Information

  • HB Job No

  • Client name

  • Client contact details

  • Site Address

  • Site picture

  • Conducted on

  • Prepared by

General site information

Working hours

  • Mon-Fri

  • Sat - Sun

  • 08.30 - 16.30

  • Out of hours working e.g 18:00- 06:00

Type of premises

  • School

  • Office

  • Factory

  • Shop

  • Residential

  • Other

  • Other please state.

  • Picture of site

Survey details (if any)

  • Management survey

  • Refurbishment survey

  • Bulk samples only

  • Other please state

Vehicle access

  • Good

  • Poor

  • Other

  • Other please state

  • Picture where vehicles can be situated

Asbestos Type

  • Amosite

  • Chrysotile

  • Crocidolite

  • Other

  • Other please state

Type of application

  • Pipe work

  • Soffit

  • Ceiling

  • Wall

  • Debris

  • Floor

  • Beams/cross sections

  • Other

  • Other please state

  • Pictures of asbestos location

Specifications to be removed

  • Spray coating

  • Cement

  • Insulation

  • Asbestos insulation boarding

  • Textured coating

  • Encapsulation/environmental clean

  • Other

  • Other please state

Condition of asbestos

  • Good

  • Poor

  • Fair

  • Requires pre clean

  • Other please state

Existing services status (pipe work, plant)

  • In service

  • Off line

  • Redundant

  • N/A

  • Picture of any services

Site specific items

  • Number of operatives on site

  • Is the property vacant?

  • If not vacant what are the access arrangements?

Control measures to be taken

  • Fully controlled conditions

  • Semi controlled conditions

  • Minimum controls

  • CCTV to be used

  • Viewing panels to be used

  • Picture of area of work

Working techniques to be used

  • Injection machine

  • Spray bottle

  • Airless sprayer

  • Encapsulation

  • Encapsulation. Internal or external please specify

  • Wrap and cut

  • Shadow vac

  • Partial enclosure

  • Other please state

Access requirements

  • None

  • Ladders

  • Steps

  • Popup towers

  • Hop up

  • Tower scaffolding

  • Fixed scaffolding

  • Does the scaffolding need to be licensed?

  • Mobile elevated working platform

Type of air monitoring

  • 4 stage clearance

  • Reassurance

  • Personal, background and leaks

  • Perimeter testing

Quantity of asbestos waste and disposal

  • Enclosure size

  • Sq M / Lm of asbestos

  • Van for waste

  • Skip for waste

  • Will the client be providing waste disposal?

Fibre control equipment

  • 500 NPU

  • 1500 NPU

  • 4000 NPU

  • H type vac

  • Airless sprayer

  • Multi needle injection machine

Decontamination unit

  • Is water available on site at time of removal?

  • Picture of where water can be located

  • Is power available on site at time of removal?

  • Picture of where power can be located

  • Self contained to be used

Transit and waste route

  • Position of van

  • Picture and where van can be situated

  • Waste route to van

  • Position of skip

  • Picture of where skip can be situated

  • Waste route to skip

  • Position on DCU

  • Picture of where DCU can be located

  • Transit route to DCU

Safety wear

  • Full face mask

  • Half face mask

  • Type 5/6 disposable overalls

  • Safety boots

  • Gloves

  • Hard hats

  • Ear protection

  • Goggles

  • High vis vest

  • Harness

  • Other

  • Other please state

Non asbestos risk assessment

Access/egress

  • Any restricted areas?

  • Confined spaces ?

  • Work at height?

  • Work equipment?

  • Adequate lighting?

  • Fragile roofs?

  • Unstable work areas?

Work at height

  • Edge protection ?

  • Hand rails?

  • Harnesses?

  • Fragile roof?

  • Equipment?

Work environment

  • Is there adequate lighting?

  • Are the condition of the floors good?

  • Any spillages?

  • Are the stairs condition good?

  • Noise

  • Sharp surfaces

Services

  • Are services disconnected?

  • Are services concealed?

  • Gas

  • Water

  • Electric

Debris

  • Existing debris

  • Needles

  • Sharp objects

Waste disposal

  • Transit/waste route

  • Transfer notes required

  • Storage /skip area clear?

COSHH

  • Hazardous chemicals present or being used?

  • Special PPE needed?

Working area water

  • Is there area likely to flood?

  • Is the area of work near water?

Fire

  • Ignition source

  • Fuel present

  • Hot works

Health hazards

  • Hand arm vibration

  • Dermatitis

  • Leptospirosis

  • Manual handling

Welfare facilities

  • Supplied by client?

  • Supplied by HB?

  • Any other additional comments.

  • Diagram sketch

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.