Information

  • Document No.

  • Audit Title

Executive Summary

Executive Summary

  • Audit summary

General

  • Time

  • Inspection Type

  • Specific Location/s

  • Attendees

Processes

Engineering Drawings

  • Engineering Drawing Review and Approval

  • Engineering Drawing
  • Drawing Number

  • Revision

  • Status

  • Distribution correct?

  • Notes

Field Engineering Drawings

  • Field Engineering Drawing Review and Approval

  • Field Engineering Drawing
  • Drawing Number

  • Revision

  • References correct?

  • Distribution correct?

  • Notes

Vendor Data

  • Vendor Name

  • Vendor
  • Vendor

  • Vendor document or drawing

  • Document / Drawing
  • Document / Drawing number

  • Revision

  • Status

  • Is distribution correct?

  • Is the contractor portal being used correctly?

  • Notes

Technical Queries

  • Was the TQ received via the contractor portal?

  • Was the response sent back via the portal?

  • Is the TQ closed?

Site Instructions

  • Was the site instruction issued to the contractor via the portal?

  • Is the SI referenced to a TQ?

Non Conformance Reports

  • Was the NCR received via the contractor portal?

  • Has the corrective action been reviewed and returned via the portal?,

  • After conclusion of corrective action, has the NCR been closed and returned to the contractor?

General Project Documents

Auditor

  • Auditor Name

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.