Information
-
Site:
-
Document No:
-
Conducted on:
-
Prepared by:
-
Location:
-
Site Manager:
Previous Audit Report:
-
Has the previous audit report been closed out?
-
Observations from previous report not addressed:
1. Local Environment:
-
Weather conditions on site:
- Clear Sky
- Cloudy
- Raining
- Windy
- Hazy
- Snow /Hail
- Other
-
Road Condition outside site perimeter:
-
Road Conditions on site within occupied areas:
-
Road conditions within live section of the site:
-
Water courses:
2. Site set up:
-
Welfare Facilities:
- Compliant
- Minor Attention Required
- Maintenance Required
- Cleaning Required
- Non-Compliant
- N/A
-
Compound/Material storage arrangements:
3. Training, inductions & Toolbox Talks:
-
Training:
-
Inductions:
-
Toolbox Talks (Monthly):
4. Incident Reporting, Emergency Procedures. E.G. Fire / First Aid:
-
Have any Accidents/Incidents occurred since the last inspection?
-
Have any Dangerous Occurrences Occurred since the last inspection?
-
Have all Accidents/Incidents/Dangerous Occurrences been reported & logged:
-
Have any Near Misses been recorded, since the last Inspection?
-
Fire Monitoring / Warning Alarms / Equipment:
-
First Aid Provisions / Personnel:
5. Construction Phase Health, Safety & Environmental Plan (CPHSEP):
-
CPHSEP in place & up to date
6. Risk Assessments & Method Statements (RAMS):
-
RAMS on site for current works & briefings signed:
-
Have all RAMS been H&S Approved for this site?
- Yes
- No (But Trade not on site as yet)
- No (Trade on site)
7. Permits to Work:
-
Hot works Permit:
-
Permit to Dig
8. Management Controls & Inspections:
-
Information boards / Health & Safety Notice Board:
-
Inspection Records:
9. Environmental Controls (Emergencies, Waste Etc.):
-
Noise (db(A) level at site boundary), Dust, Waste:
-
Spill Kit, Gully Bags, Tree/Hedge/MG5 Grasslands Protection:
-
Protected species:
10. Site Security & Protection of the Public:
-
Perimeter Fencing / Signage:
-
Public areas free of known construction related hazards:
11. Traffic Management / Access & egress:
-
Pedestrian / Vehicle segregation:
-
Access / Egress (Welfare, Car Park, Work Areas):
-
Chapter 8 compliance:
12. PPE & RPE:
-
Worn as site rules & task specific RAMS:
13. COSHH:
-
Substances, Chemicals, Fuels, Oils & Gases:
14. Occupational Health (HAV's, Noise, Etc):
-
Noise / Hazardous Dust / Health Surveillance:
15. Manual Handling:
-
MAC / Controls / Eliminated / Further Assessments:
16. Housekeeping:
-
Combustible Materials cleaned up as works proceed / Access points kept clear / General Site Presentation:
17. Lifting Operations/Equipment:
-
Lifting plans / Lift activities / Material Weight guides / Testing of equipment / LOLER compliance:
18. Plant & Equipment:
-
In good visual order / Used safely & Correctly:
19. Excavations/Earthworks:
-
Barriers / Safe access & egress / Trench supports:
20. Demolition Operations:
-
Applicable to this project at this stage?
-
Demolition plan:
-
Asbestos / Hazardous materials surveys:
-
Temporary works: Scaffolds, towers, supports, fans, debris nets:
-
Dust levels suppressed:
21. Electricity:
-
Overhead cables: Goal posts / Signage / No go zones:
-
Electrical Conformity Testing / Portable Appliance Testing (PAT) in date?
- In Date
- Testing Required this month, but currently within date
- Required Now, as out of date
- N/A
22. Confined Spaces:
-
Applicable to this project at this stage?
-
Competent personnel available for task:
-
Air Monitoring equipment in place & working correctly:
-
Works carried out as approved RAMS:
23. Work at Height:
-
Scaffold:
-
Openings & Voids:
-
Mobile Towers:
-
Ladders / Stepladders / Hop-ups:
24. Sales/Show house:
-
Are sales on site at this stage?
-
Access & Egress (in & around sales area):
-
Fire Extinguishers / First Aid Provisions:
-
Signage (Insurance / H&S Law Poster, Etc.) in place & displayed:
-
Display Screen Equipment (DSE):
-
Lone Working (People Safe around neck of individual & operational):
Sign Off:
-
I Confirm that the contents of this inspection report have been explained to the Site Manager
-
Auditor:
Report Closure:
Closure of report:
-
The below items highlighted as flagged within this report, have been closed out as follows:
- No Non Conformities raised on this Inspection
- Action Required (as sections highlighted below)
-
Sec 1:
-
Sec 2:
-
Sec 3:
-
Sec 4:
-
Sec 5:
-
Sec 6:
-
Sec 7:
-
Sec 8:
-
Sec 9:
-
Sec 10:
-
Sec 11:
-
Sec 12:
-
Sec 13:
-
Sec 14:
-
Sec 15:
-
Sec 16:
-
Sec 17:
-
Sec 18:
-
Sec 19:
-
Sec 20:
-
Sec 21:
-
Sec 22:
-
Sec 23:
-
Sec 24:
-
Site Manager to Print, Sign & Date, to close out the flagged items, within this report:
-
Print: Sign: Date: