HOME READY FOR INSPECTION
-
Was home ready for QA per schedule
COMMUNITY APPEARANCE
-
Is overall appearance up to Savvy Homes standards?<br>Signage / Marketing?<br>Street signs?<br>Clean streets?
EXTERIOR PHOTO OF PROPERTY
-
Attach photo of property
EXTERIOR ITEMS
-
Mailbox installed ,free of defects
-
Address numbers installed, free of defects
-
Water meter box level, free of defects
-
Concrete driveway clean ,free of defects
-
Concrete control joints tooled into slab
-
Lead walk clean, free of defects
-
Gutters, down spouts and splash blocks installed , free of defects
-
Window frames ,free of defects
-
Roof shingles clean , free of defects
-
Shutters installed , free of defects
-
Soffit level , free of defects
-
Fascia installed, free of defects
-
Siding level, plumb and painted, free of defects
-
Exterior trim caulked ,painted ,free of defects
-
Gable end trims installed, free of defects
-
All flashings installed ,painted,sealed
-
Front columns installed , free of defects
-
Masonry column bases square ,level, free of defects
-
Foundation fully parged,free of defects
-
Front porch clean, free of defects
-
Front handrails secure ,free of defects
-
Exterior entry light installed ,free of defects
-
Door bell installed in correct location and operational
-
A C pad level, free of defects
-
A C lines sealed
-
Condensation line exposed
-
Direct vent installed , free of defects
-
Gas line stubbed out,tested
-
Soffit vents installed , sealed
-
Rear concrete patio clean , free of defects
-
Concrete step pad clean , free of defects
-
Rear entry light installed ,operational,free of defects
LANDSCAPING
-
Yard graded properly,no signs of erosion
-
Beds mulched and tucked , free of debris
-
Sod free of debris,mud,sediment,dead sod
-
Seeded areas free of debris,mud,sediment
-
Plants alive and free of defects
-
Trees alive and staked
-
Clean outs cut to grade, painted
-
Area under wood deck graded and covered with pine straw
EXTERIOR MASONRY
-
Brick veneer complete clean, free of defects
-
Brick column bases square, level,free of defects
-
Brick clear caulked to doors,windows and trim
-
Brick lintels installed, painted
-
Brick row lock ,and soldier rows level, and pitched properly, free of defects
-
Weep holes open and free of debris
-
Black Step flashing installed, and sealed ,free of defects
-
Excess mortar cleaned from all surfaces
-
Stone veneer complete, clean ,free of defects
-
Weep screed installed
-
Stone column bases square ,level , free of defects
-
Stone veneer grouted to doors and windows
-
No broken stones
-
Stone band complete, free of defects
-
Head flashing installed at roof lines
PRESSURE TREATED DECKS
-
Deck boards installed clean free of stamps,tags or defects
-
All screws and nails set to proper depth
-
Deck is properly flashed
-
Deck posts are evenly spaced and secured properly
-
Rim joists are straight and free of defects
-
Handrails are routed for smooth edge and sanded, free of defects
-
Pickets are straight and evenly spaced
-
Deck is properly secured to house
-
All bracing is installed,bolted and free of defects
SCREENED PORCH
-
Screening complete , free of defects
-
Ceiling complete , free of defects
-
Beam wrap complete ,free of defects
-
Post wraps complete, free of defects
-
Screen door and hardware installed , free of defects
-
All caulking complete , free of defects
-
Screen porch sealed to home
-
Paint complete , free of defects
-
Light / fan installed ,operable, free of defects
CRAWL SPACE
-
Crawl space door and hardware installed ,caulked , painted and free of defects
-
Positive drain provided and clear of debris
-
Vapor barrier installed , free of defects
-
Foundation vents installed ,sealed and operable , free of defects
-
Crawl space light installed and operable
-
Crawl space clear of debris
-
Crawl space free of standing water
GARAGE AREAS
-
Electrical panel labeled , cover installed
-
All switch ,recp. cover installed
-
GFCI recp. installed
-
Water heater wiring complete
-
Water heater gas line secured
-
Water heater vented ( gas only )
-
Water heater platform clean free of defects
-
PRV install and labeled
-
Over head door installed ,operational and free of defects and tested
-
Over head door opener installed, operational
-
Overhead door w/ glass clean, free of defects
-
Garage floor clean free of defects
-
Concrete Control joints tooled into slab
-
Drywall complete free of defects
-
Fire door to home installed ,operational, free of defects
-
Personnel door installed ,operational ,free of defects<br>
-
All door hardware installed, clean,operational ,free of defects
-
Garage free of debris
-
Garage exterior lights installed ,operational ,free of defects
-
Pressure pump set up operational free of defects
INTERIOR ITEMS
FOYER
