Title Page

  • Conducted on

  • Prepared by

  • Location
  • Contractor

  • Submitted to:

Handhole Checklist

Check parameters

  • Handhole size is as per standard

  • Severity Level

  • Inner walls are free of damage

  • Severity Level

  • Handholes are dry and clean

  • Inlet holes are sealed properly

  • Standard Z-Clamps are provided in HH (2-3/loop)

  • OF cable loop is provided in HH

  • HH cover size as per specs

  • NAP is installed on Z-Clamp

FDH Checklist

  • FDH is installed at 3 metera away from power transformer

  • FDH cabinet base is not tilted/not damaged or loose fitted

  • FDH Base is of standard dimensions and installed as per guidelines

  • FHD inlet hole sealing is done properly.

  • FDH cage is installed and Locks are provided.

  • Sufficient specs available at front and back of FDH cabinet for easy access and operation/maintenance works.

Closing Comments

  • Filled by:

  • Observation/closing remarks:

  • Auditor signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.