1.0 Site Set Up
-
Is the Health and Safety Plan available on site.
-
Are the Health and Safety Law posters displayed and filled in correctly.
-
Is the F10 Notification of Project available, dated and displayed on site.
-
Is Harbourview's Health and Safety Policy signed and displayed.
-
Ae all of the correct insurance documentation displayed.
-
Is there adequate signage on site identifying who the nominated first aider is.
-
Are the emergency procedures displayed.
-
Accident book available and up to date.
-
Suitable and sufficient first aid box available and stocked.
-
Fire extinguishers available in both the site office and site canteen.
-
Signing in procedure is in place and being used correctly.
-
Temporary electrical supply certificate has been provided (3 monthly)
2.0 Documentation
-
Are Risk Assessments available for all tasks and individual equipment.
-
Are Manual Handling Assessments available where necessary.
-
Are COSHH Assessments available on site for all substances.
-
Have all RAMS been authorised and signed by the Site Manager
-
Are safe systems of work clearly defined.
-
Have all workers / visitors been inducted before entering the development.
-
Are contractors documentation relevant to site safety dated and signed.
-
Are contractors Risk Assessments relevant to site, dated and signed.
-
Are HVD method statements in place and available.
-
Are the HVD method statements specific to the site, dated and signed by all applicable.
-
Are contractors method statements available.
-
Are the contractors method statements specific to the site, dated and signed by all applicable.
-
Are copies of competence certification filed on site.
-
Are Toolbox Talks being completed on a regular basis.
-
Have the minutes of the previous Toolbox Talk been produced and distributed.
-
Is there a Traffic Management Plan available on site
-
Have Fire Risk Assessments been completed for site.
-
Are the relevant work permits in place and being used correctly.
-
Have the weekly site inspections been completed by the Site Manager.
3.0 Work at Height - General
-
Risk Assessments are completed for all work at height (identify means of access)
-
Collective protection controls are used where reasonably practicable.
-
The means of access is suitable and sufficient for the task.<br>
-
Access to height is denied to unauthorised persons whilst left unattended.
-
The risk to falling materials is minimised at source where practicable (pre-cut materials).
-
Danger areas are excluded and signed (where materials can fall).
-
Two persons are always present whilst working at height.
-
A rescue plan is in place for persons working at height.
3.1 Working at Height - Scaffolding
-
A safe access is provided to the working platform.
-
Scaffold design is on site were scaffold is not a basic design.
-
Scaffold suitably tied to secure (tied every 4m or as designed).
-
Scaffolds on suitable foundations (sole boards 765mm min on soft / 500mm on firm).
-
Ledger bracing positioned either end, every other standard, top to bottom.
-
Handrails in place to protect all areas Min height 950mm.
-
Intermediate rails in place to protect all areas Max gap 470mm.
-
Overlapping boards secure and potential of tripping minimised (Plywood fillet).
-
Boards in good condition, laid safely and free of damage.
-
Suitable toe boards in place and secure.
-
Internal gap 150mm Max or rails and toe boards used.
-
Platforms tidy forming a safe walkway.
-
Incomplete scaffolding has suitable guarding, signed or blocked off.
-
Scaffolding erected by a competent person with copy of certification on site.
-
Recorded scaffolding inspections competed as required (at least weekly).
-
Scaffolding inspections clear identify the scaffolds inspected.
-
Suitable protection for members of the public, e.g. Double boarded over entrance, fan.
-
Ladders in good condition, secure and access hole is as small as reasonably practicable.
4.0 Construction Activities - General
-
Perimeter fencing secure and excludes access to site.
-
Perimeter fencing clearly signed, hazard signs, site entrance etc.
-
Heras fencing double clipped and secured at each end (boarded where needed).
-
Access routes clean, tidy and free from slips and trip hazards.
-
Warning signs are erected to warn of construction hazards.
-
Site entrances are protected from unauthorised access.
4.1 Construction Activities - Work Equipment
-
Dangerous / moving parts of machinery suitably guarded.
-
Equipment in good condition, removed from operation if damaged.
-
All electrical equipment is 110v.
-
Portable Appliance Tests completed (3 monthly).
-
Operatives trained in abrasive wheels and aware if good practice.
-
Operatives competent to use the work equipment provided.
4.2 Construction Activities - Plant
-
Vehicles driven safely and loaded safely by a competent trained person.
-
Trained, certificated Banks Man used for blind manoeuvres.
-
Risk Assessments carried out on each individual piece of mobile machinery.
-
Plant is in good condition and suitable of the tasks at hand.
-
Suitable safety procedures for working near electricity, fuel storage.
-
Plant and machinery left in safe condition when not in use.
4.3 Construction Activities - PPE
-
Hard hats available and worn where appropriate.
-
Respiratory protection available and worn where appropriate.
-
Ear protection available and worn where appropriate.
-
Safety footwear worn at all times.
-
Gloves available and being worn where appropriate.
-
Eye protection available and being worn where appropriate.
-
High Visibility jackets worn at all times.
-
Fall protection worn where appropriate.
-
PPE on site for all foreseeable tasks as per assessments.
4.4 Construction Activities - Excavations
-
Suitably prevented to protect a fall.
-
No heavy plant or machinery operating within 1m of excavation.
-
There is a safe access and egress.
-
Is the excavation suitably supported to prevent sides collapsing.
-
The excavations inspected periodically (minimum weekly).
-
Measures taken to identify underground services.
4.5 Construction Activities - Manual Handling
-
Mechanical aids and used where practical.
-
Correct lifting technique being used, sufficient number of people.
-
Weight of the load identified.
4.6 Construction Activities - Hazardous Substances
-
Control measure identified and adhered to I.e. PPE worn.
-
Stored correctly and safely to prevent damage or accidental release.
-
Stored in suitable containers and clearly marked.
-
Flammable substances stored safely (away from sources of ignition / combustibles)
-
Stored away from drainage and / or water sources.
4.7 Construction Activities - Lifting Operations
-
Lift plan completed for the lifting operations and signed by the relevant individuals.
-
Competent person identified as Appointed Person.
-
All lifting equipment are within their 12 month (6 for people) thorough inspection date.
-
All lifting appliances are within their 6 month thorough inspection date.
-
Competent slingers used to sling loads.
-
Lifts are being completed in accordance with the lift plan.
-
Lifting equipment and accessories are marked with the safe working load.
-
All persons are excluded from underneath any suspended load.
5.0 Welfare
-
Suitable toilet facilities available to operatives.
-
Heated drying room available.
-
Weather protection available to all personnel.
-
Water, hand wash and towels available as a minimum whilst construction.
-
Means of heating food available.
-
Drinking water available.
Corrective Actions
-
Enter any corrective actions that will be undertaken.
Sign Off
-
On Site Representative
-
Auditor's Signature