Title Page
-
Conducted on
-
Prepared by
-
Location
Candidate Details
-
Candidate name
-
Candidate service number
-
Photo ID
Apply Circuit Main Earths PPE
-
Approved helmet
-
Approved protective eyewear
-
Arc resistant coveralls
-
Climbing boots
-
Harness checked and fitted correctly
-
Approved climbing and work position belts
-
Approved protective gloves
-
Approved fall arrest lanyard
-
HV gloves tested and checked before use
Insulator change
Risk Assessment
-
Risk assessment completed?
-
Evidence of risk assessment
-
HV gloves removed and work gloves worn?
-
Climb to correct work position and fall arrest lanyard installed.
-
Work position belt used?
-
Correct tools and equipment selected?
-
Completed insulator change?
-
Assessor comments
Remove CME
-
Did the candidate climb below the working and access clearance for the voltage being worked upon?
-
Caution notice removed?
-
HV Gloves worn prior to removal of CME?
-
CME Removed from all three phases?
-
Site left tidy and equipment tidied away?
-
Assessor comments
Install cut-out
-
correct tools and PPE selected for task
-
Cut-out secured to board,level and within the dimensions given.
Install single phase cut-out CNE cable
-
Service cable stripped to correct length
-
All terminations sufficiently tight
-
Was the neutral arranged neatly allowing the correct seating of the cut-out chamber
-
Service PME link installed
-
Grommets installed into bottom of cut-out chamber
-
Assessor comments
-
Photo of cut-out
Install Three phase cut-out SCNE
-
Cut-out level & secured to meter board<br>
-
Cable terminated in correct phase positions
-
Tape buffer installed at the crutch
-
Was the neutral arranged neatly allowing the correct seating of the cut-out chamber
-
All terminations sufficiently tight
-
Photo of cut-out
-
Service termination PME link not installed
-
Chamber grommets installed
-
Assessor Comments
LV testing (single phase cut-out termination PME
-
LV gloves checked and inflation test performed as per COP 684
-
Test lamps tested before use.
-
Non intrusive testing device (neutral ID pen) tested before use
-
Polarity confirmed using test lamps and non intrusive testing device (neutral ID pen).
-
Correct PPE selected<br>Eye protection arc resistent coveralls.
-
Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester
-
Earth loop impedance checked and results understood
-
Incorrect (crossed) polarity identified
-
Knowledge affirming questions answered correctly
-
Assessor comments
LV testing (single phase cut-out termination non PME
-
Test lamps tested before use.
-
Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester
-
Polarity confirmed using test lamps
-
Earth loop impedance checked and results understood
-
Incorrect (crossed) polarity identified
-
Knowledge affirming questions answered correctly
-
Assessor comments
LV testing three phase open point
-
Test lamps tested before use.
-
Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester
-
Three phases and neutral identified each side of the open point
-
Open point phased out
-
Each given fault identified
-
Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester
-
Assessor comments
-
Assessor signature
-
Candidate signature