Title Page
-
Site Address:
-
Conducted on
-
Prepared by
-
Site Number:
Electrical
-
Was there a distribution board change?
-
Please provide photos
-
Have RCBO's been fitted?
-
Photos of fitted RCBO's
-
SPD installed?
-
Please provide photos
-
Board labelled correctly?
-
Please provide photos
-
Testing completed?
-
Completed by who?
Fire Detection System
-
System Installed?
-
Photo of panel
-
Was new spur installed?
-
Photo of new spur
-
Fire Document Box installed?
-
Photo of doc box installed
-
Was new wiring installed?
-
Photo of new wiring
-
Detectors fitted (in communal)
-
Photos
-
Detectors fitted (in properties)
-
Photos
-
Sample property number eg. (A, B, C or 1,2,3 etc)
-
Firemans Switch installed?
-
Lockable cover fitted to fireman switch?
-
FB padlock fitted to fireman switch?
-
Photo of completed fireman switch, closed, with padlock
-
Has a manual call point been fitted?
-
Has a cover been installed over call point?
-
Photo of call point and cover
-
Has building schematic been mounted in communal area?
-
Photo of schematic
-
Testing completed?
-
Completed by who?
Door Entry System
-
System installed?
-
Photo of panel
-
New wiring installed?
-
Photos of new wiring
-
Was existing wiring used?
-
Photos of existing wiring
-
Release keep installed?
-
Photo of release keep
-
Junction Boxes installed externally to flats?
-
Photos of junction boxes
-
Handsets installed in flats correctly?
-
Sample property number eg. A, B, C or 1,2,3 etc
-
Photo of handset in above property
-
Testing completed?
-
Completed by who?
Emergency Lighting
-
Emergency Lighting fitted?
-
How many lights fitted in property?
-
Photos of fitted emergency lights?
-
Was key switch installed?
-
Photo of key switch
-
Testing completed?
-
Completed by who?
Sign Off
-
Sign Off (engineer on site)