Start
-
Conducted on
-
Location
-
Activity:
-
Lead Auditor:
Details
Participants:
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
Key Findings
Key Findings:
Mobile Plant & Sign Off
Mobile Plant:
-
a) Daily inspection checklist completed by operator.
-
b) Faults corrected immediately.
-
c) Operator competencies verified.
-
d) Safety devices fitted - seat belts, fire extinguishers, reverse beeper, machine guards, beacons.
-
e) Safe working loads marked.
-
f) LV / HV Separation adequate.
-
g) Plant compliance (inspection sticker).
Sign Off:
-
Add signature
-
Add signature
AUDIT # 2 - Satisfactory(SAT), Unsatisfactory(U/N) and Not Applicable (N/A)
Manual Handling
-
a) Exposure to overexertion.
-
b) Workplace layout.
-
c) Repetitive tasks/job rotation.
-
d) Mechanical aids being utilised.
-
e) Hydration/solar radiation
-
f) Incorrect posture.
-
g) Deliberate incorrect lifting techniques.
Access / Egress:
-
a) Ladders secured, 1-4 metre lean, project 1 metre above platform.
-
b) Clear access/egress points.
-
c) Handrails installed ie. ramps, stairs.
-
d) Sharp edges covered on walkways.
-
e) Roads unobstructed.
-
f) Permits in place.