Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 Site Set Up

  • Is the Health and Safety Plan available on site.

  • Are the Health and Safety Law posters displayed and filled in correctly.

  • Is the F10 Notification of Project available, dated and displayed on site.

  • Is Harbourview's Health and Safety Policy signed and displayed.

  • Ae all of the correct insurance documentation displayed.

  • Is there adequate signage on site identifying who the nominated first aider is.

  • Are the emergency procedures displayed.

  • Accident book available and up to date.

  • Suitable and sufficient first aid box available and stocked.

  • Fire extinguishers available in both the site office and site canteen.

  • Signing in procedure is in place and being used correctly.

  • Temporary electrical supply certificate has been provided (3 monthly)

2.0 Documentation

  • Are Risk Assessments available for all tasks and individual equipment.

  • Are Manual Handling Assessments available where necessary.

  • Are COSHH Assessments available on site for all substances.

  • Have all RAMS been authorised and signed by the Site Manager

  • Are safe systems of work clearly defined.

  • Have all workers / visitors been inducted before entering the development.

  • Are contractors documentation relevant to site safety dated and signed.

  • Are contractors Risk Assessments relevant to site, dated and signed.

  • Are HVD method statements in place and available.

  • Are the HVD method statements specific to the site, dated and signed by all applicable.

  • Are contractors method statements available.

  • Are the contractors method statements specific to the site, dated and signed by all applicable.

  • Are copies of competence certification filed on site.

  • Are Toolbox Talks being completed on a regular basis.

  • Have the minutes of the previous Toolbox Talk been produced and distributed.

  • Is there a Traffic Management Plan available on site

  • Have Fire Risk Assessments been completed for site.

  • Are the relevant work permits in place and being used correctly.

  • Have the weekly site inspections been completed by the Site Manager.

3.0 Work at Height - General

  • Risk Assessments are completed for all work at height (identify means of access)

  • Collective protection controls are used where reasonably practicable.

  • The means of access is suitable and sufficient for the task.<br>

  • Access to height is denied to unauthorised persons whilst left unattended.

  • The risk to falling materials is minimised at source where practicable (pre-cut materials).

  • Danger areas are excluded and signed (where materials can fall).

  • Two persons are always present whilst working at height.

  • A rescue plan is in place for persons working at height.

3.1 Working at Height - Scaffolding

  • A safe access is provided to the working platform.

  • Scaffold design is on site were scaffold is not a basic design.

  • Scaffold suitably tied to secure (tied every 4m or as designed).

  • Scaffolds on suitable foundations (sole boards 765mm min on soft / 500mm on firm).

  • Ledger bracing positioned either end, every other standard, top to bottom.

  • Handrails in place to protect all areas Min height 950mm.

  • Intermediate rails in place to protect all areas Max gap 470mm.

  • Overlapping boards secure and potential of tripping minimised (Plywood fillet).

  • Boards in good condition, laid safely and free of damage.

  • Suitable toe boards in place and secure.

  • Internal gap 150mm Max or rails and toe boards used.

  • Platforms tidy forming a safe walkway.

  • Incomplete scaffolding has suitable guarding, signed or blocked off.

  • Scaffolding erected by a competent person with copy of certification on site.

  • Recorded scaffolding inspections competed as required (at least weekly).

  • Scaffolding inspections clear identify the scaffolds inspected.

  • Suitable protection for members of the public, e.g. Double boarded over entrance, fan.

  • Ladders in good condition, secure and access hole is as small as reasonably practicable.

4.0 Construction Activities - General

  • Perimeter fencing secure and excludes access to site.

  • Perimeter fencing clearly signed, hazard signs, site entrance etc.

  • Heras fencing double clipped and secured at each end (boarded where needed).

  • Access routes clean, tidy and free from slips and trip hazards.

  • Warning signs are erected to warn of construction hazards.

  • Site entrances are protected from unauthorised access.

4.1 Construction Activities - Work Equipment

  • Dangerous / moving parts of machinery suitably guarded.

  • Equipment in good condition, removed from operation if damaged.

  • All electrical equipment is 110v.

  • Portable Appliance Tests completed (3 monthly).

  • Operatives trained in abrasive wheels and aware if good practice.

  • Operatives competent to use the work equipment provided.

4.2 Construction Activities - Plant

  • Vehicles driven safely and loaded safely by a competent trained person.

  • Trained, certificated Banks Man used for blind manoeuvres.

  • Risk Assessments carried out on each individual piece of mobile machinery.

  • Plant is in good condition and suitable of the tasks at hand.

  • Suitable safety procedures for working near electricity, fuel storage.

  • Plant and machinery left in safe condition when not in use.

4.3 Construction Activities - PPE

  • Hard hats available and worn where appropriate.

  • Respiratory protection available and worn where appropriate.

  • Ear protection available and worn where appropriate.

  • Safety footwear worn at all times.

  • Gloves available and being worn where appropriate.

  • Eye protection available and being worn where appropriate.

  • High Visibility jackets worn at all times.

  • Fall protection worn where appropriate.

  • PPE on site for all foreseeable tasks as per assessments.

4.4 Construction Activities - Excavations

  • Suitably prevented to protect a fall.

  • No heavy plant or machinery operating within 1m of excavation.

  • There is a safe access and egress.

  • Is the excavation suitably supported to prevent sides collapsing.

  • The excavations inspected periodically (minimum weekly).

  • Measures taken to identify underground services.

4.5 Construction Activities - Manual Handling

  • Mechanical aids and used where practical.

  • Correct lifting technique being used, sufficient number of people.

  • Weight of the load identified.

4.6 Construction Activities - Hazardous Substances

  • Control measure identified and adhered to I.e. PPE worn.

  • Stored correctly and safely to prevent damage or accidental release.

  • Stored in suitable containers and clearly marked.

  • Flammable substances stored safely (away from sources of ignition / combustibles)

  • Stored away from drainage and / or water sources.

4.7 Construction Activities - Lifting Operations

  • Lift plan completed for the lifting operations and signed by the relevant individuals.

  • Competent person identified as Appointed Person.

  • All lifting equipment are within their 12 month (6 for people) thorough inspection date.

  • All lifting appliances are within their 6 month thorough inspection date.

  • Competent slingers used to sling loads.

  • Lifts are being completed in accordance with the lift plan.

  • Lifting equipment and accessories are marked with the safe working load.

  • All persons are excluded from underneath any suspended load.

5.0 Welfare

  • Suitable toilet facilities available to operatives.

  • Heated drying room available.

  • Weather protection available to all personnel.

  • Water, hand wash and towels available as a minimum whilst construction.

  • Means of heating food available.

  • Drinking water available.

Corrective Actions

  • Enter any corrective actions that will be undertaken.

Sign Off

  • On Site Representative

  • Auditor's Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.