Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
PPE
-
Hardhats worn by all personnel?
-
Hard hats inspected free of defects?
-
Proper foot wear worn by all personnel?
-
Eye protection worn by all personnel?
-
Hearing protection worn when necessary?
-
Proper breathing apparatus used when necessary?
-
Shirts worn at all times?
INDIVIDUAL SITE REQUIRMENTS
-
Site clearly marked with address and lot number?
-
Site clearly marked with C.A.Z.?
-
Drop zone clearly marked on two story homes?
-
Porches more than six feet above grade marked to limit access?
-
Fire extinguisher on site and readily available. Inspected monthly?
-
First aid kit on site and fully stocked?
-
Rebar and anchor bolts capped?
-
Site free of trip hazards?
-
Electric cords crossing streets protected by channel?
-
GFCI at temp pole provided and tested prior to each shift?
-
Competent person on site for each sub contractor/ Volunteer team?
-
Subcontractor framing crew Competent person identified? List names.
-
Copy of Habitat Wake Written Health and Safety Program on site?
POWER TOOLS
-
Instruction given to each Volunteer user on proper use of tool?
-
All power tools equipped with operable guards?
-
All power tools equipped with proper cords?
-
Powder actuated tools used by certified personnel?
LADDERS
-
Proper ladder length for task at hand?
-
Step ladders used in open and locked position?
-
Extension ladders set up properly?
-
Extension ladders extend 3 foot above landing point?
-
All ladders on job site free from defects?
-
Proper ladder climbing technique used
SCAFFOLDING
-
Masons scaffolding/ Pipe scaffolding in use?
-
Proper base, feet?
-
All required bracing in place?
-
Fully decked working / walking surface?
-
Like and kind parts?
-
Guard rails and end rails in place?
-
Scaffolding set proper distance from work surface?
-
Scaffolding set 10' from over head electrical lines?
-
Wall Walker in use?
-
Wall Walkers installed per manufacturers specs?
-
Access provided to working platform?
GUARD RAILS
-
Stairs set with guardrails prior to any work starting on second floor?
-
Bars on windows or door openings at 42" above floor area when more than 6' above lower level
FALL PROTECTION
-
Hazardous work area clearly marked at 6 ft. from leading edge?
-
PFAS used when no other form of fall protection is provided?
-
PFAS properly used?
-
PFAS inspected before use?
EXCAVATIONS
-
Ditch depth 5 ft. Or deeper sloped or sheilded?
-
Escape ladder less than 25 ft. From worker in ditch?
-
Spoils 2 ft. Or greater back from edge of ditch?
-
All trenches clearly marked as hazardous areas?
-
Utilities located prior to digging?
-
Traffic controled?
HAZ COM
-
Flammable liquids stored in metal cans and marked as to contents?
-
All flammable and toxic materials properly labeled
-
SDS notebook on site?
MATERIAL HANDLING
-
Fork lift operators certified?
-
Boom truck operators certified?
-
Boom truck operators check list complete?
-
Back up alarms functioning on all equipment?
-
Swing radius of boom truck blocked off?
-
Proper hoisting equipment inspected and used?
-
Signal person competent in task?
-
Rigger competent in task?
-
Boom truck set up on stable ground?
-
Proper truss setting techniques used per Habitat Wale Written Fall protection Plan?
VOLUNTEERS BREFING
-
Each group breifed on Safety Procedures for their tasks?
-
PPE provided to each volunteer?
-
All volunteers have signed in and provided emergency phone number?
-
All volunteers have signed Release Agreement?
-
Parental or Guardian Consent Form signed for volunteers under the age of 16?
INJURY, INCIDENT OR NEAR MISS REPORT
-
Were there any near misses reported?
-
were there any injuries reported?
-
Were there any incidents reported?
-
Give short description, with names.