-
Front door paint complete
-
Front door hardware complete , operable
-
Front door weather strips free of defects
-
Threshold support installed , painted, free of defects
-
Threshold clean,adjusted,free of defects
-
Transom / sidelights glass clean
-
Proper transom molding installed
-
Drywall and paint touch up meet standards
-
Base,casing,crown,shoe complete ,free of defects
-
Entry floor clean free of defects
-
Check for floor squeaks
-
A/C vents straight,clean ,operable ,free of debris
-
Switch and recp. covers installed and level
-
Foyer light installed,clean,operable ,free of defects
-
Windows and locks clean, operable ,free of defects
-
Entry closet door operable
-
Entry closet door hardware clean,operable-<br>Knob,hinges,door stop
-
Closet interior complete
FAMILY ROOM/ DINNING ROOM / STUDY
-
Coffer ceiling free of defects
-
Base,casing,crown,chair rail,wainscoting complete free of defects
-
Windows and locks clean,operable,free of defects
-
Drywall and paint touch up meet standards
-
Floors clean,free of defects
-
Check for floor squeaks
-
Switch and recp. covers installed and level
-
A/C vents straight ,clean, operable, free of debris
-
Light / fixtures installed clean,free of defects
FIREPLACE
-
Two switches installed on side of fireplace
-
Gas logs installed
-
Gas logs operable ( gas community's only)
-
Fireplace face and grill installed clean,free of defects
-
Proper mantel installed, free of defects
-
Surround installed painted, caulked ,free of defects
-
Built ins complete, trimmed, shelves installed hardware installed
-
Stone veneer complete ,free of defects
KITCHEN
-
Base,casing,crown, shoe complete ,free of defects
-
Windows and locks clean,operable free of defects
-
Drywall and paint touch up meet standards
-
Floors clean ,free of defects
-
Check for floor squeaks
-
A/C vents straight ,clean , free of debris
-
Back door painted,free of defects
-
Back door hardware installed ,free of defects
-
Back door threshold support installed,painted,free of defects
-
Back door threshold clean adjusted,free of defects
-
Back door weather strips installed ,free of defects
-
Light fixtures install,operable ,free of defects
-
Switch and recp. covers installed ,level
-
Back splash recp. set at proper height ,level
-
GFCI installed
-
Island recp. install correct color
-
Disposal and dishwasher on separate switches ,operable
-
Tile back splash complete ,free of defects
-
Counter tops secured to wall,caulked,free of defects
-
Range and microwave installed , set up ,operable,free of defects
-
Anti tip device installed
-
Fridge installed hooked up ,free of defects
-
Sink clean,free of defects
-
Sink faucet operable free of defects
-
Cabinets clean and touched up
-
Cabinets complete,trim,shelves installed and supported,door bumpers
-
Toe kicks and shoe installed,put tied,free of defects
-
All cabinet hardware installed ,level,free of defects
-
Warranty drawer set up
-
Range
-
Microwave
-
Dishwasher
-
Fridge
-
Disposal
-
T-Stat
-
Fireplace
-
Garage door remotes
-
Sink strainers
PANTRY
-
Door and hardware operable , free of defects
-
Base , casing , shoe complete ,free of defects
-
Drywall and paint touch up meet standards
-
Flooring clean, free of defects
-
Shelving complete, free of defects
-
Light fixture operable , free of defects
-
PRV / Water main installed and marked
POWDER ROOM
-
Door and hardware operable , Free of defects
-
Base , casing , crown, shoe complete , free of defects
-
Drywall and paint touch up meet standards
-
Switches in correct order - cover plates installed , level
-
Lights / Fans operable , free of defects
-
GFCI installed
-
A/C vent straight , clean, free of debris
-
Mirror clean, level, free of defects
-
Bath accessories installed , level , free of defects
-
Floor clean, free of defects
-
Check for floor squeaks
-
All escussion plates installed , free of defects
-
Pedestal sink secure , free of defects
-
Sink faucet operable , free of defects
-
Toilet functions correctly shut offs operable ,lid secure
FIRST FLOOR HALL BATH
-
Door and hardware operable , free of defects
-
Base, casing, crown, shoe complete ,free of defects
-
Drywall and paint touch up meet standards
-
Switches in correct order covers installed level
-
Lights / Fan operable , free of defects
-
GFCI installed
-
Mirror clean,level , free of defects
-
Bath accessories install level , clean .free of defects
-
A/C vent straight ,clean ,free of debris
-
Floor clean , free of defects
-
Check for floor squeaks
-
Cabinets clean , touched up
-
Cabinets complete ,trimmed shelves installed , door bumps
-
Cabinet hardware installed , free of defects
-
Vanity top installed , caulked, free of defects
-
Vanity faucet installed , free of defects
-
All escussion plates installed
-
