Information
-
Job Name
-
Job Number
-
Conducted on
-
Survey conducted by
-
Location
-
Personnel on site
Fall Protection
-
Competent Person(s)
-
Are employees capable of falling 6 feet or greater?
-
Has fall protection been made available?
-
What fall protection is available?
- Harness & Lanyard
- Retractable Life Line
- Guardrail
- Hole Covers
- Safety Net
-
Is the fall protection adequate for the scope of work?
-
Has the employee(s) expected to use the fall protection equipment been formally trained on the use and maintenance of the equipment?
-
What is the condition of the fall protection equipment?
-
Is equipment properly labelled and legible?
-
Are there proper anchor points or places to "tie off" to?
Drill Rig(s):
-
Operator's Name
-
Have the Daily Equipment Inspection forms been completed for each shift?
-
Has the drill been properly set up?
-
Is the operator's manual available / on the rig?
-
Has swing radius protection been put into place?
-
Why is there no swing radius protection?
-
Has the rig been properly maintained?
-
Is there an adequate / ready-to-use fire extinguisher on the rig?
Crane(s)
-
Operator's Name
-
Does the operator have proper certification to run the crane?
-
Have the crane's daily inspection forms been completed for each shift?
-
Has the crane been properly erected?
-
Is the operator's manual available and in the crane?
-
Has swing radius protection been put into place?
-
Why is swing radius protection not in place?
-
Has crane been properly maintained?
-
Is a load rating chard available?
-
Is a boom angle indicator present?
-
Is there an adequate / ready-to-use fire extinguisher on the crane?
-
Is the crane fitted with any attachments? (i.e. Drill, Vibratory Hammer, Auger Cast)
-
What attachment is present?
Heavy Equipment (e.g. Endloaders / Forklifts / Bobcats)
-
Operator(s)' Name(s)
-
Is the operator(s) certified to operate the equipment?
-
Have the Daily Equipment Inspection forms been completed for each shift?
-
Are travel alarms present and operational?
-
Is the operator's manual available and in the equipment?
-
Does the operator demonstrate acceptable operation of the equipment?
-
Does the operator demonstrate proper shut down of the rig?
-
Is the equipment properly stored on the job site?
-
Are all employees aware of the equipment's work area(s)?
Rigging
-
Competent Person
-
Has signal person been formally trained on hand signals and demonstrates knowledge of signals?
-
Is rigging properly labelled and legible?
-
What is the condition of the nylon ropes?
-
What is the condition of the shackles?
-
Are the shackles adequate for the scope of work?
-
Are the wire rope slings in good condition? (No broken wires: 10 in 1 lay, 5 in 1 strand of a lay, 2 in eye)
-
What is the condition of the spreaders?
-
Are the hooks in good condition? (remove if bent, twisted, excessively worn, welded on, pitted)
-
Are hooks equipped with a double action safety latch?
-
What is the condition of the turnbuckles?
Personal Protective Equipment (PPE)
-
What PPE is being utilized?
- Hardhats
- Safety Glasses
- Gloves
- Respiratory Protection
- Hearing Protection
- Safety Vests
- Face Shields
- Buoyant Work Vest
- Tyvek Suits
- Other
-
Has employee(s) been properly fit tested and been administered a pulmonary test?
-
What other PPE is being utilized?
-
If you selected "Respiratory Protection", has employee(s) been fit tested and been administered a pulmonary test?
-
Do employees demonstrate acceptable use of PPE
-
Do employees demonstrate proper storage and maintenance of PPE?
-
Is selected PPE adequate for the scope of work?
Confined Spaces/Excavations
-
Competent Person(s)
-
Confined Space or Excavation?
-
-
Have proper permits been acquired?
-
Has confined space entree been formally trained and certified for confined space operations?
-
Is nearest fire department being notified of each entry into confined space?
-
Is pre-entry air monitoring being performed?
-
Is continuous air monitoring being performed?
-
Is forced air ventilation being utilized?
-
Are only intrinsically safe tools being utilized?
-
Are access and egress times being recorded?
-
How many access/egress points are available?
-
How many access/egress points are available?
-
Is there an adequate retrieval system available?
-
Is there a second employee always in eye sight of the employee in the confined space?
-
Have lock-out-tag-out procedures been utilized
-
Are proper postings being utilized?
