Title Page
-
Document No.
-
Site Health & Safety Inspection
-
Client
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Documentation
-
HSE F10 notification on display
-
Are placards and safety signage present and appropriate
-
Are records of inspections kept and upto date
-
Is the Construction Phase (Health & Safety) Plan present and upto date
-
Are site registers being kept and updated
-
Are the insurance certificates on display
Fire Precautions
-
Is there a means of detecting fire
-
Is there a means of raising the alarm
-
Are escape routes clear are they signed
-
Have fire points been sited are they fit for purpose
-
Are hotworks controlled are they adequate
-
Are flammable materials stored appropriately
Welfare set up
-
Are appropriate toilets provided
-
Are appropriate washing facilities provided
-
Has a drying room been provided
-
Have adequate messing facilities been provided
-
Is ventilation adequate
-
Does the lighting appear adequate for the tasks
-
Is the temperature acceptable
-
Have COSHH substances been stored correctly
-
Have COSHH assessments been carried out
-
Does the site have appropriate first aid arrangements in place
-
Are noisy areas identified
-
Is PPE routinely worn
-
Is the PPE appropriate to the hazard
Work at Height
-
Are scaffolds and towers erected correctly
-
Are scaffolds and towers inspected every 7 days
-
Have ladders and steps been inspected
-
Has edge protection been installed where appropriate
Excavations
-
Have the excavations been protected from collapse
-
Have the excavations been inspected before the shift
-
Has a suitable means of access and egress been established
Plant and equipment
-
Are plant operators competent
-
Is the plant being inspected is this recorded
-
Are tools fit for purpose
Services
-
Are temporary services trnsformed to v110
-
Have existing services been identified and marked on the plan
-
Are there any overhead services to be aware of
General
-
Is the site secure from trespass
-
Are the public protected from all works or work processes
-
Are all structures stable
-
Has a traffic management plan been implemented and communicated
-
Have measures to prevent drowning been implemented
-
Has all materials both construction and waste been stored appropriately
-
Have trip hazards been identified and measures put in place
-
Is the sites housekeeping adequate
-
Hazardous substances
-
Have all hazardous substances been identified
-
Is there a plan for locating previously unknown hazardous material
-
Is the information communicated to the work teams
-
Works to be suspended
-
Comments
-
Copy to Client office
-
Copy retained by Quoin
-
Issued by
-
Site Manager