Information
-
Risk Scope:
A multiple fatality resulting from exposure to fly rock & fumes or the unplanned detonation of explosive material due to unexpected friction, impact or heat -
Critical Control Objective:
To prevent multiple fatality from fly rock & fume during planned detonation of explosive material or unplanned detonation of explosive material due to unexpected friction, impact or heat leading to a multiple fatality -
Control Design Standard: A design process & model has been undertaken to initially establish the minimum exclusion zones.
-
Conducted on
-
Conducted by
-
Crew
-
Location
-
SAP Work Order Number
Control Operating Requirement #1
-
Control Operating Requirements: Modelling and simulation work has been carried out to determine standard minimum zones for blasting activities
-
1.1 Verify that modelling & simulation work exists that details minimum exclusion zones for blasting activities
-
Comments
-
Attach relevant files/photo's as supporting evidence
Control Operating Requirement #2
-
Control Operating Requirements: Exclusion zone designs for people to include;
1. 600m for burden shots
2. 300m for coal shots
3. Include a fume management zone -
2.1 Does a design exist for flyrock exclusion zones?
-
2.2 Does a design exist for fume management zones?
-
Comments
-
Attach relevant files/photo's as supporting evidence
Control Operating Requirement #3
-
Control Operating Requirements: Exclusion zone designs for guard placement outside of the following distances;
1. 600m for burden shots
2. 300m for coal shots
3. Include a fume management zone -
3.1 Are guards placed as per design?
-
3.2 Does guard placement prevent all access to the exclusion zones?
-
Comments
-
Add media
Control Operating Requirement #4
-
Control Operating Requirements: Exclusion zone designs for people to include;
1. 600m for burden shots
2. 300m for coal shots
3. Include a fume management zone -
4.1 Were all personnel removed from the area via exclusion zones/evacuation?
-
Comments
-
Attach relevant files/photo's as supporting evidence
Control Operating Requirement #5
-
Control Operating Requirements: Exclusion zone designs for people to include;
1. 600m for burden shots
2. 300m for coal shots
3. Include a fume management zone -
Lightning
-
5.1 Does lightning detection exist?
-
5.2 Is lightning protection functional?
-
Review the Pit Control Electrical Storm Evacuation Records for previous electrical storms.
-
5.3 Were exclusion zones in place?
-
5.4 Were pits evacuated?
-
Comments
-
Attach relevant files/photo's as supporting evidence
Control Operating Requirement #6
-
Control Operating Requirements: All personnel are outside of the following exclusion zone distances during initiation of misfire blasts;
1. 600m for burden shots
2. 300m for coal shots
3. Include a fume management zone -
Review Misfire Reports & Risk Assessments - Were exclusion zones established?
-
Were designed exclusion zones enforced for Misfire treatment?
-
Comments
-
Attach relevant files/photo's as supporting evidence
Summary
-
Is GRM overall compliant to the Explosives Detonation - Fit for Purpose Vehicles Critical Controls?
-
Additional Comments