-
Is there adequate lighting?
-
Has confined space entree been formally trained and certified on confined space operations?
-
Has pre-entry air monitoring been performed?
-
Has pre-entry air monitoring proven non-permit required conditions?
-
Is there proper ventilation?
-
Is a second employee present to monitor employee in confined space?
-
Is there an adequate retrieval system available?
-
Have proper postings been utilized? (i.e. "employee inside", etc.)
-
Is there adequate lighting
-
How many access/egress points are available?
-
How many access points are available?
-
How deep is the excavation? (in feet)
-
How wide is the excavation? (in feet)
-
Can excavation be considered a confined space?
-
Has pre-entry air monitoring been completed?
-
Is there proper ventilation?
-
How many access/egress points are available?
-
How many access/egress points are available?
-
Does the excavation have access/egress every 25 feet?
-
Is the excavation adequately shored / sloped / benched?
-
Has the entree been formally trained and certified on operations in an excavation?
Electrical
-
Are GFCIs being utilized?
-
Are GFCIs in good condition?
-
Are GFCIs tested regularly?
-
Is assured grounding being utilized?
-
Are tools properly grounded?
-
Are there overhead wires?
-
Are drill rigs, cranes, and other equipment capable of remaining outside of the minimum encroachment distances as regulated by OSHA?
-
Select the following safety procedures that have been enacted to encroach upon minimal clearance distance as per OSHA.
- Pre-Project Safety Meeting
- Machines Grounded
- Lines Blanketed / Marked Off
- 100% Spotter
- Lines De-energized
- Non-conductive Tooling
- Electrically Rated PPE
- Other
-
Please Specify
-
Are there underground wires?
-
Do we run the risk of contacting the underground lines?
-
Can the underground wires be shut of / moved?
-
Will we relocate or remove the points that put us at risk of contacting the wires?
-
Is the generator in proper working condition?
-
Is the generator adequately labelled for voltage output, danger, etc?
-
Is the generator grounded?
-
What is the condition of the electrical power tools?
-
What is the condition of the extension cords?
Housekeeping & Storage
-
Is site trash/debris being controlled?
-
Material properly stored?
-
Proper containers being utilized?
-
Site free of tripping hazards? (i.e. random wood, metal bands, etc.)
-
Conex box and/or gang box organized and free of clutter?
Welding & Cutting
-
Fire extinguisher available within 10 feet?
-
Welding / Cutting area free of combustibles?
-
Proper storage of compressed cylinders? (i.e. secured separately and upright, labelled, not in conex box or gang box, etc.)
-
Strikers being utilized to ignite torches?
-
Hoses / leads inspected regularly and bled after use?
-
Gauges in proper working orded?
Materials Handling
-
Proper lifting / bending / twisting and kept to a minimum?
-
Are mechanical assists or two-man lifts being utilized for heavy objects?
-
Hand free of pinch points?
-
Machine guards in place?
-
Hands located away from area casing is contacted by jaws?
Fire Safety
-
Fire extinguishers in working order?
-
Fire extinguishers inspected and maintained appropriately?
-
Good housekeeping practiced to prevent combustible materials from igniting?
-
Adequate flammable / combustible liquid storage? (i.e. fire cabinet, appropriate gas containers, etc.)
-
Fire watch being use whenever "hot work" is being done?
Project Set-Up
-
Emergency Number / Facilities identified and posted?
-
Utility locate provided?
-
Project Safety Plan completed?
-
Project Crew Safety Agreement signed?
-
Site-specific Training completed? (i.e. OSHA 10/30, HAZWOPER, MSHA 24hr, etc.)
Other
-
Emergency numbers / facilities identified and posted?
-
Safety Manual on site?
-
MSDS on site?
-
First-aid supplies / eyewash on available?
-
Weekly Tool Box Talk (TBT) completed?
-
Daily Task Analysis (DTA) / Job Hazard Analysis (JHA) completed each day?
-
Hosed whip-checked / pinned?
Corrective Actions
-
If any, please state corrective action(s) to be implemented on this site.
Comments
-
Please list any comments you may have on / for this site.
Surveyor's Signature
-
Surveyor's Name.
-
Surveyor's Signature.
On-Site Representative's Signature
-
On-Site Representative's Name.
-
Representative's Signature.