Title Page

  • Conducted on

  • Prepared by

  • Location

Candidate Details

  • Candidate name

  • Candidate service number

  • Photo ID

Apply Circuit Main Earths PPE

  • Approved helmet

  • Approved protective eyewear

  • Arc resistant coveralls

  • Climbing boots

  • Harness checked and fitted correctly

  • Approved climbing and work position belts

  • Approved protective gloves

  • Approved fall arrest lanyard

  • HV gloves tested and checked before use

Insulator change

Risk Assessment

  • Risk assessment completed?

  • Evidence of risk assessment

  • HV gloves removed and work gloves worn?

  • Climb to correct work position and fall arrest lanyard installed.

  • Work position belt used?

  • Correct tools and equipment selected?

  • Completed insulator change?

  • Assessor comments

Remove CME

  • Did the candidate climb below the working and access clearance for the voltage being worked upon?

  • Caution notice removed?

  • HV Gloves worn prior to removal of CME?

  • CME Removed from all three phases?

  • Site left tidy and equipment tidied away?

  • Assessor comments

Install cut-out

  • correct tools and PPE selected for task

  • Cut-out secured to board,level and within the dimensions given.

Install single phase cut-out CNE cable

  • Service cable stripped to correct length

  • All terminations sufficiently tight

  • Was the neutral arranged neatly allowing the correct seating of the cut-out chamber

  • Service PME link installed

  • Grommets installed into bottom of cut-out chamber

  • Assessor comments

  • Photo of cut-out

Install Three phase cut-out SCNE

  • Cut-out level & secured to meter board<br>

  • Cable terminated in correct phase positions

  • Tape buffer installed at the crutch

  • Was the neutral arranged neatly allowing the correct seating of the cut-out chamber

  • All terminations sufficiently tight

  • Photo of cut-out

  • Service termination PME link not installed

  • Chamber grommets installed

  • Assessor Comments

LV testing (single phase cut-out termination PME

  • LV gloves checked and inflation test performed as per COP 684

  • Test lamps tested before use.

  • Non intrusive testing device (neutral ID pen) tested before use

  • Polarity confirmed using test lamps and non intrusive testing device (neutral ID pen).

  • Correct PPE selected<br>Eye protection arc resistent coveralls.

  • Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester

  • Earth loop impedance checked and results understood

  • Incorrect (crossed) polarity identified

  • Knowledge affirming questions answered correctly

  • Assessor comments

LV testing (single phase cut-out termination non PME

  • Test lamps tested before use.

  • Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester

  • Polarity confirmed using test lamps

  • Earth loop impedance checked and results understood

  • Incorrect (crossed) polarity identified

  • Knowledge affirming questions answered correctly

  • Assessor comments

LV testing three phase open point

  • Test lamps tested before use.

  • Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester

  • Three phases and neutral identified each side of the open point

  • Open point phased out

  • Each given fault identified

  • Each test completed with a positive indication (light)<br>Or confirmed with test lamp tester

  • Assessor comments

  • Assessor signature

  • Candidate signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.