Information
-
Risk Scope:
A multiple fatality resulting from exposure to fly rock & fumes or the unplanned detonation of explosive material due to unexpected friction, impact or heat -
Critical Control Objective:
To prevent multiple fatality from fly rock & fume during planned detonation of explosive material or unplanned detonation of explosive material due to unexpected friction, impact or heat leading to a multiple fatality -
Conducted on
-
Conducted by
-
Crew
-
Location
-
SAP Work Order Number
Control Operating Requirement #1
-
Control Design Standard: Separation of explosives, down hole accessories & bulk explosives.
-
Control Operating Requirements: Segregate explosives & accessories until charging the hole.
-
1.1 Attend a shot. Were accessories and explosives segregated until charging the hole?
-
Comments
-
Attach relevant files/photo's as supporting evidence
Control Operating Requirement #2
-
Control Design Standard: Bench demarcation / protection
-
Control Operating Requirements: Loading bench is physically separated from other activities with bunds or physical barriers preventing inadvertent access by people and equipment not authorised to be on the loading bench
-
2.1 Attend a shot. Have benches been demarcated / protected to prevent inadvertent access by individuals?
-
Comments
-
Attach relevant files/photo's as supporting evidence
Summary
-
Is GRM overall compliant to the Explosives Detonation - Separation Critical Controls?
-
Additional Comments