Title Page

  • Altrove Stage 6 25277 - Schofields (Slab and Date)

  • Document No.

  • Slab Preparation Inspection (Slab Only)

  • Trades Associated With Report

  • Conducted on

  • Add location
  • Prepared by

Inspection Items

  • Has the pier inspections past?

  • Has internal drainage been installed as per Hydraulics Plan?

  • Has under slab membrane been installed?

  • Have pest control collars been fitted to internal drainage?

  • Has formwork inspection been passed by the surveyor?

  • Has steel inspection passed?

  • If brick veneer, is the depth of the rebate a minimum of 160mm?

  • If Hebel , is the depth of the rebate 75mm?

  • Are the edge boards installed straight and plumb?

  • Has hot water, air-conditioner and watertank pads been installed as per plan?

  • Has D.E.B stepped a minimum of two courses with a minimum of 1 m between steps?

  • Is the D.E.B as per elevations plan?

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.