Title Page

  • Quality Control safety visit whilst site is still in progress.

  • Conducted

  • Location
  • Job Number

  • Conducted By

Initial Checks

  • Dynamic Rick Assessment Completed?

  • What PPE is being used?

  • What PPE is in use?

  • Is additional PPE is required?

  • What is required?

  • Has all company vehicles been parked in a way not to cause a disruption?

Electrical Safety

  • All equipment has been PAT tested according to the policy?

  • Has a safe system of work been established? i.e. safe isolation?

  • Reduced voltage/ battery operated equipment is used where possible

  • Power cables are in good condition and located to prevent them being damaged or coming into contact with water

  • Test gear calibration checked and in date?

  • Other recommendations or observations?

Working at height

  • Is working at height part of the project?

  • Ladder Work

  • Defective or broken rungs/stiles/feet

  • The ladder is not fixed/tied and stable

  • Inclination is less or more than<br>roughly 4:1

  • Inappropriate choice of equipment for<br>the task

  • Inappropriate length for the task

  • Poor ground conditions (eg uneven /<br>soft ground / excess materials)

  • Other (eg over loaded / overreach to work area / resting on fragile or insecure surface / upside down, less than 3 points of contact)

  • Tower Scaffolding

  • Boards missing, damaged or<br>incorrect placement

  • Guardrails missing, damaged or<br>incorrect placement

  • Toeboards missing, damaged or<br>incorrect placement

  • Overhead hazards

  • Base of scaffold not locked in<br>position/poor ground/excess<br>materials

  • Outriggers/stabilisers missing or<br>damaged

  • Absent/insufficient safety and warning<br>signage (eg scafftags)

  • Other (eg inappropriate or missing internal access / inappropriate or missing material netting or guards / working outside the scaffold tower)

  • Step Ladders

  • The ladder is not fixed or tied and is stable

  • Defective or broken rungs/stiles/feet

  • Inappropriate height for the task

  • Poor ground conditions (eg uneven /<br>soft ground / excess materials)

  • Other (eg over loaded / overreach to work area / resting on fragile or insecure surface)

Site/ Customer

  • Is the site clean and tidy?

  • Have dust sheets been laid over floors where required?

  • Has a safe system of work been used to ensure the customer is kept safe?

  • Has consideration for other trades been made to ensure cooperation and safety of all on site?

  • Is the customer happy with the work taking place and understands what is involved?

  • Has the customer been walked through the job at the start?

  • Has the engineer used only one work zone at a time?

  • Has a safe zone been created for the customer?

Sign Off

  • Can the site be completed in a safe manner?

  • Is a further site visit required, to check for improved work practices?

  • When is a visit required

  • Is an off site meeting required to discuss finding on site?

  • What needs to be discussed, reasons for meeting? Please Detail.

  • Date for a meeting

  • Comments /Recommendations from this site visit?

  • Auditor

  • Auditor Position

  • Engineer 1:

  • Engineer Position

  • Engineer 2:

  • Engineer 3:

  • Date completed:

  • Engineer Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.