section

  • Lift Plans

  • Comments:

  • Adequate office space, supplies, internet, restrooms

  • Comments:

Audit IX

COMPETENCY MODEL TRAINING, USAGE, AND UPDATES

Utilizing the Competency Model

  • Check to start this section

  • Comments:

Media

  • Check to start this section

  • Take a photo, or upload one from your device. Once you are done, tap on the image, tap "View", and tap "Annotate" to start editing. (Multiple photos can be added)

EHS Comments:

  • Check to start this section

  • Comments:

Reporting Comments:

  • Check to start this section

  • Comments:

Procedure Comments:

  • Check to start this section

  • Comments:

CUSTOMERS ELECTRICAL AND MECHANICAL INTERFACE COMMENTS:

  • Check to start this section

  • Comments:

SITE MEETING COMMENTS

  • Check to start this section

  • Comments:

Competency Model Comments

  • Check to start this section

  • Comments:

Audit Sign Off

  • Check to start this section

  • Typed Name and Signature of Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.