Toilet functions correctly , shut offs operable , lid secure
-
Tub /Shower installed free of defects
-
Tub/ Shower faucet operable
-
Shower/ Tub faucet operable, free of defects
FIRST FLOOR LAUNDRY ROOM
-
Door and hardware operable , free of defects
-
Base , casing, shoe complete ,free of defects
-
Drywall and paint touch up meet standards
-
Floor clean , free of defects
-
Check for floor squeaks
-
Shelving installed level , free of defects
-
Washer box installed ,free of defetcs
-
Clean out cover installed
-
Switch and recp. covers installed level
-
Light fixture installed , free of defects
-
Make air vent installed , free of defects
-
A/C vent straight ,clean ,free of debris
-
Dryer vent installed free of defects
-
Length of dryer vent
FIRST FLOOR HALLWAY
-
Location of area
-
Base, casing , crown, shoe complete , free of defects
-
Built ins complete free of defects
-
Drywall and paint touch up meet standards
-
Floor clean free of defects
-
Check for floor squeaks
-
Light fixtures operable , free of defects
-
Switch and recp. covers installed level
-
Thermostat installed level, clean , free of defects
-
A/C vent straight, clean , free of debris
-
Return air filter installed clean, free of defects
-
Smoke detector installed, operable
-
Window and locks free of defects
-
Closet doors and hardware operable , free of defects
-
Closet interior complete free of defects
-
Closet floor clean free of defects
FIRST FLOOR BEDROOM
-
Door and hardware operable free of defects
-
Base, casing and shoe free of defects
-
Drywall and paint touch up to standards
-
Floor clean and free of defects
-
Check for floor squeaks
-
Windows and locks clean , operable and free of defects
-
Switch and recp. covers installed , level
-
Light installed and operable
-
A/ C vents straight clean , free of debris
-
Smoke detector operable
MASTER BEDROOM
-
Doors and hardware operable , free of defects
-
Base ,casing , crown , shoe complete , free of defects
-
Drywall and paint touch up meet standards
-
Windows and locks operable , free of defects
-
A/C vent straight ,clean ,free of debris
-
Fan / Light operable , free of defects
-
Switch and recp. covers installed level
-
Smoke detectors installed , operable
-
Switches in correct order
-
Floor clean, free of defects
-
Check for floor squeaks
MASTER BATHROOM
-
Doors and hardware operable free of defects
-
Base, casing, crown, shoe complete , free of defects
-
Drywall and paint touch up meet standards
-
Lights and fan operable , free of defects
-
GFCI installed
-
Mirror clean , level ,free of defects
-
Bath accessories installed level , free of defects
-
Floor clean , free of defects
-
Check for floor squeaks
-
Cabinets clean, touched up
-
Cabinets complete, trimmed , shelves installed and supported, door bumps
-
Cabinet hardware installed , free of defects
-
Vanity top installed , caulked , free of defects
-
Vanity faucet installed operable , free of defects
-
All esscussion plates installed
-
Tub free of defects, buffed
-
Tub / shower faucet operable , free of defects
-
Shower enclosure clean , free of defects
-
Shower door clean , free of defects
-
Tile surrounds complete , free of defects
-
Toilet operable,shut off operable , lid secure
MASTER CLOSET
-
Door and hardware operable , free of defects
-
Base, casing and shoe free of defects
-
Drywall and paint touch up meet standards
-
Switch and recp. covers installed level
-
Light fixture installed , operable
-
Floor clean , free of defects
-
Check for floor squeaks
-
Window and locks operable
-
A/C vent straight , clean , free of debris
-
Shelving complete , level, free of defects
STAIRWAY
-
Drywall and paint touch up meet standards
-
Newell posts secure, free of defects
-
Pickets free of defects
-
Handrail stained , two coats of poly, smooth
-
Hand rail hardware secure, correct color
-
Picket wall trimmed ,free of defects
-
Knee wall secure
-
Cap board free of defects
-
Stringers free of defects
-
Treads free of defects
-
Risers free of defects
-
Carpet tight , free of defects
-
Stairs free from squeaks
SECOND FLOOR HALLWAY
-
Floor clean , free of defects
-
Check floor for squeaks
-
Drywall and paint touch up to standards
-
Base, casing, crown, shoe complete , free of defects
-
Closet doors and hardware operable , free of defects
-
Closet interior complete ,free of defects
-
Smoke detectors operable
-
A/C vents straight ,clean, free of debris
-
Thermostat installed level ,operable
-
Light fixtures installed ,operable
-
Switch and recp. covers installed level
-
Return filter clean free of defects
SECOND FLOOR LAUNDRY ROOM
-
Door and hardware operable , free of defects
-
Base , casing, shoe complete ,free of defects
-
Drywall and paint touch up meet standards
-
Floor clean , free of defects
