Title Page
-
Conducted on
-
Prepared by
-
Location
-
Contractor
-
Submitted to:
Handhole Checklist
Check parameters
-
Handhole size is as per standard
-
Severity Level
-
Inner walls are free of damage
-
Severity Level
-
Handholes are dry and clean
-
Inlet holes are sealed properly
-
Standard Z-Clamps are provided in HH (2-3/loop)
-
OF cable loop is provided in HH
-
HH cover size as per specs
-
NAP is installed on Z-Clamp
FDH Checklist
-
FDH is installed at 3 metera away from power transformer
-
FDH cabinet base is not tilted/not damaged or loose fitted
-
FDH Base is of standard dimensions and installed as per guidelines
-
FHD inlet hole sealing is done properly.
-
FDH cage is installed and Locks are provided.
-
Sufficient specs available at front and back of FDH cabinet for easy access and operation/maintenance works.
Closing Comments
-
Filled by:
-
Observation/closing remarks:
-
Auditor signature