Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Project Number

  • Project Start Date

  • Estimated Completion Date

Pre Site Audit Questions

  • Project Folder Server

  • Project Register Updated

  • Purchase Order Log

  • Tender Document

  • Sub-Contract Order

  • Risk Assessments & Method Statement

  • Waste Contractor - Insurance

  • Waste Contractor - Licence

  • Plant on Site

  • Hired in Plant

  • Sub-Contractors

  • Sub-Contractors

  • Sub-Contractors

Health & Safety

  • Site Safety Inductions - Have all Hazel & West staff & Hazel & West Sub-contractors been inducted and we hold copies within our site file?

  • Asbestos - Has a Asbestos R&D Survey been completed? have all Hazel & West Staff & Hazel & West Sub-contractors completed asbestos awareness training?

  • Welfare - Our adequate welfare facilities available for site staff?

  • Electricity - Are all electrical circuits suitably isolated? and or Temporary electrical supplies prior to works commencing?

  • Training - Are training records available for plant operators / operatives / site manager / site supervisors?

  • Accidents & Emergencies - Is the accident reporting procedure known and implemented?

  • Accidents & Emergencies - Are there sufficient qualified first aiders on site? Is there a first aid box available which is suitably stocked?

  • Fire & Emergencies - Is there a suitable fire & emergency plan prepared and displayed?

  • H&W Method Statements - Are they specific for the works being carried out?

  • H&W Risk Assessments - Are the risks identified relevant to the works being carried out and to an acceptable standard?

  • H&W Manual Handling Risk Assessment

  • H&W COSHH Assessments - Are material safety data sheets also held for each COSHH assessment in place?

  • Subcontractor Method Statements - Have they been appraised by Hazel & West Site Manager / management prior to commencing works?

  • Subcontractor Risk Assessments - Are the risks identified relevant to works and have they been appraised by Hazel & West management?

  • H&W Pre Start Health & Safety Checklist

  • H&W Weekly Health & Safety Inspections

  • HAV - Is the plant and equipment being used in a safe and appropriate manner? has the equipment/process been suitably assessed for noise/HAVS?

  • H&W Plant & Machinery Inspections / Registers

  • H&W Toolbox Talks

  • Excavation Checklist

  • Demolition / Soft Strip - Is demolition and or soft strip activity suitably managed and carried out in a safe manner by competent persons?

  • Lifting Plan

  • Mobile Tower Checklists - IPAF? Inspections?

  • Mobile Elevated work platforms - Are MEWPS being used in a safe manner by trained and competent operators?

  • Permits to Work

  • Tools / Calibration & PAT

  • PPE / Face Fit - Is suitable PPE provided and worn appropriate to the site conditions or task being carried out?

  • Site Vehicles - Are site vehicles parked in a safe manner? are company vehicles clean/tidy?

  • Site Housekeeping

QA Documentation

  • QA Brick & Blockwork Inspection

  • QA Concrete Inspection

  • QA Block Paving Inspection

  • QA Drainage Inspection

  • Quality Control - Internal Non-Conformances supplier / Sub-Contractor / Labour / Client / Environmental. Does the site manager have copies of company non-conformance forms?

  • Quality Control - Evidence of trade quality plan? Quality works sign off? Does the site manager hold a project final release/handover form?

Environment

  • General Waste - Are general skips free from WEEE and hazardous waste?

  • Waste Electrical Electronic Equipment - Is WEEE waste segregated and removed seperately from Hazardous and general waste?

  • Waste Licences - Are waste licences and duty of care notes held in the site file?

  • Hazardous Waste - Is hazardous waste contained correctly with consignment notes available?

  • Fuel Storage - Where fuel is stored are bunds in operational condition with spill kits available in strategic locations?

  • Static Plant - Are there drip trays under static plant?

  • Environmental Impacts - Has consideration been given to the possible impacts to air, water and waste pollution?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.