Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
General
-
First aid kit on site
-
Employee(s) first aid trained for crew size
-
Emergency procedures posted and known
-
Emergency phone numbers posted
-
Safety meetings held: records kept
-
Safety inspections completed/recorded
-
Safety training
-
Orientations done for new hires
Fire
-
Fire extinguishers
-
Flammable materials stored properly
-
Smoking rules posted
-
Employees trained in extinguisher use
Housekeeping
-
General site housekeeping
-
Work areas
-
Aisles maintained
-
Waste container provided
-
Regular disposal of trash
-
Nails removed from lumber
Stairways
-
Treads safe and level
-
Handrails in place
-
Properly lighted
-
No tripping hazards
Personal Protective Equipment
-
Hard hat usage
-
Eye and face protection
-
Hand and arm protection
-
Fall arrest systems
-
Safety shoes
-
Hearing protection
Ladders
-
No cracks or splits
-
Properly secured when in use
-
Regularly inspected
Scaffolding
-
Guard rails and toe boards in place
-
Planks in good condition/secured
-
Proper access and egress
-
Wheels locked when in use
Swing staging
-
Properly rigged
-
Guardrails, toe boards and screening
-
Safe access and egress
-
Properly secured to building
Floor and Wall openings
-
Properly guarded with rails and toeboards
-
Workers protected from overhead hazards
-
Covers properly identified
Material handling equipment
-
Slings and cables in good condition
-
Communication adequate
-
Safe lifting techniques
-
Stable surface condition for cranes
Tools
-
Electric tools grounded
-
Powder actuated tools working properly
-
Operators trained and qualified
Electrical
-
Adequate extension cord size and length
-
Extension cords inspected
-
Overhead lines
-
Underground installations
-
Explosion proof fixtures
-
Temporary installations
Yards/Grounds
-
Drainage
-
Storage of material
-
Road signs/speed limits
-
Lighting
-
Parking/fencing
Hand tools
-
Proper tool being used for jobs
-
Stored neatly/carried safely
-
Inspected for wear/defects
-
Damaged tools tagged and removed
Concrete construction
-
Forms properly installed and braced
-
Adequate shoring, plumbed and braced
-
Heating devices inspected
-
Adequate runways/walkways
-
PPE provided for cement dust
Masonry work
-
Masonry saws properly equipped
-
Bracing of walls
Excavation and Trenching
-
Underground lines located/identifies
-
Shoring and sheathing as required for soil
-
Roads and sidewalks supported/protected
-
Adequate barriers and lighting at night
-
Materials stored away from trench edges
-
Equipment stored away from edges
-
Water controlled
-
Ladders or stairs provided
-
Equipment ramps available
-
Slopes not too steep
Temporary Heaters
-
Clear from flammables/combustibles
-
In good working condition
-
Sufficient ventilation
Demolition Work
-
Shoring bracing of adjacent structures
-
Electrical, water, sewer, steam lines cut off/locked out or tagged
-
Area roped off or barricaded
-
Proper warning signage used
-
Adequate ventilation/lighting
-
Material chutes used
-
Safe access provided
-
Overhead protection provided
-
Inspected by:
-
Site foreman: