Title Page
-
Conducted on
-
Officer Name
-
Note - Failure to complete a proper handover may result in disciplinary action!
Control Room
-
Off Duty Control Room Operative
-
On Duty Control Room Operative
Keys
-
Are all the keys accounted for?
Fire Panel
-
Has the status of the fire panel been accurately reflected on the Night Report.
Contractors
-
Contractors onsite
-
Time onsite
-
Company
-
Area of work
-
Type of work
-
Permission to work
- Permission to Work Issued
- Hot Work Issued
- Permission to Work signed off
- Area Checked, Hot Works Signed off
-
Time offsite
-
Comments
Contractors expected onsite
-
Time onsite
-
Company
-
Area of work
-
Type of work
-
Permission to work
- PTW on Notice Board
- Issue Routine PTW
- Issue Blank PTW
- PTW Not Needed
-
Comments
Tenants
-
Tenants onsite
-
Time onsite
-
Unit
-
Reason for visit
-
Activity
-
Time offsite
-
Comments
Control Room Checks
Equipment Checks
-
Are all the phones in working order
-
Are the Security, Cleaners and Retail bay stations and microphones working
-
Are all the hand held radios in working order
-
Is the control room computer working correctly
Paperwork
-
Does the DOB reflect all the days events including times management on/offsite
-
Are the Incident, Accident and Contractors files up to date (if not - update now)
-
LEVELS OF ALL PAPERWORK BELOW CHECKED AND ADEQUATE<br><br>Key register sheets, HSFO1 - Incident sheets, <br>Witness statement forms, <br>Fire Evacuation Deployment Register, Evacuation Check Sheets, <br>Permission to works - (check all), <br>SIA Check Sheets, Vehicle log sheets, Staff Time sheets
-
Comments
Control Room Cleaning
-
Has the Control Room been Swept and surfaces cleaned (to be done nightly)
-
Has the Control Room been Swept mopped and surfaces cleaned (to be done once per week by both night controllers)
-
Date officer swept, mopped and cleaned control room surfaces
-
Officer name and Signature
Notice boards
-
Are the notice boards up to date - All old documents removed
-
Are the Permission/Permit to works on the board in date
-
Has the day officer been made aware of all Permit/Permission to works, issued or not
Status Board
-
Does the status board reflect the state of the building and its equipment
-
Have the Batons been downloaded
-
Are the batons fully charged - if not have they been charged
Additional Information
Additional Information
-
Additional Information for the Day Control Room Operator
-
Off Duty Officers Name and Signature
-
On Duty Officers Name and Signature