-
Check for floor squeaks
-
Shelving / cabinets installed with hardware, free of defects
-
Light fixture operable, free of defects
-
Switch and recp. cover installed level
-
A/C vent straight , clean , free of debris
-
Washer box installed correctly
-
Clean out covers installed
-
Dryer vent installed
-
Length of dryer vent
SECOND FLOOR HALL BATH
-
Doors and hardware operable , free of defects
-
Base ,casing, shoe complete , free of defects
-
Drywall and paint touch up to standards
-
Window and locks operable, clean free of defects
-
Check switches in correct order
-
Switch and recp. covers installed level
-
Light / fan fixture operable , free of defects
-
GFCI installed
-
Mirror clean, level, free of defects
-
Bath accessories installed level, free of defects
-
Floor clean, free of defects
-
Check for floor squeaks
-
Cabinets clean, trimmed shelves installed , free of defects
-
Cabinet hardware installed , free of defects
-
Vanity top installed ,caulked, free of defects
-
Vanity faucet operable , free of defects
-
All esscussion plates installed
-
Toilet operable ,shut off operable ,lid secure
-
Tub / shower , free of defects ,buffed
-
Tub / shower faucet operable
BONUS ROOM
-
Location of room
-
Doors and hardware operable,free of defects
-
Base,casing,shoe complete,free of defects
-
Drywall and paint touch up meet standards
-
Windows and hardware operable,free of defects
-
Closet interior complete,free of defects
-
Light fixture operable , free of defects
-
Switch and recp. covers installed, level
-
Smoke detectors operable
-
A/C vent straight,clean,free of debris
-
Floor clean, free of defects
-
Check floor for squeaks
BEDROOM 1
-
Location of room
-
Door and hardware operable free of defects
-
Base , casing , shoe,complete, free of defects
-
Drywall and paint touch up meet standards
-
Windows and locks operable ,free of defects
-
Closet interior complete, free of defects
-
A/C vent straight ,clean, free of debris
-
Light fixture ,operable ,free of defects
-
Switch and recp. covers installed level
-
Smoke detectors operable
-
Floor clean, free of defects
-
Check for floor squeaks
BEDROOM 2
-
Doors and hardware operable, free of defects
-
Base , casing , shoe, complete, free of defects
-
Drywall and paint touch up meet standards
-
Windows and locks operable , free of defects
-
Closet interior complete , free of defects
-
A/C vent straight , clean , free of debris
-
Light fixture operable, free of defects
-
Switch and recp. covers installed level
-
Smoke detectors operable
-
Floor clean, free of defects
-
Check floor squeaks
BEDROOM 3
-
Location of room
-
Doors and hardware operable, free of defects
-
Base,casing,shoe complete free of defects
-
Drywall and paint touch up meet standards
-
Windows and locks operable, free of defects
-
Closet interior complete, free of defects
-
A/C vent straight ,clean ,free of debris
-
Light fixture operable, free of defects
-
Switch and recp. covers installed level<br>
-
Smoke detector operable
-
Floor clean, free of defects
-
Check for floor squeaks
BEDROOM 4
-
Location of room
-
Doors and hardware operable , free of defects
-
Base , casing, shoe complete ,free of defects
-
Drywall and paint touch up meet standards
-
Closet interior complete, free of defects
-
Windows and Locke operable , free of defects
-
A/C vent straight ,clean ,free of defects
-
Light fixture operable, free of defects
-
Switch and recp. covers installed ,level
-
Smoke detectors operable
-
Floor clean, free of defects
-
Check for floor squeaks
BONUS BATH
-
Doors and hardware operable , free of defects
-
Base , casing , shoe complete free of defects
-
Drywall and paint touch up meet standards
-
Switches in correct order
-
Light / fan fixtures operable ,free of defects
-
GFCI installed
-
Mirror clean, level, free of defects
-
Bath accessories install level , free of defects
-
Floor clean, free of defects
-
Check for floor squeaks
-
Cabinet hardware installed , free of defects
-
Cabinets clean ,trimmed ,shelves installed touched up,free of defects
-
Vanity top installed , caulked ,free of defects
-
Vanity faucet installed ,operable ,free of defects
-
All esscussion plate installed
-
Toilet operable , shut off operable, lid secure
-
Shower / Tub free of defects buffed
-
Shower / tub faucet operable , free of defects
-
A/C vents straight, clean , free of debris
ATTIC / SORAGE ROOM
-
Insulation installed
-
Light fixture operable, free of defects
-
Switch and recp. covers installed
-
Service recp. installed
-
Float switch connected
-
Extra floor materials stacked neatly
-
Area swept, free of debris
-
Pull down stairs equipped with pull rod, operable, free of defects
General
-
Power turned on
-
Water turned on
-
HVAC started up
-
Paint touch up kit on site