Start
-
Conducted on
-
Location
-
Activity:
-
Lead Auditor:
Details
Participants:
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
-
Name:
-
Company:
- Redpath
- ASD
- BGC
- Hutchinson
- McNab
- Mainteck
- Lend Lease
- General
- Misc
- N/A
Key Findings
Key Findings:
AUDIT # 4 - Satisfactory(SAT), Unsatisfactory(U/N) and Not Applicable (N/A)
Lifting Equipment:
-
a) All lifting equipment recorded on register.
-
b) Safe working loads marked on gear.
-
c) Tag lines used as required (16mm fibre rope).
-
d) Gear inspected regular/good condition.
-
e) Adequate storage facility (off ground level).
-
f) Soft slings protected.
-
g) All lifting gear test and tag in date (RGBY)
Lifting Operations:
-
a) Drop zones in place.
-
b) Lift plans in place.
-
c) Clear of unnecessary personnel.
-
d) Meets site compliance requirements.
-
e) Outriggers fully extended on timber support with no oil leaks.
-
f) Adequate ground support/level surface clear of excavations.
-
g) Daily checklist completed/safety devices checked.
-
h) Crane operator/riggers communication methods clear.
Scaffolding & Sign Off
Scaffolding:
-
a) Register up to date.
-
b) Hand/mid rails, toe boards fitted.
-
c) Adequate access (maximum of 4 metres).
-
d) Secured - vertically and horizontally.
-
e) All platforms fully planked.
-
f) Scafftag fitted at all access points and legible.
-
g) Correct stacking and storing of scaffolding.
Sign Off:
-
Add signature
-
Add signature