Information

  • Site:

  • Document No:

  • Conducted on:

  • Prepared by:

  • Location:

  • Site Manager:

Previous Audit Report:

  • Has the previous audit report been closed out?

  • Observations from previous report not addressed:

1. Local Environment:

  • Weather conditions on site:

  • Road Condition outside site perimeter:

  • Road Conditions on site within occupied areas:

  • Road conditions within live section of the site:

  • Water courses:

2. Site set up:

  • Welfare Facilities:

  • Compound/Material storage arrangements:

3. Training, inductions & Toolbox Talks:

  • Training:

  • Inductions:

  • Toolbox Talks (Monthly):

4. Incident Reporting, Emergency Procedures. E.G. Fire / First Aid:

  • Have any Accidents/Incidents occurred since the last inspection?

  • Have any Dangerous Occurrences Occurred since the last inspection?

  • Have all Accidents/Incidents/Dangerous Occurrences been reported & logged:

  • Have any Near Misses been recorded, since the last Inspection?

  • Fire Monitoring / Warning Alarms / Equipment:

  • First Aid Provisions / Personnel:

5. Construction Phase Health, Safety & Environmental Plan (CPHSEP):

  • CPHSEP in place & up to date

6. Risk Assessments & Method Statements (RAMS):

  • RAMS on site for current works & briefings signed:

  • Have all RAMS been H&S Approved for this site?

7. Permits to Work:

  • Hot works Permit:

  • Permit to Dig

8. Management Controls & Inspections:

  • Information boards / Health & Safety Notice Board:

  • Inspection Records:

9. Environmental Controls (Emergencies, Waste Etc.):

  • Noise (db(A) level at site boundary), Dust, Waste:

  • Spill Kit, Gully Bags, Tree/Hedge/MG5 Grasslands Protection:

  • Protected species:

10. Site Security & Protection of the Public:

  • Perimeter Fencing / Signage:

  • Public areas free of known construction related hazards:

11. Traffic Management / Access & egress:

  • Pedestrian / Vehicle segregation:

  • Access / Egress (Welfare, Car Park, Work Areas):

  • Chapter 8 compliance:

12. PPE & RPE:

  • Worn as site rules & task specific RAMS:

13. COSHH:

  • Substances, Chemicals, Fuels, Oils & Gases:

14. Occupational Health (HAV's, Noise, Etc):

  • Noise / Hazardous Dust / Health Surveillance:

15. Manual Handling:

  • MAC / Controls / Eliminated / Further Assessments:

16. Housekeeping:

  • Combustible Materials cleaned up as works proceed / Access points kept clear / General Site Presentation:

17. Lifting Operations/Equipment:

  • Lifting plans / Lift activities / Material Weight guides / Testing of equipment / LOLER compliance:

18. Plant & Equipment:

  • In good visual order / Used safely & Correctly:

19. Excavations/Earthworks:

  • Barriers / Safe access & egress / Trench supports:

20. Demolition Operations:

  • Applicable to this project at this stage?

  • Demolition plan:

  • Asbestos / Hazardous materials surveys:

  • Temporary works: Scaffolds, towers, supports, fans, debris nets:

  • Dust levels suppressed:

21. Electricity:

  • Overhead cables: Goal posts / Signage / No go zones:

  • Electrical Conformity Testing / Portable Appliance Testing (PAT) in date?

22. Confined Spaces:

  • Applicable to this project at this stage?

  • Competent personnel available for task:

  • Air Monitoring equipment in place & working correctly:

  • Works carried out as approved RAMS:

23. Work at Height:

  • Scaffold:

  • Openings & Voids:

  • Mobile Towers:

  • Ladders / Stepladders / Hop-ups:

24. Sales/Show house:

  • Are sales on site at this stage?

  • Access & Egress (in & around sales area):

  • Fire Extinguishers / First Aid Provisions:

  • Signage (Insurance / H&S Law Poster, Etc.) in place & displayed:

  • Display Screen Equipment (DSE):

  • Lone Working (People Safe around neck of individual & operational):

Sign Off:

  • I Confirm that the contents of this inspection report have been explained to the Site Manager

  • Auditor:

Report Closure:

Closure of report:

  • The below items highlighted as flagged within this report, have been closed out as follows:

  • Sec 1:

  • Sec 2:

  • Sec 3:

  • Sec 4:

  • Sec 5:

  • Sec 6:

  • Sec 7:

  • Sec 8:

  • Sec 9:

  • Sec 10:

  • Sec 11:

  • Sec 12:

  • Sec 13:

  • Sec 14:

  • Sec 15:

  • Sec 16:

  • Sec 17:

  • Sec 18:

  • Sec 19:

  • Sec 20:

  • Sec 21:

  • Sec 22:

  • Sec 23:

  • Sec 24:

  • Site Manager to Print, Sign & Date, to close out the flagged items, within this report:

  • Print: Sign: Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.